| | 26-99C | | | | | | | |
|
|---|
| | OTHER APPROPRIATIONS | | | | | | | |
|
|---|
| 1 | | Capital Outlay Budget | | | | | | | |
|
|---|
| | CAPITAL OUTLAY REQUESTS AND RECOMMENDATIONS BY PROJECT | | | | | | | |
|
|---|
| | WITH SOURCES OF FUNDING AND PROJECTED EXPENDITURES | | | | | | | |
|
|---|
| | TOTAL FIRST | | | TOTAL | RECOMMENDED | RECOMMENDED | | |
|
|---|
| PROJ. | FUNDING | YEAR REQUEST | REQUEST FOR | | PROJECT | BY GOVERNOR | BY GOVERNOR | | PRIORITY | REJECTION
|
|---|
| NO. | SOURCE | FY 1998-1999 | YEARS 2-5 | | REQUEST | FY 1998-1999 | YEARS 2-5 | PARISHES | CATEGORY | REASON
|
|---|
| 01 EXECUTIVE DEPARTMENT | | | | | | | | | |
|
| AGENCY: 107 DIVISION OF ADMINISTRATION | | | | | | | | | |
|
| 3 | | CAPITOL COMPLEX ACQUISITIONS, DEMOLITION, SITEWORK, CONSTRUCTION AND RENOVATION OF FACILITIES | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 40,845,000 | 139,986,000 | | 180,831,000 | 0 | 0 | | |
|
| | $40,845,000 | $139,986,000 | | $180,831,000 | $0 | $0 | | |
|
| 4 | | STATEWIDE ROOFING, WATERPROOFING, AND RELATED REPAIRS AND EQUIPMENT REPLACEMENT PROGRAM | | | | | | STATEWIDE | | 5
|
| STATE GENERAL FUND (DIRECT) | 15,000,000 | 55,939,000 | | 70,939,000 | 0 | 0 | | |
|
| | $15,000,000 | $55,939,000 | | $70,939,000 | $0 | $0 | | |
|
| 5 | | HAZARDOUS MATERIAL ABATEMENT PROJECTS | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | | 6,000,000 | | 6,000,000 | 0 | 0 | | |
|
| INTERAGENCY TRANSFERS | | 12,000,000 | | 12,000,000 | 0 | 0 | | |
|
| | $0 | $18,000,000 | | $18,000,000 | $0 | $0 | | |
|
| 6 | | AMERICANS WITH DISABILITIES ACT IMPLEMENTATION | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | | 3,000,000 | | 3,000,000 | 0 | 0 | | |
|
| | $0 | $3,000,000 | | $3,000,000 | $0 | $0 | | |
|
| 7 | | DOTD HQ BUILDING RENOVATION FLOORS 1-4, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 2,675,000 | 6,690,000 | | 9,365,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 275,000 | 0 | | |
|
| | $2,675,000 | $6,690,000 | | $9,365,000 | $275,000 | $0 | | |
|
| 9 | | EDUCATION BUILDING RENOVATION OR DEMOLITION/REPLACEMENT OF FACILITY | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 28,892,263 | | 28,892,263 | 0 | 0 | | |
|
| | $0 | $28,892,263 | | $28,892,263 | $0 | $0 | | |
|
| 10 | | NATURAL RESOURCES BUILDING RENOVATION OR DEMOLITION/REPLACEMENT OF FACILITY | | | | | | | |
|
| GENERAL OBLIGATION BONDS | | 31,269,816 | | 31,269,816 | 0 | 0 | | |
|
| | $0 | $31,269,816 | | $31,269,816 | $0 | $0 | | |
|
| 11 | | MAJOR REPAIRS, EQUIPMENT REPLACEMENT AND SITE WORK, FOR TECHNICAL COLLEGE CAMPUS BUILDINGS, PLANNING AND CONSTRUCTION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 10,000,000 | 25,160,000 | | 35,160,000 | 0 | 0 | | |
|
| | $10,000,000 | $25,160,000 | | $35,160,000 | $0 | $0 | | |
|
| 1373 | | EQUIPMENT REPLACEMENT, MAJOR REPAIRS AND RENOVATIONS | | | | | | STATEWIDE | | 5
|
| GENERAL OBLIGATION BONDS | 5,157,840 | 14,445,120 | | 19,602,960 | 0 | 0 | | |
|
| | $5,157,840 | $14,445,120 | | $19,602,960 | $0 | $0 | | |
|
| 1607 | | OLD GOVERNOR'S MANSION, RENOVATION, CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 400,000 | 0 | | |
|
| | $0 | $0 | | $0 | $400,000 | $0 | | |
|
| 1608 | | AUTOMATIC SPRINKLER PROTECTION FOR HIGHRISE STATE BUILDINGS, PLANNING AND CONSTRUCTION | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 5,115,000 | 0 | | |
|
| | $0 | $0 | | $0 | $5,115,000 | $0 | | |
|
| 1609 | | ENERGY CONSERVATION PROJECTS, PLANNING AND CONSTRUCTION | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 12 | | | | | | | | |
|
| AGENCY TOTAL | $73,677,840 | $323,382,199 | | $397,060,039 | $7,290,000 | $0 | | |
|
| AGENCY: 112 DEPT OF MILITARY AFFAIRS | | | | | | | | | |
|
| 526 | | REAL TIME HYDROLOGICAL DATA NETWORK | | | | | | STATEWIDE | | 5
|
| STATE GENERAL FUND (DIRECT) | 256,200 | 0 | | 256,200 | 0 | 0 | | |
|
| FEDERAL FUNDS | 256,200 | 0 | | 256,200 | 0 | 0 | | |
|
| | $512,400 | $0 | | $512,400 | $0 | $0 | | |
|
| 529 | | REGIONAL HAZARD MITIGATION PROJECT | | | | | | | |
|
| FEDERAL FUNDS | 1,800,000 | 9,200,000 | | 11,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,800,000 | 9,200,000 | | 11,000,000 | 0 | 0 | | |
|
| | $3,600,000 | $18,400,000 | | $22,000,000 | $0 | $0 | | |
|
| 531 | | BACKLOG MAINTENANCE AND REPAIR | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | 3,000,000 | 6,800,000 | | 9,800,000 | 0 | 0 | | |
|
| | $3,000,000 | $6,800,000 | | $9,800,000 | $0 | $0 | | |
|
| 532 | | INFRASTRUCTURE REHABILITATION | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | 3,000,000 | 0 | | 3,000,000 | 0 | 0 | | |
|
| | $3,000,000 | $0 | | $3,000,000 | $0 | $0 | | |
|
| 533 | | ZACHARY ARMORY ANNEX | | | | | | EAST BATON ROUGE | |
|
| STATE GENERAL FUND (DIRECT) | 1,795,000 | 0 | | 1,795,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | 5,165,000 | 0 | | 5,165,000 | 0 | 0 | | |
|
| | $6,960,000 | $0 | | $6,960,000 | $0 | $0 | | |
|
| 534 | | REPLACEMENT HOUSING - JACKSON BARRACKS | | | | | | ORLEANS | |
|
| STATE GENERAL FUND (DIRECT) | 300,000 | 900,000 | | 1,200,000 | 0 | 0 | | |
|
| | $300,000 | $900,000 | | $1,200,000 | $0 | $0 | | |
|
| 535 | | ARMORY COMPLEX | | | | | | RAPIDES | |
|
| STATE GENERAL FUND (DIRECT) | 1,691,100 | 0 | | 1,691,100 | 0 | 0 | | |
|
| FEDERAL FUNDS | 5,073,300 | 0 | | 5,073,300 | 0 | 0 | | |
|
| | $6,764,400 | $0 | | $6,764,400 | $0 | $0 | | |
|
| 536 | | SEWER TREATMENT PLANT | | | | | | RAPIDES | | 5
|
| FEDERAL FUNDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $1,200,000 | $0 | | $1,200,000 | $0 | $0 | | |
|
| 537 | | RANGE SUPPORT ROADS AND FACILITIES | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 0 | | 0 | 480,000 | 0 | | |
|
| FEDERAL FUNDS | 480,000 | 0 | | 480,000 | 0 | 0 | | |
|
| | $480,000 | $0 | | $480,000 | $480,000 | $0 | | |
|
| 538 | | KNOWN DISTANCE RANGE | | | | | | RAPIDES | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 589,200 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 589,200 | 0 | | 589,200 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 0 | | 0 | 589,200 | 0 | | |
|
| FEDERAL FUNDS | 589,200 | 0 | | 589,200 | 0 | 0 | | |
|
| | $1,178,400 | $0 | | $1,178,400 | $1,178,400 | $0 | | |
|
| 540 | | ORGANIZATIONAL MAINTENANCE SHOP- JACKSON BARRACKS | | | | | | ORLEANS | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,465,200 | 0 | | |
|
| FEDERAL FUNDS | 1,465,200 | 0 | | 1,465,200 | 0 | 0 | | |
|
| | $1,465,200 | $0 | | $1,465,200 | $1,465,200 | $0 | | |
|
| 541 | | MULTI-PURPOSE MACHINE GUN RANGE | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,486,800 | 0 | | |
|
| FEDERAL FUNDS | 1,486,800 | 0 | | 1,486,800 | 0 | 0 | | |
|
| | $1,486,800 | $0 | | $1,486,800 | $1,486,800 | $0 | | |
|
| 542 | | COMBAT PISTOL QUALIFICATION RANGE | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 0 | | 0 | 837,600 | 0 | | |
|
| FEDERAL FUNDS | 837,600 | 0 | | 837,600 | 0 | 0 | | |
|
| | $837,600 | $0 | | $837,600 | $837,600 | $0 | | |
|
| 543 | | MODIFIED RECORD FIRE RANGE | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,333,200 | 0 | | |
|
| FEDERAL FUNDS | 1,333,200 | 0 | | 1,333,200 | 0 | 0 | | |
|
| | $1,333,200 | $0 | | $1,333,200 | $1,333,200 | $0 | | |
|
| 544 | | READINESS CENTER REHABILITATION, AASF#1 | | | | | | ORLEANS | |
|
| STATE GENERAL FUND (DIRECT) | | 150,000 | | 150,000 | 0 | 0 | | |
|
| REIMBURSEMENT BONDS | | 450,000 | | 450,000 | 0 | 0 | | |
|
| | $0 | $600,000 | | $600,000 | $0 | $0 | | |
|
| 545 | | AASF #1 PARKING | | | | | | | |
|
| FEDERAL FUNDS | | 1,200,000 | | 1,200,000 | 0 | 0 | | |
|
| | $0 | $1,200,000 | | $1,200,000 | $0 | $0 | | |
|
| 546 | | ARMORY #1 REHABILITATION/ALTERATIONS | | | | | | ORLEANS | |
|
| STATE GENERAL FUND (DIRECT) | | 315,200 | | 315,200 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 945,600 | | 945,600 | 0 | 0 | | |
|
| | $0 | $1,260,800 | | $1,260,800 | $0 | $0 | | |
|
| 547 | | ARMORY #2 REHABILITATION/ALTERNATIONS | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | | 315,200 | | 315,200 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 945,600 | | 945,600 | 0 | 0 | | |
|
| | $0 | $1,260,800 | | $1,260,800 | $0 | $0 | | |
|
| 548 | | COMBINED SUPPORT MAINTENANCE SHOP | | | | | | RAPIDES | | 5
|
| STATE GENERAL FUND (DIRECT) | 1,900,000 | 20,900,000 | | 22,800,000 | 0 | 0 | | |
|
| | $1,900,000 | $20,900,000 | | $22,800,000 | $0 | $0 | | |
|
| 549 | | AASF #2 REHABILITATION | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 11,160,000 | | 11,160,000 | 0 | 0 | | |
|
| | $0 | $11,160,000 | | $11,160,000 | $0 | $0 | | |
|
| 550 | | TRAINING SITE DINING FACILITY | | | | | | RAPIDES | |
|
| FEDERAL FUNDS | | 960,000 | | 960,000 | 0 | 0 | | |
|
| | $0 | $960,000 | | $960,000 | $0 | $0 | | |
|
| 551 | | 200 PERSON NATIONAL GUARD ARMORY - PINEVILLE | | | | | | RAPIDES | |
|
| STATE GENERAL FUND (DIRECT) | | 1,691,000 | | 1,691,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 5,073,000 | | 5,073,000 | 0 | 0 | | |
|
| | $0 | $6,764,000 | | $6,764,000 | $0 | $0 | | |
|
| 552 | | 400 PERSON ARMORY | | | | | | ORLEANS | |
|
| STATE GENERAL FUND (DIRECT) | | 1,351,000 | | 1,351,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 3,977,000 | | 3,977,000 | 0 | 0 | | |
|
| | $0 | $5,328,000 | | $5,328,000 | $0 | $0 | | |
|
| 553 | | MONROE READINESS CENTER REHABILITATION | | | | | | OUACHITA | |
|
| STATE GENERAL FUND (DIRECT) | | 300,000 | | 300,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 900,000 | | 900,000 | 0 | 0 | | |
|
| | $0 | $1,200,000 | | $1,200,000 | $0 | $0 | | |
|
| 1595 | | ARMY AVIATION SUPPORT FACILITY #2 | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 388,600 | 0 | | 388,600 | 0 | 0 | | |
|
| | $388,600 | $0 | | $388,600 | $0 | $0 | | |
|
| 1596 | | LAKE CHARLES ORGANIZATIONAL MAINTENANCE SHOP | | | | | | CALCASIEU | | 5
|
| STATE GENERAL FUND (DIRECT) | 1,824,000 | 0 | | 1,824,000 | 0 | 0 | | |
|
| | $1,824,000 | $0 | | $1,824,000 | $0 | $0 | | |
|
| 1610 | | BATCHELOR OFFICER'S QUARTERS RENOVATION (HUFFT HALL), PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 230,000 | 0 | | |
|
| | $0 | $0 | | $0 | $230,000 | $0 | | |
|
| 1611 | | FORMER DEPARTMENT OF CORRECTIONS BUILDINGS RENOVATION, PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 710,000 | 0 | | |
|
| | $0 | $0 | | $0 | $710,000 | $0 | | |
|
| 1612 | | ARMORY BACKLOG OF MAINTENANCE AND REPAIR, PLANNING AND CONSTRUCTION | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 29 | | | | | | | | |
|
| AGENCY TOTAL | $36,230,600 | $76,733,600 | | $112,964,200 | $10,221,200 | $0 | | |
|
| AGENCY: 130 DEPT OF VETERANS AFFAIRS | | | | | | | | | |
|
| 524 | | NORTHWEST LA WAR VETS HOME | | | | | | BOSSIER | | 5
|
| STATE GENERAL FUND (DIRECT) | 5,041,397 | 0 | | 5,041,397 | 0 | 0 | | |
|
| FEDERAL FUNDS | 9,362,595 | 0 | | 9,362,595 | 0 | 0 | | |
|
| | $14,403,992 | $0 | | $14,403,992 | $0 | $0 | | |
|
| 525 | | SOUTHEAST LA WAR VETS HOME | | | | | | ST. BERNARD | | 5
|
| STATE GENERAL FUND (DIRECT) | 5,041,397 | 0 | | 5,041,397 | 0 | 0 | | |
|
| FEDERAL FUNDS | 9,362,595 | 0 | | 9,362,595 | 0 | 0 | | |
|
| | $14,403,992 | $0 | | $14,403,992 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $28,807,984 | $0 | | $28,807,984 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 43 | | | | | | | | |
|
| DEPARTMENT TOTAL | $138,716,424 | $400,115,799 | | $538,832,223 | $17,511,200 | $0 | | |
|
| 04 ELECTED OFFICIALS | | | | | | | | | |
|
| AGENCY: 139 SECRETARY OF STATE | | | | | | | | | |
|
| 15 | | DESIGN STUDY FOR RENOVATIONS/ADDITIONS/ELECTRICAL IMPROVEMENTS/SITE IMPROVEMENTS AND ADDITIONAL PARKING TO STATE ARCHIVES BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 657,000 | 0 | | 657,000 | 0 | 0 | | |
|
| | $657,000 | $0 | | $657,000 | $0 | $0 | | |
|
| 16 | | DESIGN AND CONSTRUCTION OF RENOVATIONS, RESTORATIONS, AND ADDITIONS TO OLD STATE CAPITOL BUILDING INCLUDING SITE IMPROVEMENTS TO GROUNDS AND ACQUISITION OF EXISTING PARKING LOT ADJACEN | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 2,359,650 | 0 | | 2,359,650 | 0 | 0 | | |
|
| | $2,359,650 | $0 | | $2,359,650 | $0 | $0 | | |
|
| 17 | | COMPLETION OF CONSTRUCTION/DEVELOPMENT OF MUSEUM COMPLEX AND GROUNDS | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 255,000 | 0 | | 255,000 | 0 | 0 | | |
|
| | $255,000 | $0 | | $255,000 | $0 | $0 | | |
|
| 18 | | REDESIGN OF GREENWOOD ROAD ENTRANCE TO MUSEUM, INCLUDING STREET SIGN AND SITE IMPROVEMENT; RESTORATION AND PRESERVATION OF EXISTING FRESCO AT MUSEUM'S MAIN ENTRANCE SUGGEST THIS IS | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 525,000 | 0 | | 525,000 | 0 | 0 | | |
|
| | $525,000 | $0 | | $525,000 | $0 | $0 | | |
|
| 19 | | INSTALLATION OF CENTRAL A/C SYSTEM FOR EXHIBIT BUILDING; EXHIBIT DESIGN AND CONSTRUCTION; ACQUISITION OF LAND (SUGGEST RENAMING PROJECT: RENOVATIONS AND ACQUISITIONS FOR MUSEUM) KW | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 231,000 | 0 | | 231,000 | 0 | 0 | | |
|
| | $231,000 | $0 | | $231,000 | $0 | $0 | | |
|
| 20 | | ACQUISITION, RELOCATION, AND INSTALLATION OF STRUCTURES RELATIVE TO SUGAR PLANTATION SETTING | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 180,000 | 0 | | 180,000 | 0 | 0 | | |
|
| | $180,000 | $0 | | $180,000 | $0 | $0 | | |
|
| 21 | | COMPLETION OF CONSTRUCTION/DEVELOPMENT OF MUSEUM COMPLEX AND GROUNDS, ACQUISITION OF 20 ACRES | | | | | | EAST CARROLL | | 5
|
| GENERAL OBLIGATION BONDS | | 110,000 | | 110,000 | 0 | 0 | | |
|
| | $0 | $110,000 | | $110,000 | $0 | $0 | | |
|
| 22 | | COMPLETION OF CONSTRUCTION/DEVELOPMENT OF MUSEUM, ACQUISITION OF LARGE ARTIFACTS COMPLEX AND GROUNDS | | | | | | EAST CARROLL | | 5
|
| GENERAL OBLIGATION BONDS | | 52,000 | | 52,000 | 0 | 0 | | |
|
| | $0 | $52,000 | | $52,000 | $0 | $0 | | |
|
| 23 | | COMPLETION OF CONSTRUCTION/DEVELOPMENT OF MUSEUM, COMPLEX AND GROUNDS, ACQUISITION OF LARGE ARTIFACTS | | | | | | EAST CARROLL | | 5
|
| GENERAL OBLIGATION BONDS | | 51,500 | | 51,500 | 0 | 0 | | |
|
| | $0 | $51,500 | | $51,500 | $0 | $0 | | |
|
| 24 | | COMPLETION OF CONSTRUCTION/DEVELOPMENT OF MUSEUM COMPLEX AND GROUNDS | | | | | | EAST CARROLL | | 5
|
| GENERAL OBLIGATION BONDS | | 51,000 | | 51,000 | 0 | 0 | | |
|
| | $0 | $51,000 | | $51,000 | $0 | $0 | | |
|
| 25 | | CONSTRUCTION OF ADDITION/RENOVATION/SITE IMPROVEMENT/RENOVATION OF ELECTRICAL SYSTEM | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 1,000,000 | | 1,000,000 | 0 | 0 | | |
|
| | $0 | $1,000,000 | | $1,000,000 | $0 | $0 | | |
|
| 26 | | COMPLETION OF CONSTRUCTION OF ADDITION/RENOVATION/SITE IMPROVEMENT/RENOVATION OF ELECTRICAL SYSTEM | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 540,000 | | 540,000 | 0 | 0 | | |
|
| | $0 | $540,000 | | $540,000 | $0 | $0 | | |
|
| 27 | | ACQUISITION OF EQUIPMENT AND FURNISHINGS FOR ADDITION TO STATE ARCHIVES BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 200,000 | | 200,000 | 0 | 0 | | |
|
| | $0 | $200,000 | | $200,000 | $0 | $0 | | |
|
| 28 | | ACQUISITION OF SHELVING FOR STATE ARCHIVES BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 60,000 | | 60,000 | 0 | 0 | | |
|
| | $0 | $60,000 | | $60,000 | $0 | $0 | | |
|
| 29 | | DESIGN AND INSTALLATION OF PORTABLE SEATING FOR HOUSE CHAMBER; DESIGN OF EXHIBITS AND CABINETRY. | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 740,000 | | 740,000 | 0 | 0 | | |
|
| | $0 | $740,000 | | $740,000 | $0 | $0 | | |
|
| 30 | | CONSTRUCTION OF EXHIBITS AND CABINETRY - CAMPAIGNS AND ELECTRICTIONS ROOM. | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 250,000 | | 250,000 | 0 | 0 | | |
|
| | $0 | $250,000 | | $250,000 | $0 | $0 | | |
|
| 31 | | CONSTRUCTION OF EXHIBITS AND CABINETRY - LOUISIANA HISTORY. | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 250,000 | | 250,000 | 0 | 0 | | |
|
| | $0 | $250,000 | | $250,000 | $0 | $0 | | |
|
| 32 | | CONSTRUCTION OF EXHIBITS AND CABINETRY - STATE HOUSE. | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 150,000 | | 150,000 | 0 | 0 | | |
|
| | $0 | $150,000 | | $150,000 | $0 | $0 | | |
|
| 33 | | ADDITION OF SECURITY LIGHTING AND CAMERAS FOR MUSEUM GROUNDS (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 175,000 | | 175,000 | 0 | 0 | | |
|
| | $0 | $175,000 | | $175,000 | $0 | $0 | | |
|
| 34 | | RESTORATION AND REBUILDING OF EXISTING FOUNTAIN IN MUSEUM ROTUNDA, INCLUDING SITE IMPROVEMENTS, SEATING, AND LIGHTING (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 215,000 | | 215,000 | 0 | 0 | | |
|
| | $0 | $215,000 | | $215,000 | $0 | $0 | | |
|
| 35 | | RENOVATION OF AUDITORIUM FOR INSTALLATION OF AUDIO/VISUAL SYSTEM (SUGGEST COMBING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 450,000 | | 450,000 | 0 | 0 | | |
|
| | $0 | $450,000 | | $450,000 | $0 | $0 | | |
|
| 36 | | CONSTRUCTION OF MUSEUM GIFT SHOP AND FOOD SERVICE/CATERING FACILITIES (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 150,000 | | 150,000 | 0 | 0 | | |
|
| | $0 | $150,000 | | $150,000 | $0 | $0 | | |
|
| 37 | | CONSTRUCTION OF PARKING LOT AND LIGHTING; SITE IMPROVEMENT (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 105,000 | | 105,000 | 0 | 0 | | |
|
| | $0 | $105,000 | | $105,000 | $0 | $0 | | |
|
| 38 | | MOVE AND RESTORE RAILROAD CABOOSE, RESTORE RAILROAD DEPOT, RESTORE/REBUILD STANDARD RIG EXHIBIT, RESTORE TREES BANK/OFFICE BUILDING (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 120,000 | | 120,000 | 0 | 0 | | |
|
| | $0 | $120,000 | | $120,000 | $0 | $0 | | |
|
| 39 | | RENOVATION AND REPAIR OF MUSEUM BUILDINGS (SUGGEST COMBINING WITH OTHER PROJECTS)KWJ | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 60,000 | | 60,000 | 0 | 0 | | |
|
| | $0 | $60,000 | | $60,000 | $0 | $0 | | |
|
| 40 | | ACQUISITION OF ARTIFACTS, IMPLEMENTS, AND MACHINERY RELATING TO THE OIL INDUSTRY (SUGGEST COMBINING WITH OTHER PROJECTS) | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 55,000 | | 55,000 | 0 | 0 | | |
|
| | $0 | $55,000 | | $55,000 | $0 | $0 | | |
|
| 41 | | ACQUISITION OF NEIGHBORING PROPERTY AND ADDITIONAL OUTBUILDINGS | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | | 51,000 | | 51,000 | 0 | 0 | | |
|
| | $0 | $51,000 | | $51,000 | $0 | $0 | | |
|
| 42 | | SURVEY, PLAN, AND CONSTRUCTION OF PARKING LOT AND LIGHTING | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | | 60,000 | | 60,000 | 0 | 0 | | |
|
| | $0 | $60,000 | | $60,000 | $0 | $0 | | |
|
| 43 | | CONSTRUCTION OF PERMANENT EXHIBIT SHOWCASING HISTORICAL ASPECTS OF HOUSE AND AREA | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | | 55,000 | | 55,000 | 0 | 0 | | |
|
| | $0 | $55,000 | | $55,000 | $0 | $0 | | |
|
| 44 | | CONSTRUCTION OF BLACKSMITH SHOP AND PURCHASE OF IMPLEMENTS TO PERIOD AUTHENTICITY | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | | 58,000 | | 58,000 | 0 | 0 | | |
|
| | $0 | $58,000 | | $58,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 30 | | | | | | | | |
|
| AGENCY TOTAL | $4,207,650 | $5,008,500 | | $9,216,150 | $0 | $0 | | |
|
| AGENCY: 144 COMMISSIONER OF ELECTIONS | | | | | | | | | |
|
| 45 | | ELECTRONIC VOTING MACHINE ACQUISITION | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 12,048,000 | 0 | | 12,048,000 | 0 | 0 | | |
|
| | $12,048,000 | $0 | | $12,048,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $12,048,000 | $0 | | $12,048,000 | $0 | $0 | | |
|
| AGENCY: 160 AGRICULTURE AND FORESTRY | | | | | | | | | |
|
| 46 | | OFFICE BUILDING FOR THE DEPARTMENT AGRICULTURE AND FORESTRY CONSTRUCTION OF NEW BUILDING | | | | | | TANGIPAHOA | | 5
|
| STATE GENERAL FUND (DIRECT) | 524,644 | 0 | | 524,644 | 0 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 112,556 | 0 | | 112,556 | 0 | 0 | | |
|
| | $637,200 | $0 | | $637,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $637,200 | $0 | | $637,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 32 | | | | | | | | |
|
| DEPARTMENT TOTAL | $16,892,850 | $5,008,500 | | $21,901,350 | $0 | $0 | | |
|
| 05 DEPT OF ECONOMIC DEVELOPMENT | | | | | | | | | |
|
| AGENCY: 251 ECON DEV - OFF OF SECRETARY | | | | | | | | | |
|
| 1613 | | STATE HIGHWAY 308 RELOCATION, PLANNING, ENGINEERING, RIGHT OF WAY, UTILITIES, AND CONSTRUCTION | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,600,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,600,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $1,600,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 1 | | | | | | | | |
|
| DEPARTMENT TOTAL | $0 | $0 | | $0 | $1,600,000 | $0 | | |
|
| 06 DEPT OF CULTURE, REC & TOURISM | | | | | | | | | |
|
| AGENCY: 262 OFF OF THE STATE LIBRARY OF LA | | | | | | | | | |
|
| 1614 | | STATE LIBRARY BUILDING EXPANSION, CONSTRUCTION AND EQUIPMENT | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,110,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,110,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $1,110,000 | $0 | | |
|
| AGENCY: 263 OFFICE OF STATE MUSEUM | | | | | | | | | |
|
| 51 | | BATON ROUGE BRANCHLOUISIANA STATE MUSEUM CAPITOL COMPLEX AREA | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 525,545 | 9,480,997 | | 10,006,542 | 0 | 0 | | |
|
| | $525,545 | $9,480,997 | | $10,006,542 | $0 | $0 | | |
|
| 52 | | WEDELL-WILLIAMS AVIATION AND CYPRESS SAWMILL MUSEUM COMPLEX BRANCH PLANNING AND NEW CONSTRUCTION | | | | | | ST. MARY | |
|
| GENERAL OBLIGATION BONDS | 201,527 | 2,276,791 | | 2,478,318 | 0 | 0 | | |
|
| | $201,527 | $2,276,791 | | $2,478,318 | $0 | $0 | | |
|
| 53 | | NATCHITOCHES OLD COURTHOUSE BRANCH MUSEUM, PLANNING AND RENOVATION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 5,224,480 | 50,000 | | 5,274,480 | 0 | 0 | | |
|
| | $5,224,480 | $50,000 | | $5,274,480 | $0 | $0 | | |
|
| 1374 | | STATE MUSEUM COLLECTIONS MANAGEMENT/STORAGE FACILITY PURCHASE AND RENOVATION, PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,430,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,180,000 | 0 | | |
|
| | $0 | $0 | | $0 | $3,610,000 | $0 | | |
|
| 1615 | | LOWER PONTALBA HALLWAY RENOVATION AND ABATEMENT PROJECT, PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 940,000 | 0 | | |
|
| | $0 | $0 | | $0 | $940,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $5,951,552 | $11,807,788 | | $17,759,340 | $4,550,000 | $0 | | |
|
| AGENCY: 264 OFFICE OF STATE PARKS | | | | | | | | | |
|
| 54 | | RAIL/TRAIL STATE TRAIL ACQUISITION | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | | 300,000 | | 300,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 300,000 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $300,000 | $0 | | |
|
| 55 | | PREVENTATIVE MAINTENANCE/MAJOR REPAIRS AND IMPROVEMENTS - ACT 729 | | | | | | STATEWIDE | |
|
| FEES AND SELF GENERATED REVENUES | 2,500,000 | 0 | | 2,500,000 | 0 | 0 | | |
|
| LA. STATE PARKS IMPROVEMENT AND REPAIR FUND | | 0 | | 0 | 2,500,000 | 0 | | |
|
| | $2,500,000 | $0 | | $2,500,000 | $2,500,000 | $0 | | |
|
| 56 | | LOS ADAES SCA - PLANNING DEVELOPMENT AND ACQUISITION | | | | | | NATCHITOCHES | | 5
|
| GENERAL OBLIGATION BONDS | | 3,460,000 | | 3,460,000 | 0 | 0 | | |
|
| | $0 | $3,460,000 | | $3,460,000 | $0 | $0 | | |
|
| 57 | | LAKE CLAIBORNE STATE PARK - LAND ACQUISITION | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS | | 110,000 | | 110,000 | 0 | 0 | | |
|
| | $0 | $110,000 | | $110,000 | $0 | $0 | | |
|
| 58 | | LAKE CLAIBORNE SP -PHASE 3 PLANNING - CONSTRUCTION | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS | | 2,134,000 | | 2,134,000 | 0 | 0 | | |
|
| | $0 | $2,134,000 | | $2,134,000 | $0 | $0 | | |
|
| 59 | | PALMETTO ISLAND SP DEVELOPMENT | | | | | | VERMILION | |
|
| GENERAL OBLIGATION BONDS | 8,322,761 | 0 | | 8,322,761 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 4,150,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 3,675,000 | 0 | | |
|
| | $8,322,761 | $0 | | $8,322,761 | $7,825,000 | $0 | | |
|
| 60 | | BOGUE CHITTO SP - CONSTRUCTION OF NEW STATE PARK | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 14,749,800 | | 14,749,800 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 2,000,000 | 0 | | |
|
| | $0 | $14,749,800 | | $14,749,800 | $2,000,000 | $0 | | |
|
| 61 | | FONTAINEBLEAU STATE PARK - DEVELOPMENT, PLANNING AND CONSTRUCTION | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 753,500 | 82,075,000 | | 82,828,500 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 735,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 8,205,000 | 0 | | |
|
| | $753,500 | $82,075,000 | | $82,828,500 | $8,940,000 | $0 | | |
|
| 62 | | WATSON BRAKE SCA - LAND ACQUISITION | | | | | | OUACHITA | |
|
| STATE GENERAL FUND (DIRECT) | 95,000 | 0 | | 95,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 95,000 | 0 | | |
|
| | $95,000 | $0 | | $95,000 | $95,000 | $0 | | |
|
| 63 | | CHICOT STATE PARK - REPLACE CABINS AND POOL, PLANNING AND CONSTRUCTION | | | | | | EVANGELINE | |
|
| GENERAL OBLIGATION BONDS | 358,800 | 4,117,900 | | 4,476,700 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 315,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 3,565,000 | 0 | | |
|
| | $358,800 | $4,117,900 | | $4,476,700 | $3,880,000 | $0 | | |
|
| 64 | | LITTLE PECAN ISLAND - LAND ACQUISITION | | | | | | CAMERON | |
|
| GENERAL OBLIGATION BONDS | | 2,000,000 | | 2,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 2,000,000 | 0 | | |
|
| | $0 | $2,000,000 | | $2,000,000 | $2,000,000 | $0 | | |
|
| 65 | | TUNICA HILLS S.P.A. - DEVELOPMENT | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 1,765,000 | | 1,765,000 | 0 | 0 | | |
|
| | $0 | $1,765,000 | | $1,765,000 | $0 | $0 | | |
|
| 66 | | LAKE BRUIN SP - LAND ACQUISITION | | | | | | TENSAS | |
|
| GENERAL OBLIGATION BONDS | | 300,000 | | 300,000 | 0 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $0 | $0 | | |
|
| 67 | | FONTAINEBLEAU STATE PARK - ACQUISITION | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 560,000 | | 560,000 | 0 | 0 | | |
|
| | $0 | $560,000 | | $560,000 | $0 | $0 | | |
|
| 68 | | BAYOU SEGNETTE SP - LAND ACQUISITION | | | | | | JEFFERSON | |
|
| GENERAL OBLIGATION BONDS | | 600,000 | | 600,000 | 0 | 0 | | |
|
| | $0 | $600,000 | | $600,000 | $0 | $0 | | |
|
| 69 | | LAKE BISTINEAU SP - LAND ACQUISITION | | | | | | WEBSTER | |
|
| GENERAL OBLIGATION BONDS | | 300,000 | | 300,000 | 0 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $0 | $0 | | |
|
| 70 | | STATE PARKS ROAD OVERLAY - STATEWIDE | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 2,400,000 | 0 | | 2,400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 2,000,000 | 0 | | |
|
| | $2,400,000 | $0 | | $2,400,000 | $2,000,000 | $0 | | |
|
| 71 | | CYPREMORT POINT STATE PARK - BEACH EROSION CONTROLS | | | | | | ST. MARY | |
|
| GENERAL OBLIGATION BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $500,000 | $0 | | $500,000 | $500,000 | $0 | | |
|
| 72 | | LAKE BISTINEAU STATE PARK - CONNECTOR ROAD, CONSTRUCTION | | | | | | WEBSTER | |
|
| GENERAL OBLIGATION BONDS | 1,080,000 | 0 | | 1,080,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 1,080,000 | 0 | | |
|
| | $1,080,000 | $0 | | $1,080,000 | $1,080,000 | $0 | | |
|
| 73 | | SOUTH TOLEDO BEND STATE PARK, CONSTRUCTION | | | | | | SABINE | |
|
| GENERAL OBLIGATION BONDS | 6,664,800 | 0 | | 6,664,800 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 3,590,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $6,664,800 | $0 | | $6,664,800 | $5,090,000 | $0 | | |
|
| 74 | | AUDUBON SCA - VISITOR CENTER, PLANNING AND CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 137,375 | 1,571,180 | | 1,708,555 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 110,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,260,000 | 0 | | |
|
| | $137,375 | $1,571,180 | | $1,708,555 | $1,370,000 | $0 | | |
|
| 75 | | LOUISIANA STATE ARBORETUM - DEVELOPMENT, PLANNING AND CONSTRUCTION | | | | | | EVANGELINE | |
|
| GENERAL OBLIGATION BONDS | 174,162 | 1,935,782 | | 2,109,944 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 175,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,925,000 | 0 | | |
|
| | $174,162 | $1,935,782 | | $2,109,944 | $2,100,000 | $0 | | |
|
| 76 | | COOCHIE BRAKE STATE PRESERVATION AREA, PLANNING AND CONSTRUCTION | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | 207,472 | 2,332,192 | | 2,539,664 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 210,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 2,280,000 | 0 | | |
|
| | $207,472 | $2,332,192 | | $2,539,664 | $2,490,000 | $0 | | |
|
| 77 | | TICKFAW STATE PARK - PARK ACCESS ROAD | | | | | | LIVINGSTON | |
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 0 | | 1,500,000 | 0 | 0 | | |
|
| | $1,500,000 | $0 | | $1,500,000 | $0 | $0 | | |
|
| 78 | | EVERGREEN PLANTATION STATE COMMEMORATIVE AREA | | | | | | ST. JOHN THE BAPTIST | | 5
|
| GENERAL OBLIGATION BONDS | 4,700,000 | 2,300,000 | | 7,000,000 | 0 | 0 | | |
|
| | $4,700,000 | $2,300,000 | | $7,000,000 | $0 | $0 | | |
|
| 79 | | SAM HOUSTON JONES STATE PARK - VACATION CABINS & VISITOR CENTER, PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 413,000 | 4,683,000 | | 5,096,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 380,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 4,300,000 | 0 | | |
|
| | $413,000 | $4,683,000 | | $5,096,000 | $4,680,000 | $0 | | |
|
| 1375 | | TICKFAW STATE PARK DEVELOPMENT, CONSTRUCTION | | | | | | LIVINGSTON | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,410,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,410,000 | $0 | | |
|
| 1376 | | CYPREMORT POINT STATE PARK VACATION CABINS, PLANNING AND CONSTRUCTION | | | | | | ST. MARY | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 575,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 975,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,550,000 | $0 | | |
|
| 1377 | | LAKE CLAIBORNE STATE PARK VACATION CABINS, PLANNING AND CONSTRUCTION | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,295,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,295,000 | $0 | | |
|
| 1378 | | BAYOU SEGNETTE GOLF COURSE, LAND ACQUISITION, PLANNING AND CONSTRUCTION | | | | | | JEFFERSON | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,970,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 4,030,000 | 0 | | |
|
| | $0 | $0 | | $0 | $6,000,000 | $0 | | |
|
| 1379 | | CANEY CREEK LAKE STATE PARK - PHASE 2 DEVELOPMENT - CAMPING, CABINS, GROUP CAMP, DAY USE EXPANSION, PLANNING AND CONSTRUCTION | | | | | | JACKSON | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $5,500,000 | $0 | | |
|
| 1380 | | LAKE BRUIN STATE PARK, NEW CAMPGROUND, GATEHOUSE, AND ROADS, CONSTRUCTION | | | | | | TENSAS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 175,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 875,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,050,000 | $0 | | |
|
| 1381 | | CHEMIN-A-HAUT STATE PARK CABINS, PLANNING AND CONSTRUCTION | | | | | | MOREHOUSE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 230,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,150,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,380,000 | $0 | | |
|
| 1589 | | LAKE D'ARBONNE STATE PARK - PHASE 2 DEVELOPMENT - CABINS, GROUP CAMP, DAY USE, CONSTRUCTION | | | | | | UNION | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,030,000 | 0 | | |
|
| | $0 | $0 | | $0 | $5,030,000 | $0 | | |
|
| 1617 | | POVERTY POINT STATE COMMEMORATIVE AREA ARTIFACT STORAGE FACILITY, PLANNING AND CONSTRUCTION | | | | | | WEST CARROLL | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 180,000 | 0 | | |
|
| | $0 | $0 | | $0 | $180,000 | $0 | | |
|
| 1618 | | PLAQUEMINE LOCKS IMPROVEMENTS, PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 250,000 | 0 | | |
|
| | $0 | $0 | | $0 | $250,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 36 | | | | | | | | |
|
| AGENCY TOTAL | $29,806,870 | $125,293,854 | | $155,100,724 | $70,495,000 | $0 | | |
|
| AGENCY: 265 OFFICE OF CULTURAL DEVELOPMENT | | | | | | | | | |
|
| 627 | | ARCHAEOLOGICAL COLLECTIONS REPOSITORY, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 79,797 | 975,131 | | 1,054,928 | 0 | 0 | | |
|
| | $79,797 | $975,131 | | $1,054,928 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $79,797 | $975,131 | | $1,054,928 | $0 | $0 | | |
|
| AGENCY: 267 OFFICE OF TOURISM | | | | | | | | | |
|
| 1592 | | NEW ORLEANS WELCOME CENTER | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 100,920 | 0 | | 100,920 | 0 | 0 | | |
|
| | $100,920 | $0 | | $100,920 | $0 | $0 | | |
|
| 1619 | | I-49 VISITORS WELCOME CENTER, PLANNING AND CONSTRUCTION | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 850,000 | 0 | | |
|
| | $0 | $0 | | $0 | $850,000 | $0 | | |
|
| 1620 | | VISITOR WELCOME CENTERS, RENOVATIONS AND EXPANSIONS, PLANNING AND CONSTRUCTION | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,665,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,665,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $100,920 | $0 | | $100,920 | $2,515,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 46 | | | | | | | | |
|
| DEPARTMENT TOTAL | $35,939,139 | $138,076,773 | | $174,015,912 | $78,670,000 | $0 | | |
|
| 07 DEPT OF TRANSPORTATION & DEVEL | | | | | | | | | |
|
| AGENCY: 270 DEPT TRANSPTN & DEVELOP-ADMN | | | | | | | | | |
|
| 127 | | MCDADE STREET ( ARTHUR RAY TEAGUE CONN.) (LA 3105) CONSTRUCTION, RIGHT OF WAY AND UTILITIES (BOSSIER) | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 0 | | 1,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $1,500,000 | $0 | | $1,500,000 | $1,500,000 | $0 | | |
|
| 128 | | CHALMETTE - MRGO BRIDGE ( PARIS ROAD) RECONSTRUCTION (LA 47) CONSTRUCTION, RIGHT OF WAY AND UTILITIES (ORLEANS AND ST. BERNARD) | | | | | | ST. BERNARD | |
|
| NRP BONDS | 450,000 | 0 | | 450,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 7,200,000 | 0 | | 7,200,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 5,200,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 2,000,000 | 0 | | |
|
| NRP BONDS | | 0 | | 0 | 450,000 | 0 | | |
|
| | $7,650,000 | $0 | | $7,650,000 | $7,650,000 | $0 | | |
|
| 129 | | COMMON STREET ( TANK FARM ROAD - PETRO PT.) CONSTRUCTION, RIGHT OF WAY AND UTILITIES (CALCASIEU) | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 13,500,000 | 0 | | 13,500,000 | 0 | 0 | | |
|
| | $13,500,000 | $0 | | $13,500,000 | $0 | $0 | | |
|
| 130 | | LA HIGHWAY 93 IN GRAND COUTEAU FROM I-49 TO JCT. LA HWY. 760-2 (1.95 MI.) CONSTRUCTION, RIGHT OF WAY, AND UTILITIES (ST. LANDRY) | | | | | | ST. LANDRY | |
|
| NRP BONDS | 315,017 | 0 | | 315,017 | 0 | 0 | | |
|
| NRP BONDS | | 0 | | 0 | 351,017 | 0 | | |
|
| | $315,017 | $0 | | $315,017 | $351,017 | $0 | | |
|
| 131 | | NELSON ROAD ( I-210 - COUNTRY CLUB DR.) (LA 1138-2) CONSTRUCTION, RIGHT OF WAY AND UTILITIES (CALCASIEU) | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 12,000,000 | 0 | | 12,000,000 | 0 | 0 | | |
|
| | $12,000,000 | $0 | | $12,000,000 | $0 | $0 | | |
|
| 132 | | CALCASIEU PASS BRIDGE ( MONKEY ISLAND) NEW BRIDGE (LA 1141) CONSTRUCTION, RIGHT OF WAY AND UTILITIES (CAMERON) | | | | | | CAMERON | |
|
| GENERAL OBLIGATION BONDS | 300,000 | 0 | | 300,000 | 0 | 0 | | |
|
| | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| 133 | | LA 82 RECONSTRUCTION ( LA 82) EMERGENCY RECONSTRUCTION - CONSTRUCTION, RIGHT OF WAY AND UTILITIES (CAMERON) | | | | | | CAMERON | |
|
| NRP BONDS | 831,305 | 0 | | 831,305 | 0 | 0 | | |
|
| NRP BONDS | | 0 | | 0 | 831,305 | 0 | | |
|
| | $831,305 | $0 | | $831,305 | $831,305 | $0 | | |
|
| 134 | | ICWW BRIDGE ( HOUMA TUNNEL) ( LA 3040) NEW 2-LANE BRIDGE CONSTRUCTION, RIGHT OF WAY, AND UTILITIES (TERREBONNE) | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 300,000 | 0 | | 300,000 | 0 | 0 | | |
|
| | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| 135 | | JCT. LA 3127 - GRAMERCY BRIDGE WEST APPROACH (LA 3213) (PHASE 2) CONSTRUCTION, RIGHT OF WAY, UTILITIES (ST. JOHN) | | | | | | ST. JOHN THE BAPTIST | |
|
| GENERAL OBLIGATION BONDS | 15,350,000 | 0 | | 15,350,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 350,000 | 0 | | |
|
| | $15,350,000 | $0 | | $15,350,000 | $350,000 | $0 | | |
|
| 136 | | LA HIGHWAY 1 EMBANKMENT STABLIZATION & ENHANCEMENTS - SOUTH OF GOLDEN MEADOW, CONST., R/W & UTIL. (LAFOURCHE & JEFFERSON) | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 3,500,000 | 0 | | 3,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,900,000 | 0 | | |
|
| | $3,500,000 | $0 | | $3,500,000 | $1,900,000 | $0 | | |
|
| 137 | | LA HIGHWAY 1 & 308 EMBANKMENT STABILIZATION, LOCKPORT TO GOLDEN MEADOW, CONSTRUCTION, RIGHT-OF-WAY AND UTILITIES (LAFOURCHE) | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 1,600,000 | 0 | | 1,600,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,095,000 | 0 | | |
|
| | $1,600,000 | $0 | | $1,600,000 | $2,095,000 | $0 | | |
|
| 138 | | ROBINSON BRIDGE ROAD, RECONSTRUCTION (LA 3265) (RAPIDES) | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 3,700,000 | 0 | | 3,700,000 | 0 | 0 | | |
|
| | $3,700,000 | $0 | | $3,700,000 | $0 | $0 | | |
|
| 1368 | | HIGHWAY PROGRAM (OVERLAY PORTION INCLUDES AT LEAST $90,000,000 FROM TTF AND FEDERAL FUNDS) (UP TO $4,000,000 FOR SECRETARY'S EMERG. FUND) | | | | | | STATEWIDE | |
|
| TRANSPORTATION TRUST FUND - FEDERAL RECEIPTS | | 0 | | 0 | 252,000,000 | 1,008,000,000 | | |
|
| TRANSPORTATION TRUST FUND - FEDERAL RECEIPTS | 252,000,000 | 1,008,000,000 | | 1,260,000,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 132,100,000 | 528,400,000 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | 139,250,000 | 557,000,000 | | 696,250,000 | 0 | 0 | | |
|
| | $391,250,000 | $1,565,000,000 | | $1,956,250,000 | $384,100,000 | $1,536,400,000 | | |
|
| 1369 | | SECRETARY'S EMERGENCY FUND FOR BRIDGE DAMAGES AND OTHER REIMBURSEMENT (SUBJECT TO THE PROVISIONS OF R.S. 48:232) | | | | | | STATEWIDE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 9,000,000 | 36,000,000 | | |
|
| FEES AND SELF GENERATED REVENUES | 9,000,000 | 36,000,000 | | 45,000,000 | 0 | 0 | | |
|
| | $9,000,000 | $36,000,000 | | $45,000,000 | $9,000,000 | $36,000,000 | | |
|
| 1370 | | CONTRACT MAINTENANCE | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | 14,400,000 | 57,600,000 | | 72,000,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 13,400,000 | 53,600,000 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | 13,600,000 | 54,400,000 | | 68,000,000 | 0 | 0 | | |
|
| | $28,000,000 | $112,000,000 | | $140,000,000 | $13,400,000 | $53,600,000 | | |
|
| 1371 | | TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT | | | | | | STATEWIDE | |
|
| TRANSPORTATION TRUST FUND - TIME RECEIPTS | | 0 | | 0 | 67,285,000 | 0 | | |
|
| TRANSPORTATION TRUST FUND - TIME RECEIPTS | 67,285,000 | 0 | | 67,285,000 | 0 | 0 | | |
|
| | $67,285,000 | $0 | | $67,285,000 | $67,285,000 | $0 | | |
|
| 1605 | | U. S. 90 UPGRADE, INTERSECTION/INTERCHANGE IMPROV. | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 10,000,000 | 40,000,000 | | 50,000,000 | 0 | 0 | | |
|
| | $10,000,000 | $40,000,000 | | $50,000,000 | $0 | $0 | | |
|
| 1621 | | I-49 AT CADDO PARISH, PORT ROAD (I-49) CONSTRUCTION, RIGHT OF WAY AND UTILITIES CADDO PARISH | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 350,000 | 0 | | |
|
| | $0 | $0 | | $0 | $350,000 | $0 | | |
|
| 1622 | | LA 39 BRIDGES (JUDGE PEREZ) ELIMINATION OF CHANNEL RESTRICTION, CONSTRUCTION, RIGHT OF WAY AND UTILITIES ST. BERNARD | | | | | | ST. BERNARD | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 800,000 | 0 | | |
|
| | $0 | $0 | | $0 | $800,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 19 | | | | | | | | |
|
| AGENCY TOTAL | $566,081,322 | $1,753,000,000 | | $2,319,081,322 | $489,612,322 | $1,626,000,000 | | |
|
| AGENCY: 274 PUBLIC IMPROVEMENTS | | | | | | | | | |
|
| 92 | | GRAND BAYOU RESERVOIR (RED RIVER PARISH) | | | | | | RED RIVER | |
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 0 | | 2,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,000,000 | 0 | | |
|
| | $2,000,000 | $0 | | $2,000,000 | $2,000,000 | $0 | | |
|
| 93 | | PORT CONSTRUCTION AND DEVELOPMENT PRIORITY PROGRAM (STATEWIDE) [PROVIDED, HOWEVER THAT UNSPENT PRIOR YEARS FUNDING FOR THIS PROGRAM SHALL BE ELIGIBLE TO FUND 1998-99 PROJECTS] | | | | | | STATEWIDE | |
|
| STATUTORY DEDICATIONS | 100,000 | 98,000,000 | | 98,100,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 10,000,000 | 60,000,000 | | |
|
| OTHER AND LOCAL FUNDS | | 0 | | 0 | 0 | 20,000,000 | | |
|
| OTHER AND LOCAL FUNDS | | 20,000,000 | | 20,000,000 | 0 | 0 | | |
|
| | $100,000 | $118,000,000 | | $118,100,000 | $10,000,000 | $80,000,000 | | |
|
| 94 | | STATEWIDE FLOOD CONTROL PROGRAM, [PROVIDED, HOWEVER THAT UNSPENT PRIOR YEARS FUNDING FOR THIS PROGRAM SHALL BE ELIGIBLE TO FUND 1998-99 PROJECTS] | | | | | | STATEWIDE | |
|
| STATUTORY DEDICATIONS | | 80,000,000 | | 80,000,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 100,000 | 40,000,000 | | |
|
| OTHER AND LOCAL FUNDS | | 0 | | 0 | 0 | 42,856,000 | | |
|
| OTHER AND LOCAL FUNDS | | 42,856,000 | | 42,856,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 5,000,000 | 0 | | 5,000,000 | 0 | 0 | | |
|
| | $5,000,000 | $122,856,000 | | $127,856,000 | $100,000 | $82,856,000 | | |
|
| 95 | | MORGANZA TO THE GULF OF MEXICO (MULTI-PARISH) | | | | | | STATEWIDE | |
|
| FEDERAL FUNDS | 1,070,000 | 615,000 | | 1,685,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 900,000 | 0 | | 900,000 | 0 | 0 | | |
|
| | $1,970,000 | $615,000 | | $2,585,000 | $0 | $0 | | |
|
| 96 | | MISSISSIPPI RIVER LEVEE RAISING, ARKANSAS TO OLD RIVER (MULTI-PARISH) | | | | | | STATEWIDE | |
|
| FEDERAL FUNDS | 173,440,000 | 42,517,000 | | 215,957,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,165,000 | 2,860,000 | | 4,025,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,000,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,025,000 | 0 | | |
|
| | $174,605,000 | $45,377,000 | | $219,982,000 | $4,025,000 | $0 | | |
|
| 97 | | MISSISSIPPI RIVER SHIP CHANNEL DEEPENING, GULF TO BATON ROUGE (MULTI-PARISH) | | | | | | STATEWIDE | |
|
| FEDERAL FUNDS | 3,030,000 | 0 | | 3,030,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 0 | | 1,000,000 | 0 | 0 | | |
|
| | $4,030,000 | $0 | | $4,030,000 | $0 | $0 | | |
|
| 98 | | LAFAYETTE PARISH/ VERMILION RIVER FLOOD STUDY & CONSTRUCTION (LAFAYETTE & ST. MARTIN PARISHES) | | | | | | MULTIPLE | |
|
| FEDERAL FUNDS | 550,000 | 485,000 | | 1,035,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 670,000 | | 1,670,000 | 0 | 0 | | |
|
| | $1,550,000 | $1,155,000 | | $2,705,000 | $0 | $0 | | |
|
| 99 | | WEST BANK HURRICANE PROTECTION PROJECT(JEFFERSON, ORLEANS & PLAQUEMINES PARISHES) | | | | | | MULTIPLE | |
|
| FEDERAL FUNDS | 8,700,000 | 125,940,000 | | 134,640,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 11,835,000 | 36,775,000 | | 48,610,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $20,535,000 | $162,715,000 | | $183,250,000 | $500,000 | $0 | | |
|
| 100 | | AMITE RIVER & TRIBUTARIES FLOOD STUDY (MULTI-PARISH) | | | | | | STATEWIDE | |
|
| FEDERAL FUNDS | 300,000 | 1,800,000 | | 2,100,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 300,000 | 1,800,000 | | 2,100,000 | 0 | 0 | | |
|
| | $600,000 | $3,600,000 | | $4,200,000 | $0 | $0 | | |
|
| 101 | | GRAND ISLE BEACH NOURISHMENT (JEFFERSON PARISH) | | | | | | JEFFERSON | |
|
| GENERAL OBLIGATION BONDS | 3,000,000 | 0 | | 3,000,000 | 0 | 0 | | |
|
| | $3,000,000 | $0 | | $3,000,000 | $0 | $0 | | |
|
| 102 | | CANEY LAKE PARK ACCESS ROAD (JACKSON PARISH) | | | | | | JACKSON | |
|
| GENERAL OBLIGATION BONDS | 750,000 | 3,250,000 | | 4,000,000 | 0 | 0 | | |
|
| | $750,000 | $3,250,000 | | $4,000,000 | $0 | $0 | | |
|
| 103 | | POVERTY POINT RESERVOIR, LAND ACQUISITION, PLANNING, EQUIPMENT, RIGHT OF WAY, UTILITIES AND CONSTRUCTION (RICHLAND PARISH) | | | | | | RICHLAND | |
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 0 | | 1,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $1,500,000 | $0 | | $1,500,000 | $1,500,000 | $0 | | |
|
| 104 | | LAKE D'ARBONNE SPILLWAY PLANNING AND CONSTRUCTION (UNION PARISH) | | | | | | UNION | |
|
| GENERAL OBLIGATION BONDS | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 100,000 | 0 | | |
|
| | $400,000 | $0 | | $400,000 | $100,000 | $0 | | |
|
| 105 | | TURKEY CREEK SPILLWAY RECONSTRUCTION (FRANKLIN PARISH) | | | | | | FRANKLIN | |
|
| GENERAL OBLIGATION BONDS | 500,000 | 5,500,000 | | 6,000,000 | 0 | 0 | | |
|
| | $500,000 | $5,500,000 | | $6,000,000 | $0 | $0 | | |
|
| 106 | | RESERVOIR EMBANKMENT/ STRUCTURES REHABILITATION (STATEWIDE) | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 4,000,000 | | 5,000,000 | 0 | 0 | | |
|
| | $1,000,000 | $4,000,000 | | $5,000,000 | $0 | $0 | | |
|
| 107 | | BUNDICKS LAKE LEVEL CONTROL STRUCTURE (BEAUREGARD PARISH) | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | | 9,400,000 | | 9,400,000 | 0 | 0 | | |
|
| | $0 | $9,400,000 | | $9,400,000 | $0 | $0 | | |
|
| 108 | | LAKE BISTINEAU- STUMPY LAKE PRESERVATION (MULTI-PARISH) | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 5,000,000 | 5,000,000 | | 10,000,000 | 0 | 0 | | |
|
| | $5,000,000 | $5,000,000 | | $10,000,000 | $0 | $0 | | |
|
| 1623 | | LOWER ATCHAFALAYA INTERIM FLOOD PROTECTION STUDY | | | | | | ST. MARY | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 18 | | | | | | | | |
|
| AGENCY TOTAL | $222,540,000 | $481,468,000 | | $704,008,000 | $18,725,000 | $162,856,000 | | |
|
| AGENCY: 276 OFFICE OF ENGINEERING | | | | | | | | | |
|
| 80 | | DOTD DISTRICT 08 HEADQUARTERS LAND ACQUISITION (RAPIDES PARISH) | | | | | | RAPIDES | |
|
| STATUTORY DEDICATIONS | | 840,000 | | 840,000 | 0 | 0 | | |
|
| | $0 | $840,000 | | $840,000 | $0 | $0 | | |
|
| 81 | | CONSTRUCT LTRC PAVEMENT RESEARCH BUILDING AT ALF SITE (WEST BATON ROUGE PARISH) | | | | | | WEST BATON ROUGE | |
|
| STATUTORY DEDICATIONS | | 228,000 | | 228,000 | 0 | 0 | | |
|
| | $0 | $228,000 | | $228,000 | $0 | $0 | | |
|
| 82 | | CONSTRUCT NEW TRAFFIC SERVICES WAREHOUSING FACILITIES (EAST BATON ROUGE PARISH) | | | | | | EAST BATON ROUGE | |
|
| STATUTORY DEDICATIONS | | 406,000 | | 406,000 | 0 | 0 | | |
|
| | $0 | $406,000 | | $406,000 | $0 | $0 | | |
|
| 83 | | EQUIPMENT REHABILITATION FOR FERRY BOATS AT CCCD (ORLEANS, JEFFERSON & ST. BERNARD PARISHES) | | | | | | MULTIPLE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 582,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 582,000 | 0 | | 582,000 | 0 | 0 | | |
|
| | $582,000 | $0 | | $582,000 | $582,000 | $0 | | |
|
| 84 | | FERRY DRYDOCKING AND REPAIRS FOR CCCD FERRIES (ORLEANS, JEFFERSON & ST. BERNARD PARISHES) | | | | | | MULTIPLE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 1,800,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 1,800,000 | 0 | | 1,800,000 | 0 | 0 | | |
|
| | $1,800,000 | $0 | | $1,800,000 | $1,800,000 | $0 | | |
|
| 85 | | RENEWING PAINTING PROTECTION, US 90 B STRUCTURES, CRESCENT CITY CONNECTION BRIDGE NO.1, CLAIBORNE AVENUE INTERCHANGE, AND HARVEY CANAL BRIDGE (ORLEANS & JEFFERSON PARISHES) | | | | | | MULTIPLE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 6,720,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 6,720,000 | 21,600,000 | | 28,320,000 | 0 | 0 | | |
|
| | $6,720,000 | $21,600,000 | | $28,320,000 | $6,720,000 | $0 | | |
|
| 86 | | RELOCATE ST. MARTIN PARISH MAINT. UNIT (ST. MARTIN PARISH) | | | | | | ST. MARTIN | |
|
| STATUTORY DEDICATIONS | 485,000 | 0 | | 485,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 485,000 | 0 | | |
|
| | $485,000 | $0 | | $485,000 | $485,000 | $0 | | |
|
| 87 | | CONSTRUCT NEW LAFAYETTE PARISH PROJECT ENGINEERS OFFICE (LAFAYETTE PARISH) | | | | | | LAFAYETTE | |
|
| STATUTORY DEDICATIONS | | 396,000 | | 396,000 | 0 | 0 | | |
|
| | $0 | $396,000 | | $396,000 | $0 | $0 | | |
|
| 88 | | CONSTRUCT NEW LAFAYETTE PARISH MAINT. OPERATIONS BUILDING (LAFAYETTE PARISH) | | | | | | LAFAYETTE | |
|
| STATUTORY DEDICATIONS | | 297,000 | | 297,000 | 0 | 0 | | |
|
| | $0 | $297,000 | | $297,000 | $0 | $0 | | |
|
| 89 | | CONSTRUCT NEW DOTD DISTRICT 04 HEADQUARTERS ADMINISTRATION BUILDING (BOSSIER PARISH) | | | | | | BOSSIER | |
|
| STATUTORY DEDICATIONS | 2,130,000 | 0 | | 2,130,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 2,130,000 | 0 | | |
|
| | $2,130,000 | $0 | | $2,130,000 | $2,130,000 | $0 | | |
|
| 90 | | RELOCATE MADISON PARISH UNIT (MADISON PARISH) | | | | | | MADISON | |
|
| STATUTORY DEDICATIONS | | 720,000 | | 720,000 | 0 | 0 | | |
|
| | $0 | $720,000 | | $720,000 | $0 | $0 | | |
|
| 91 | | CONSTRUCT NEW DISTRICT 05 PAINT AND BODY SHOP (OUACHITA PARISH) | | | | | | OUACHITA | | 8
|
| STATUTORY DEDICATIONS | 110,000 | 0 | | 110,000 | 0 | 0 | | |
|
| | $110,000 | $0 | | $110,000 | $0 | $0 | | |
|
| 109 | | RELOCATE FARMERVILLE MAINTENANCE UNIT (UNION PARISH) | | | | | | UNION | | 8
|
| STATUTORY DEDICATIONS | 605,000 | 0 | | 605,000 | 0 | 0 | | |
|
| | $605,000 | $0 | | $605,000 | $0 | $0 | | |
|
| 110 | | CONSTRUCT NEW CATAHOULA PARISH MAINTENANCE UNIT (CATAHOULA PARISH) | | | | | | CATAHOULA | |
|
| STATUTORY DEDICATIONS | 390,000 | 0 | | 390,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 390,000 | 0 | | |
|
| | $390,000 | $0 | | $390,000 | $390,000 | $0 | | |
|
| 111 | | REHABILITATION OF THE GRETNA / JACKSON AVENUE FERRY FACILITIES (ORLEANS & JEFFERSON PARISHES) | | | | | | MULTIPLE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 180,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 180,000 | 0 | | 180,000 | 0 | 0 | | |
|
| | $180,000 | $0 | | $180,000 | $180,000 | $0 | | |
|
| 112 | | CONSTRUCT DOTD DISTRICT 02 TRAINING BUILDING (JEFFERSON PARISH) | | | | | | JEFFERSON | |
|
| STATUTORY DEDICATIONS | | 330,000 | | 330,000 | 0 | 0 | | |
|
| | $0 | $330,000 | | $330,000 | $0 | $0 | | |
|
| 113 | | UPGRADE HVAC SYSTEM, INSTALLATION OF THIRD CENTRIFUGAL CHILLER AT DOTD HQ | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 375,000 | 0 | | 375,000 | 0 | 0 | | |
|
| | $375,000 | $0 | | $375,000 | $0 | $0 | | |
|
| 114 | | DISTRICT 07 HEADQUARTERS ADMINISTRATION, ENGINEER, LAB, ACCESS ROAD, PARKING LOT AND MATERIALS STORAGE YARD RECONSTRUCTION (CALCASIEU PARISH) | | | | | | CALCASIEU | | 5
|
| STATUTORY DEDICATIONS | | 510,000 | | 510,000 | 0 | 0 | | |
|
| | $0 | $510,000 | | $510,000 | $0 | $0 | | |
|
| 115 | | CONSTRUCT STORAGE WAREHOUSE FOR DOTD HQ COMPLEX (EAST BATON ROUGE PARISH) | | | | | | EAST BATON ROUGE | |
|
| STATUTORY DEDICATIONS | | 165,000 | | 165,000 | 0 | 0 | | |
|
| | $0 | $165,000 | | $165,000 | $0 | $0 | | |
|
| 116 | | MOTOR VESSEL AND EQUIPMENT DRYDOCKING/ REPAIRS, VARIOUS LOCATIONS (STATEWIDE) | | | | | | STATEWIDE | | 8
|
| STATUTORY DEDICATIONS | 650,000 | 3,600,000 | | 4,250,000 | 0 | 0 | | |
|
| | $650,000 | $3,600,000 | | $4,250,000 | $0 | $0 | | |
|
| 117 | | CONSTRUCT NEW DISTRICT 62 PROJECT ENGINEER & REAL ESTATE OFFICE TANGIPAHOA PARISH) | | | | | | TANGIPAHOA | | 5
|
| STATUTORY DEDICATIONS | | 255,000 | | 255,000 | 0 | 0 | | |
|
| | $0 | $255,000 | | $255,000 | $0 | $0 | | |
|
| 118 | | RELOCATION OF ST. TAMMANY PARISH MAINTENANCE UNIT (ST. TAMMANY PARISH) | | | | | | ST. TAMMANY | | 8
|
| STATUTORY DEDICATIONS | 550,000 | 0 | | 550,000 | 0 | 0 | | |
|
| | $550,000 | $0 | | $550,000 | $0 | $0 | | |
|
| 119 | | RELOCATION OF ST. HELENA PARISH MAINTENANCE UNIT (ST. HELENA PARISH) | | | | | | ST. HELENA | | 8
|
| STATUTORY DEDICATIONS | 475,000 | 0 | | 475,000 | 0 | 0 | | |
|
| | $475,000 | $0 | | $475,000 | $0 | $0 | | |
|
| 120 | | CONSTRUCT NEW LIVINGSTON MAINTENANCE UNIT (LIVINGSTON PARISH) | | | | | | LIVINGSTON | |
|
| STATUTORY DEDICATIONS | | 470,000 | | 470,000 | 0 | 0 | | |
|
| | $0 | $470,000 | | $470,000 | $0 | $0 | | |
|
| 121 | | REMOVAL & DISPOSAL OF ASPHALTIC STORAGE TANKS AT VARIOUS DOTD LOCATIONS (STATEWIDE) | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 405,000 | 405,000 | | 810,000 | 0 | 0 | | |
|
| | $405,000 | $405,000 | | $810,000 | $0 | $0 | | |
|
| 122 | | FCC MANDATED UPGRADE OF DOTD MICROWAVE SYSTEM ( STATEWIDE) | | | | | | STATEWIDE | |
|
| SCENIC RIVERS FUND | 435,000 | 2,565,000 | | 3,000,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 435,000 | 0 | | |
|
| | $435,000 | $2,565,000 | | $3,000,000 | $435,000 | $0 | | |
|
| 123 | | CONSTRUCT LTRC TRANSPORTATION TRAINING & EDUCATION FACILITY (EAST BATON ROUGE PARISH) | | | | | | EAST BATON ROUGE | |
|
| STATUTORY DEDICATIONS | | 600,000 | | 600,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 180,000 | 0 | | |
|
| OTHER AND LOCAL FUNDS | | 1,200,000 | | 1,200,000 | 0 | 0 | | |
|
| | $0 | $1,800,000 | | $1,800,000 | $180,000 | $0 | | |
|
| 124 | | MAJOR REPAIRS/ RENOVATIONS (STATEWIDE) | | | | | | STATEWIDE | |
|
| STATUTORY DEDICATIONS | 1,335,000 | 0 | | 1,335,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 1,335,000 | 0 | | |
|
| | $1,335,000 | $0 | | $1,335,000 | $1,335,000 | $0 | | |
|
| 125 | | PURCHASE LAND FOR GUY WIRE ANCHOR AT RAYVILLE MICROWAVE TOWER LOCATION (RICHLAND PARISH) | | | | | | RICHLAND | |
|
| STATUTORY DEDICATIONS | 4,500 | 0 | | 4,500 | 0 | 0 | | |
|
| | $4,500 | $0 | | $4,500 | $0 | $0 | | |
|
| 126 | | PURCHASE OF SITES AND/OR BUILDINGS, IMPROVEMENTS AND/OR CONSTRUCTION OF NEW FACILITY/FACILITIES FOR DOTD MAINTENANCE AND CONSTRUCTION UNITS IN TERREBONNE AND/OR LAFOURCHE (TERREBONNE AN | | | | | | LAFOURCHE | |
|
| NRP BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,750,000 | 0 | | 2,750,000 | 0 | 0 | | |
|
| | $3,250,000 | $0 | | $3,250,000 | $0 | $0 | | |
|
| 1624 | | CONSTRUCT NEW DISTRICT HEADQUARTERS AT HOUMA | | | | | | TERREBONE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 31 | | | | | | | | |
|
| AGENCY TOTAL | $20,481,500 | $34,587,000 | | $55,068,500 | $14,737,000 | $0 | | |
|
| AGENCY: 277 AVIATION IMPROVEMENTS | | | | | | | | | |
|
| 1372 | | STATE AVIATION AND AIRPORT IMPROVEMENT PROGRAM | | | | | | STATEWIDE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 5,000,000 | 20,000,000 | | |
|
| FEES AND SELF GENERATED REVENUES | 5,000,000 | 20,000,000 | | 25,000,000 | 0 | 0 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | | 0 | | 0 | 4,100,000 | 16,400,000 | | |
|
| TRANSPORTATION TRUST FUND - REGULAR | 4,100,000 | 16,400,000 | | 20,500,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,000,000 | 4,000,000 | | |
|
| FEDERAL FUNDS | 1,000,000 | 4,000,000 | | 5,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $10,100,000 | $40,400,000 | | $50,500,000 | $10,600,000 | $40,400,000 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $10,100,000 | $40,400,000 | | $50,500,000 | $10,600,000 | $40,400,000 | | |
|
| AGENCY: 813 SABINE RIVER AUTHORITY | | | | | | | | | |
|
| 139 | | CONFERENCE CENTER AND CONTINUING EDUCATION COMPLEX AND ANCILLARY FACILITIES CYPRESS BEND RESORT | | | | | | SABINE | |
|
| FEDERAL FUNDS | 625,000 | 0 | | 625,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 3,125,000 | 0 | | 3,125,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 1,500,000 | | 3,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $5,750,000 | $1,500,000 | | $7,250,000 | $1,500,000 | $0 | | |
|
| 140 | | BROOD STOCK FISH HATCHERY PLANNING AND CONSTRUCTION SABINE RIVER AUTHORITY | | | | | | SABINE | |
|
| FEDERAL FUNDS | | 3,300,000 | | 3,300,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 200,000 | 4,100,000 | | 4,300,000 | 0 | 0 | | |
|
| | $200,000 | $7,400,000 | | $7,600,000 | $0 | $0 | | |
|
| 141 | | PLANNING FOR RESORT AT TOLEDO BEND DAM SABINE RIVER AUTHORITY | | | | | | SABINE | |
|
| GENERAL OBLIGATION BONDS | 175,000 | 0 | | 175,000 | 0 | 0 | | |
|
| | $175,000 | $0 | | $175,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $6,125,000 | $8,900,000 | | $15,025,000 | $1,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 72 | | | | | | | | |
|
| DEPARTMENT TOTAL | $825,327,822 | $2,318,355,000 | | $3,143,682,822 | $535,174,322 | $1,829,256,000 | | |
|
| 08 DEPT OF PUB SAFETY AND CORRECT | | | | | | | | | |
|
| AGENCY: 400 CORRECTIONS-ADMINISTRATION | | | | | | | | | |
|
| 174 | | HANDICAPPED ACCESSIBILITY RENOVATIONS | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $0 | $0 | | |
|
| 191 | | ELECTRICAL DISTRIBUTION UPGRADE - HEADQUARTERS COMPLEX | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 336,000 | 0 | | 336,000 | 0 | 0 | | |
|
| | $336,000 | $0 | | $336,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $936,000 | $0 | | $936,000 | $0 | $0 | | |
|
| AGENCY: 401 C.PAUL PHELPS CORRECTIONAL CTR | | | | | | | | | |
|
| 175 | | 150 BED DORMITORY AND 104 BED CELLBLOCK EXPANSION, PLANNING AND CONSTRUCTION | | | | | | BEAUREGARD | |
|
| FEDERAL FUNDS | 531,800 | 0 | | 531,800 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 4,786,200 | 0 | | 4,786,200 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 290,000 | 0 | | |
|
| | $5,318,000 | $0 | | $5,318,000 | $290,000 | $0 | | |
|
| 176 | | RENOVATE DINING HALL TO GARMENT FACTORY | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $0 | $0 | | |
|
| 177 | | MEDIUM SECURITY PRISON AND SUPPORT BUILDINGS | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | | 23,295,169 | | 23,295,169 | 0 | 0 | | |
|
| | $0 | $23,295,169 | | $23,295,169 | $0 | $0 | | |
|
| 178 | | RESURFACE INSTITUTION ROADS | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | | 510,000 | | 510,000 | 0 | 0 | | |
|
| | $0 | $510,000 | | $510,000 | $0 | $0 | | |
|
| 179 | | REPLACE WINDOWS IN FOURTEEN (14) BUILDINGS | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $0 | $0 | | |
|
| 180 | | RENOVATE P B X ROOM AND CONTROL CENTER | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | | 300,000 | | 300,000 | 0 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $0 | $0 | | |
|
| 181 | | CONSTRUCT GUARD TOWERS (7) | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS | | 840,000 | | 840,000 | 0 | 0 | | |
|
| | $0 | $840,000 | | $840,000 | $0 | $0 | | |
|
| 1626 | | WASTE WATER SYSTEM AND LIFT STATION CONSTRUCTION | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 685,000 | 0 | | |
|
| | $0 | $0 | | $0 | $685,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $6,518,000 | $24,945,169 | | $31,463,169 | $975,000 | $0 | | |
|
| AGENCY: 402 LA STATE PENITENTIARY | | | | | | | | | |
|
| 150 | | OXIDATION POND IMPROVEMENTS AND NEW TREATMENT PLANT | | | | | | WEST FELICIANA | | 5
|
| GENERAL OBLIGATION BONDS | 3,168,000 | 0 | | 3,168,000 | 0 | 0 | | |
|
| | $3,168,000 | $0 | | $3,168,000 | $0 | $0 | | |
|
| 152 | | REPLACEMENT OF RAZOR RIBBON AT CAMPS C, D AND J; ADD DOUBLE FENCE AND LIGHTS AT CAMPS C, D AND J | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 1,080,000 | 0 | | 1,080,000 | 0 | 0 | | |
|
| | $1,080,000 | $0 | | $1,080,000 | $0 | $0 | | |
|
| 154 | | REPLACEMENT OF FRONT GATE, VISITING CENTER, ARMORY AND CONTROL CENTER | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 2,281,994 | 0 | | 2,281,994 | 0 | 0 | | |
|
| | $2,281,994 | $0 | | $2,281,994 | $0 | $0 | | |
|
| 160 | | FIRE MARSHAL / HEALTH DEPARTMENT VIOLATIONS PHASE II (CONSTRUCTION) | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 3,906,000 | 0 | | 3,906,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,560,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 3,570,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,000,000 | 0 | | |
|
| | $3,906,000 | $0 | | $3,906,000 | $13,130,000 | $0 | | |
|
| 161 | | ANGOLA LEVEE PRISON SYSTEM IMPROVEMENTS, PLANNING AND CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| FEDERAL FUNDS | 26,300,000 | 0 | | 26,300,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 8,000,000 | 0 | | 8,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 800,000 | 0 | | |
|
| | $34,300,000 | $0 | | $34,300,000 | $800,000 | $0 | | |
|
| 162 | | ELECTRICAL DISTRIBUTION SYSTEM UPGRADE - CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 2,500,000 | 0 | | 2,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,375,000 | 0 | | |
|
| | $2,500,000 | $0 | | $2,500,000 | $1,375,000 | $0 | | |
|
| 163 | | NEW MAINTENANCE FACILITY | | | | | | WEST FELICIANA | | 5
|
| GENERAL OBLIGATION BONDS | | 1,281,000 | | 1,281,000 | 0 | 0 | | |
|
| | $0 | $1,281,000 | | $1,281,000 | $0 | $0 | | |
|
| 164 | | NEW GYMNASIUMS FOR CAMP C AND CAMP D | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 1,623,154 | | 1,623,154 | 0 | 0 | | |
|
| | $0 | $1,623,154 | | $1,623,154 | $0 | $0 | | |
|
| 165 | | ADDITIONAL SECURITY TOWER AT MAIN PRISON AND 180 MAN CELLBLOCK | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 99,900 | | 99,900 | 0 | 0 | | |
|
| | $0 | $99,900 | | $99,900 | $0 | $0 | | |
|
| 166 | | HOSPITAL FENCING, RAZOR WIRE AND TOWER REPLACEMENT (CONSTRUCTION ONLY) | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 424,538 | | 424,538 | 0 | 0 | | |
|
| | $0 | $424,538 | | $424,538 | $0 | $0 | | |
|
| 167 | | DOUBLE FENCING AROUND RODEO GROUNDS | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 168,600 | | 168,600 | 0 | 0 | | |
|
| | $0 | $168,600 | | $168,600 | $0 | $0 | | |
|
| 168 | | CELLBLOCK SURVEILLANCE CAMERA | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 2,180,209 | 0 | | 2,180,209 | 0 | 0 | | |
|
| | $2,180,209 | $0 | | $2,180,209 | $0 | $0 | | |
|
| 169 | | TRAINING ACADEMY KITCHEN ADDITION | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 1,521,980 | | 1,521,980 | 0 | 0 | | |
|
| | $0 | $1,521,980 | | $1,521,980 | $0 | $0 | | |
|
| 170 | | MULTI PURPOSE BUILDINGS AT CAMP C, CAMP D, AND MAIN PRISON | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 1,860,968 | 0 | | 1,860,968 | 0 | 0 | | |
|
| | $1,860,968 | $0 | | $1,860,968 | $0 | $0 | | |
|
| 171 | | ROAD OVERLAY | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 227,915 | 2,507,065 | | 2,734,980 | 0 | 0 | | |
|
| | $227,915 | $2,507,065 | | $2,734,980 | $0 | $0 | | |
|
| 172 | | NEW CENTRAL WAREHOUSE | | | | | | WEST FELICIANA | | 5
|
| GENERAL OBLIGATION BONDS | 10,968,960 | 0 | | 10,968,960 | 0 | 0 | | |
|
| | $10,968,960 | $0 | | $10,968,960 | $0 | $0 | | |
|
| 1628 | | EDUCATION BUILDING REPLACEMENT AT MAIN PRISON, CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,545,000 | 0 | | |
|
| | $0 | $0 | | $0 | $3,545,000 | $0 | | |
|
| 1629 | | ICE HOUSE RENOVATIONS, CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 265,000 | 0 | | |
|
| | $0 | $0 | | $0 | $265,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 18 | | | | | | | | |
|
| AGENCY TOTAL | $62,474,046 | $7,626,237 | | $70,100,283 | $19,115,000 | $0 | | |
|
| AGENCY: 403 LTI - BATON ROUGE | | | | | | | | | |
|
| 173 | | OXIDATION POND UPGRADE | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 720,000 | 0 | | 720,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 750,000 | 0 | | |
|
| | $720,000 | $0 | | $720,000 | $750,000 | $0 | | |
|
| 187 | | MAPLEWOOD AND EVERGREEN DORM RENOVATIONS | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 337,260 | 0 | | 337,260 | 0 | 0 | | |
|
| | $337,260 | $0 | | $337,260 | $0 | $0 | | |
|
| 188 | | NEW WAREHOUSE | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 1,152,000 | 0 | | 1,152,000 | 0 | 0 | | |
|
| | $1,152,000 | $0 | | $1,152,000 | $0 | $0 | | |
|
| 189 | | LOCKDOWN BUILDING - NEW CONSTRUCTION | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | | 1,800,000 | | 1,800,000 | 0 | 0 | | |
|
| | $0 | $1,800,000 | | $1,800,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $2,209,260 | $1,800,000 | | $4,009,260 | $750,000 | $0 | | |
|
| AGENCY: 403 LTI - BRIDGE CITY | | | | | | | | | |
|
| 203 | | PERIMETER LIGHTING REPLACEMENT | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 288,000 | 0 | | 288,000 | 0 | 0 | | |
|
| | $288,000 | $0 | | $288,000 | $0 | $0 | | |
|
| 204 | | SCHOOL BUILDING RENOVATION | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 396,000 | 0 | | 396,000 | 0 | 0 | | |
|
| | $396,000 | $0 | | $396,000 | $0 | $0 | | |
|
| 205 | | SCHOOL ADDITION | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 420,000 | 0 | | 420,000 | 0 | 0 | | |
|
| | $420,000 | $0 | | $420,000 | $0 | $0 | | |
|
| 206 | | MAINTENANCE BUILDING, WORKSHOP AND STORAGE BUILDING | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | | 134,400 | | 134,400 | 0 | 0 | | |
|
| | $0 | $134,400 | | $134,400 | $0 | $0 | | |
|
| 1631 | | PLUMBING/MECHANICAL/ELECTRICAL RENOVATIONS, CONSTRUCTION | | | | | | JEFFERSON | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 545,000 | 0 | | |
|
| | $0 | $0 | | $0 | $545,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $1,104,000 | $134,400 | | $1,238,400 | $545,000 | $0 | | |
|
| AGENCY: 403 LTI - MONROE | | | | | | | | | |
|
| 208 | | EMERGENCY LIGHTING AND GENERATOR SYSTEM | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 1,224,000 | 0 | | 1,224,000 | 0 | 0 | | |
|
| | $1,224,000 | $0 | | $1,224,000 | $0 | $0 | | |
|
| 209 | | NEW ADMINISTRATION BUILDING CONSTRUCTION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 1,688,182 | 0 | | 1,688,182 | 0 | 0 | | |
|
| | $1,688,182 | $0 | | $1,688,182 | $0 | $0 | | |
|
| 210 | | DRY GOODS WAREHOUSE RENOVATION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 178,720 | 0 | | 178,720 | 0 | 0 | | |
|
| | $178,720 | $0 | | $178,720 | $0 | $0 | | |
|
| 211 | | LAUNDRY REFURBISHING AND REPAIR | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 202,061 | 0 | | 202,061 | 0 | 0 | | |
|
| | $202,061 | $0 | | $202,061 | $0 | $0 | | |
|
| 224 | | TRADES AND VOCATIONAL BUILDING RENOVATION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 147,669 | 0 | | 147,669 | 0 | 0 | | |
|
| | $147,669 | $0 | | $147,669 | $0 | $0 | | |
|
| 225 | | DINING FACILITY RENOVATION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 316,990 | 0 | | 316,990 | 0 | 0 | | |
|
| | $316,990 | $0 | | $316,990 | $0 | $0 | | |
|
| 226 | | VOCATIONAL EDUCATION MECHANIC SHOP | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | | 1,073,000 | | 1,073,000 | 0 | 0 | | |
|
| | $0 | $1,073,000 | | $1,073,000 | $0 | $0 | | |
|
| 227 | | MAINTENANCE REPAIR AND STORAGE BUILDING | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | | 1,135,528 | | 1,135,528 | 0 | 0 | | |
|
| | $0 | $1,135,528 | | $1,135,528 | $0 | $0 | | |
|
| 630 | | VOCATIONAL EDUCATIONAL CENTER CONSTRUCTION | | | | | | OUACHITA | | 5,10
|
| GENERAL OBLIGATION BONDS | 1,254,470 | 0 | | 1,254,470 | 0 | 0 | | |
|
| | $1,254,470 | $0 | | $1,254,470 | $0 | $0 | | |
|
| 1632 | | INFIRMARY BUILDING E ADDITIONS AND RENOVATIONS, PLANNING AND CONSTRUCTION | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 490,000 | 0 | | |
|
| | $0 | $0 | | $0 | $490,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 10 | | | | | | | | |
|
| AGENCY TOTAL | $5,012,092 | $2,208,528 | | $7,220,620 | $490,000 | $0 | | |
|
| AGENCY: 403 OFFICE OF YOUTH DEVELOPMENT | | | | | | | | | |
|
| 629 | | ACADIANA CORRECTIONAL CENTER FOR YOUTH | | | | | | MULTIPLE | | 5,10
|
| GENERAL OBLIGATION BONDS | 1,949,753 | 10,947,278 | | 12,897,031 | 0 | 0 | | |
|
| | $1,949,753 | $10,947,278 | | $12,897,031 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,949,753 | $10,947,278 | | $12,897,031 | $0 | $0 | | |
|
| AGENCY: 405 AVOYELLES CORRECTIONAL CENTER | | | | | | | | | |
|
| 186 | | WASTEWATER TREATMENT SYSTEM - AVOYELLES | | | | | | ALLEN | | 5
|
| GENERAL OBLIGATION BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| | $500,000 | $0 | | $500,000 | $0 | $0 | | |
|
| 192 | | MAIN KITCHEN RENOVATION FOR PROPOSED EXPANSION | | | | | | AVOYELLES | |
|
| GENERAL OBLIGATION BONDS | | 880,200 | | 880,200 | 0 | 0 | | |
|
| | $0 | $880,200 | | $880,200 | $0 | $0 | | |
|
| 193 | | ADDITIONAL GUARD TOWER | | | | | | AVOYELLES | |
|
| GENERAL OBLIGATION BONDS | | 72,000 | | 72,000 | 0 | 0 | | |
|
| | $0 | $72,000 | | $72,000 | $0 | $0 | | |
|
| 194 | | SUPPORT BUILDINGS FOR PROPOSED EXPANSION | | | | | | AVOYELLES | |
|
| GENERAL OBLIGATION BONDS | | 3,705,600 | | 3,705,600 | 0 | 0 | | |
|
| | $0 | $3,705,600 | | $3,705,600 | $0 | $0 | | |
|
| 195 | | REPLACE FLOORING IN MAIN KITCHEN | | | | | | AVOYELLES | |
|
| GENERAL OBLIGATION BONDS | | 73,500 | | 73,500 | 0 | 0 | | |
|
| | $0 | $73,500 | | $73,500 | $0 | $0 | | |
|
| 1637 | | DORMITORY AND CELLBLOCKS, PLANNING AND CONSTRUCTION | | | | | | AVOYELLES | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,490,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 320,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 165,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,975,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $500,000 | $4,731,300 | | $5,231,300 | $1,975,000 | $0 | | |
|
| AGENCY: 406 LA CORRECTIONAL INST WOMEN | | | | | | | | | |
|
| 149 | | REPLACE SEWER SYSTEM - CONSTRUCTION ONLY | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 198,525 | 0 | | 198,525 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 200,000 | 0 | | |
|
| | $198,525 | $0 | | $198,525 | $200,000 | $0 | | |
|
| 151 | | MEDICAL COMPLEX EXPANSION - ADMINISTRATION BUILDING RENOVATION - PARKING LOT/STREET OVERLAY PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 1,800,000 | 0 | | 1,800,000 | 0 | 0 | | |
|
| | $1,800,000 | $0 | | $1,800,000 | $0 | $0 | | |
|
| 153 | | MAINTENANCE BUILDING PLANNING AND CONTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 531,540 | 0 | | 531,540 | 0 | 0 | | |
|
| | $531,540 | $0 | | $531,540 | $0 | $0 | | |
|
| 155 | | GYMNASIUM / MULTI PURPOSE BUILDING PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | | 2,268,000 | | 2,268,000 | 0 | 0 | | |
|
| | $0 | $2,268,000 | | $2,268,000 | $0 | $0 | | |
|
| 156 | | C C T V MONITORING SYSTEM - ENTIRE FACILITY PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | | 72,000 | | 72,000 | 0 | 0 | | |
|
| | $0 | $72,000 | | $72,000 | $0 | $0 | | |
|
| 157 | | CULINARY ARTS PROGRAM PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | | 416,880 | | 416,880 | 0 | 0 | | |
|
| | $0 | $416,880 | | $416,880 | $0 | $0 | | |
|
| 158 | | AIR CONDITIONING & HEATING UNITS REPLACEMENT PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | | 701,796 | | 701,796 | 0 | 0 | | |
|
| | $0 | $701,796 | | $701,796 | $0 | $0 | | |
|
| 1633 | | LAUNDRY EXPANSION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 350,000 | 0 | | |
|
| | $0 | $0 | | $0 | $350,000 | $0 | | |
|
| 1634 | | CELLBLOCK UNITS, PLANNING AND CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 325,000 | 0 | | |
|
| | $0 | $0 | | $0 | $325,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 9 | | | | | | | | |
|
| AGENCY TOTAL | $2,530,065 | $3,458,676 | | $5,988,741 | $875,000 | $0 | | |
|
| AGENCY: 407 WINN CORRECTIONAL CENTER | | | | | | | | | |
|
| 142 | | LAUNDRY EQUIPMENT AND RENOVATIONS | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | | 178,800 | | 178,800 | 0 | 0 | | |
|
| | $0 | $178,800 | | $178,800 | $0 | $0 | | |
|
| 143 | | WASTEWATER TREATMENT SYSTEM - WINN | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| | $500,000 | $0 | | $500,000 | $0 | $0 | | |
|
| 144 | | POTABLE WATER REQUIREMENTS | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | 1,629,680 | 0 | | 1,629,680 | 0 | 0 | | |
|
| | $1,629,680 | $0 | | $1,629,680 | $0 | $0 | | |
|
| 145 | | KITCHEN RENOVATIONS AND NEW EQUIPMENT NEEDS | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | 192,830 | 0 | | 192,830 | 0 | 0 | | |
|
| | $192,830 | $0 | | $192,830 | $0 | $0 | | |
|
| 146 | | EDUCATION AND OTHER PROGRAMS BUILDING | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | | 421,200 | | 421,200 | 0 | 0 | | |
|
| | $0 | $421,200 | | $421,200 | $0 | $0 | | |
|
| 147 | | ADDITIONAL CANTEEN | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | | 99,600 | | 99,600 | 0 | 0 | | |
|
| | $0 | $99,600 | | $99,600 | $0 | $0 | | |
|
| 148 | | INFIRMARY RENOVATIONS & NEW X-RAY EQUIPMENT | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | | 84,000 | | 84,000 | 0 | 0 | | |
|
| | $0 | $84,000 | | $84,000 | $0 | $0 | | |
|
| 159 | | WATER TOWER WINN CORRECTIONAL CENTER | | | | | | WINN | |
|
| GENERAL OBLIGATION BONDS | | 63,000 | | 63,000 | 0 | 0 | | |
|
| | $0 | $63,000 | | $63,000 | $0 | $0 | | |
|
| 1635 | | DORMITORY AND CELLBLOCKS, PLANNING AND CONSTRUCTION | | | | | | WINN | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,575,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 320,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 175,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,070,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 9 | | | | | | | | |
|
| AGENCY TOTAL | $2,322,510 | $846,600 | | $3,169,110 | $2,070,000 | $0 | | |
|
| AGENCY: 408 ALLEN CORRECTIONAL CENTER | | | | | | | | | |
|
| 182 | | FIRE ALARM SYTEM AT ALLEN CORRECTIONAL CENTER | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS | 180,000 | 0 | | 180,000 | 0 | 0 | | |
|
| | $180,000 | $0 | | $180,000 | $0 | $0 | | |
|
| 183 | | WASTEWATER TREATMENT SYSTEM - ALLEN | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| | $500,000 | $0 | | $500,000 | $0 | $0 | | |
|
| 184 | | SUPPORT BUILDINGS & EQUIPMENT FOR PROPOSED EXPANSION AT ALLEN CORRECTIONAL CENTER | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS | 1,315,000 | 0 | | 1,315,000 | 0 | 0 | | |
|
| | $1,315,000 | $0 | | $1,315,000 | $0 | $0 | | |
|
| 628 | | REPLACEMENT OF FAILED JAIL STEEL DOOR LOCKING SYSTEM AT ALLEN CORRECTIONAL CENTER | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS | 720,000 | 0 | | 720,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 720,000 | 0 | | |
|
| | $720,000 | $0 | | $720,000 | $720,000 | $0 | | |
|
| 1636 | | DORMITORY AND CELLBLOCKS, PLANNING AND CONSTRUCTION | | | | | | ALLEN | |
|
| FEDERAL FUNDS | | 0 | | 0 | 1,630,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 320,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 180,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,130,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $2,715,000 | $0 | | $2,715,000 | $2,850,000 | $0 | | |
|
| AGENCY: 409 DIXON CORRECTIONAL INSTITUTE | | | | | | | | | |
|
| 190 | | 150 MAN DORMITORY, FENCING & COVERED WALKWAYS | | | | | | EAST FELICIANA | | 5
|
| GENERAL OBLIGATION BONDS | 2,340,240 | 0 | | 2,340,240 | 0 | 0 | | |
|
| | $2,340,240 | $0 | | $2,340,240 | $0 | $0 | | |
|
| 207 | | RENOVATIONS FOR DORMITORY AREAS | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 5,844,000 | 0 | | 5,844,000 | 0 | 0 | | |
|
| | $5,844,000 | $0 | | $5,844,000 | $0 | $0 | | |
|
| 212 | | REROOF SUPPORT BUILDINGS WITH METAL ROOFING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 114,000 | | 114,000 | 0 | 0 | | |
|
| | $0 | $114,000 | | $114,000 | $0 | $0 | | |
|
| 213 | | WAREHOUSE EXPANSION | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 495,000 | 0 | | 495,000 | 0 | 0 | | |
|
| | $495,000 | $0 | | $495,000 | $0 | $0 | | |
|
| 214 | | ASBESTOS ABATEMENT | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 970,970 | | 970,970 | 0 | 0 | | |
|
| | $0 | $970,970 | | $970,970 | $0 | $0 | | |
|
| 218 | | NEW SECURITY / CONTROL CENTER | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 330,000 | | 330,000 | 0 | 0 | | |
|
| | $0 | $330,000 | | $330,000 | $0 | $0 | | |
|
| 219 | | PAVE PERIMETER DIRT ROADS AND PARKING LOTS | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 1,035,000 | 0 | | 1,035,000 | 0 | 0 | | |
|
| | $1,035,000 | $0 | | $1,035,000 | $0 | $0 | | |
|
| 220 | | REPLACE WATER LINES | | | | | | EAST FELICIANA | | 5
|
| STATE GENERAL FUND (DIRECT) | | 300,000 | | 300,000 | 0 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $0 | $0 | | |
|
| 221 | | NEW TRAINING CENTER | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 307,200 | | 307,200 | 0 | 0 | | |
|
| | $0 | $307,200 | | $307,200 | $0 | $0 | | |
|
| 1590 | | BATHROOMS RENOVATION FOR CODE COMPLIANCE | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 1,740,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,740,000 | $0 | | |
|
| 1638 | | KITCHENS RENOVATIONS FOR UNITS 2 AND 3, (SUPPLEMENTAL), CONSTRUCTION | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 825,000 | 0 | | |
|
| | $0 | $0 | | $0 | $825,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 11 | | | | | | | | |
|
| AGENCY TOTAL | $9,714,240 | $2,022,170 | | $11,736,410 | $2,565,000 | $0 | | |
|
| AGENCY: 412 WORK TRAINING FACILITY - NORTH | | | | | | | | | |
|
| 185 | | FREEZER AND COOLER REPLACEMENT | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 133,000 | 0 | | 133,000 | 0 | 0 | | |
|
| | $133,000 | $0 | | $133,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $133,000 | $0 | | $133,000 | $0 | $0 | | |
|
| AGENCY: 413 ELAYN HUNT CORRECTIONAL CENTER | | | | | | | | | |
|
| 215 | | SKILLED NURSING CARE, MENTAL HEALTH UNIT AND RENOVATION OF RELATED SUPPORT FACILITIES (CONSTRUCTION) | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 37,543,351 | 0 | | 37,543,351 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 280,000 | 0 | | |
|
| | $37,543,351 | $0 | | $37,543,351 | $280,000 | $0 | | |
|
| 216 | | CHILL - HOT WATER TRUNK LINES REPAIR & REPLACEMENT | | | | | | IBERVILLE | | 5
|
| GENERAL OBLIGATION BONDS | 1,353,830 | 0 | | 1,353,830 | 0 | 0 | | |
|
| | $1,353,830 | $0 | | $1,353,830 | $0 | $0 | | |
|
| 217 | | REPLACE CHILLERS, COOLING TOWERS, PUMPS AND AIR HANDLERS | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 788,000 | 700,000 | | 1,488,000 | 0 | 0 | | |
|
| | $788,000 | $700,000 | | $1,488,000 | $0 | $0 | | |
|
| 222 | | REBUILD EMERGENCY GENERATORS | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 125,798 | 0 | | 125,798 | 0 | 0 | | |
|
| | $125,798 | $0 | | $125,798 | $0 | $0 | | |
|
| 223 | | I M P A C T SUPPORT BUILDING | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 359,107 | 0 | | 359,107 | 0 | 0 | | |
|
| | $359,107 | $0 | | $359,107 | $0 | $0 | | |
|
| 228 | | REFURBISH PLUMBING IN D1 CELLBLOCK | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 129,043 | 0 | | 129,043 | 0 | 0 | | |
|
| | $129,043 | $0 | | $129,043 | $0 | $0 | | |
|
| 229 | | RENOVATE D-1 AND D-2 KITCHENS - CONSTRUCTION | | | | | | IBERVILLE | |
|
| GENERAL OBLIGATION BONDS | 1,678,320 | 0 | | 1,678,320 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 895,000 | 0 | | |
|
| | $1,678,320 | $0 | | $1,678,320 | $895,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $41,977,449 | $700,000 | | $42,677,449 | $1,175,000 | $0 | | |
|
| AGENCY: 414 DAVID WADE CORRECTIONAL CENTER | | | | | | | | | |
|
| 200 | | CELLBLOCK AND DORMITORY DOOR RENOVATIONS | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS | 1,250,004 | 0 | | 1,250,004 | 0 | 0 | | |
|
| | $1,250,004 | $0 | | $1,250,004 | $0 | $0 | | |
|
| 201 | | MEDICAL BUILDING AT FORCHT WADE CORRECTIONAL CENTER | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 1,685,122 | 0 | | 1,685,122 | 0 | 0 | | |
|
| | $1,685,122 | $0 | | $1,685,122 | $0 | $0 | | |
|
| 202 | | CELLBLOCKS AND SPECIAL NEEDS DORMITORY (EXPANSION) WITH SUPPORT BUILDING (THIRD COMPOUND) | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS | 23,080,704 | 0 | | 23,080,704 | 0 | 0 | | |
|
| | $23,080,704 | $0 | | $23,080,704 | $0 | $0 | | |
|
| 1639 | | WASTEWATER TREATMENT PROGRAM, CONSTRUCTION | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,080,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,080,000 | $0 | | |
|
| 1640 | | CADDO DETENTION CENTER RENOVATION, CONSTRUCTION | | | | | | CLAIBORNE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 475,000 | 0 | | |
|
| | $0 | $0 | | $0 | $475,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $26,015,830 | $0 | | $26,015,830 | $1,555,000 | $0 | | |
|
| AGENCY: 416 WASHINGTON CORRECTIONAL INST | | | | | | | | | |
|
| 196 | | SUN UNIT VISITING BUILDING | | | | | | WASHINGTON | | 5
|
| GENERAL OBLIGATION BONDS | 337,439 | 0 | | 337,439 | 0 | 0 | | |
|
| | $337,439 | $0 | | $337,439 | $0 | $0 | | |
|
| 197 | | 104 BED CELLBLOCK AND 150 BED DORMITORY WITH SUPPORT BUILDINGS | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | 34,724,680 | 0 | | 34,724,680 | 0 | 0 | | |
|
| | $34,724,680 | $0 | | $34,724,680 | $0 | $0 | | |
|
| 198 | | VISITOR PROCESSING, INMATE PROCESSING, RECEPTION, ROLL CALL BUILDING | | | | | | WASHINGTON | | 5
|
| GENERAL OBLIGATION BONDS | 913,745 | 0 | | 913,745 | 0 | 0 | | |
|
| | $913,745 | $0 | | $913,745 | $0 | $0 | | |
|
| 199 | | GENERIC INDUSTRIAL BUILDING | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | 1,291,691 | 0 | | 1,291,691 | 0 | 0 | | |
|
| | $1,291,691 | $0 | | $1,291,691 | $0 | $0 | | |
|
| 1630 | | ROOFING AND WATERPROOFING FOR VARIOUS BUILDINGS, PLANNING AND CONSTRUCTION | | | | | | WASHINGTON | |
|
| NRP BONDS | | 0 | | 0 | 540,000 | 0 | | |
|
| | $0 | $0 | | $0 | $540,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $37,267,555 | $0 | | $37,267,555 | $540,000 | $0 | | |
|
| AGENCY: 418 PUB SAFETY OFF OF MGMT & FIN | | | | | | | | | |
|
| 230 | | MOTOR VEHICLES OFFICE- SHREVEPORT PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 185,000 | 1,270,000 | | 1,455,000 | 0 | 0 | | |
|
| | $185,000 | $1,270,000 | | $1,455,000 | $0 | $0 | | |
|
| 231 | | MOTOR VEHICLES OFFICE- LAKE FOREST PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 185,000 | 1,270,000 | | 1,455,000 | 0 | 0 | | |
|
| | $185,000 | $1,270,000 | | $1,455,000 | $0 | $0 | | |
|
| 232 | | MOTOR VEHICLES OFFICE- BOSSIER PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | | 1,455,000 | | 1,455,000 | 0 | 0 | | |
|
| | $0 | $1,455,000 | | $1,455,000 | $0 | $0 | | |
|
| 233 | | MOTOR VEHICLES OFFICE- ALEXANDRIA PLANNING, BLDG DEMOLITION, CONSTRUCTION, AND EQUIPMENT | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 1,470,000 | | 1,470,000 | 0 | 0 | | |
|
| | $0 | $1,470,000 | | $1,470,000 | $0 | $0 | | |
|
| 234 | | MOTOR VEHICLES OFFICE- VETERANS PLANNING, BLDG DEMOLITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 2,280,000 | | 2,280,000 | 0 | 0 | | |
|
| | $0 | $2,280,000 | | $2,280,000 | $0 | $0 | | |
|
| 235 | | MOTOR VEHICLES OFFICE- SLIDELL PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 1,059,000 | | 1,059,000 | 0 | 0 | | |
|
| | $0 | $1,059,000 | | $1,059,000 | $0 | $0 | | |
|
| 236 | | MOTOR VEHICLES OFFICE- HOUMA PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | | |
|
| GENERAL OBLIGATION BONDS | | 1,059,000 | | 1,059,000 | 0 | 0 | | |
|
| | $0 | $1,059,000 | | $1,059,000 | $0 | $0 | | |
|
| 237 | | MOTOR VEHICLES OFFICE- GONZALES PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ASCENSION | |
|
| GENERAL OBLIGATION BONDS | | 1,059,000 | | 1,059,000 | 0 | 0 | | |
|
| | $0 | $1,059,000 | | $1,059,000 | $0 | $0 | | |
|
| 238 | | MOTOR VEHICLES OFFICE- HAMMOND PLANNING,LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 1,059,000 | | 1,059,000 | 0 | 0 | | |
|
| | $0 | $1,059,000 | | $1,059,000 | $0 | $0 | | |
|
| 239 | | MOTOR VEHICLES OFFICE- CHALMETTE PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ST. BERNARD | |
|
| GENERAL OBLIGATION BONDS | 152,000 | 907,000 | | 1,059,000 | 0 | 0 | | |
|
| | $152,000 | $907,000 | | $1,059,000 | $0 | $0 | | |
|
| 240 | | MOTOR VEHICLES OFFICE- MONROE PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS | | 1,059,000 | | 1,059,000 | 0 | 0 | | |
|
| | $0 | $1,059,000 | | $1,059,000 | $0 | $0 | | |
|
| 241 | | MOTOR VEHICLES OFFICE- NEW IBERIA PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | IBERIA | |
|
| GENERAL OBLIGATION BONDS | 1,059,000 | 0 | | 1,059,000 | 0 | 0 | | |
|
| | $1,059,000 | $0 | | $1,059,000 | $0 | $0 | | |
|
| 242 | | MOTOR VEHICLES OFFICE- THIBODAUX PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 243 | | MOTOR VEHICLES OFFICE- LEESVILLE PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | VERNON | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 244 | | MOTOR VEHICLES OFFICE- ABBEVILLE PLANNING,LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | VERMILION | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 245 | | MOTOR VEHICLES OFFICE- BUENA VISTA PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | ST. MARY | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 246 | | MOTOR VEHICLES OFFICE- NATCHITOCHES PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 94,000 | 544,000 | | 638,000 | 0 | 0 | | |
|
| | $94,000 | $544,000 | | $638,000 | $0 | $0 | | |
|
| 247 | | MOTOR VEHICLES OFFICE- WINNSBORO PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | FRANKLIN | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 248 | | MOTOR VEHICLES OFFICE- MINDEN PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | WEBSTER | |
|
| GENERAL OBLIGATION BONDS | 94,000 | 544,000 | | 638,000 | 0 | 0 | | |
|
| | $94,000 | $544,000 | | $638,000 | $0 | $0 | | |
|
| 249 | | MOTOR VEHICLES OFFICE- ALGIERS PLANNING, LAND ACQUISITION, CONSTRUCTION AND EQUIPMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 374,000 | | 374,000 | 0 | 0 | | |
|
| | $0 | $374,000 | | $374,000 | $0 | $0 | | |
|
| 250 | | MOTOR VEHICLES OFFICE- COLUMBIA PLANNING,LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | CALDWELL | |
|
| GENERAL OBLIGATION BONDS | 374,000 | 0 | | 374,000 | 0 | 0 | | |
|
| | $374,000 | $0 | | $374,000 | $0 | $0 | | |
|
| 251 | | MOTOR VEHICLES OFFICE- BATON ROUGE INDEPENDENCE RENOVATION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 180,000 | | 180,000 | 0 | 0 | | |
|
| | $0 | $180,000 | | $180,000 | $0 | $0 | | |
|
| 252 | | PUBLIC SAFETY ADMINISTRATIVE COMPLEX RELOCATION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 5,710,603 | 33,808,985 | | 39,519,588 | 0 | 0 | | |
|
| | $5,710,603 | $33,808,985 | | $39,519,588 | $0 | $0 | | |
|
| 253 | | STATE POLICE DRIVER TRAINING FACILITY , RELOCATION, PLANNING, CONSTRUCTION, AND EQUIPMENT | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 454,634 | | 454,634 | 0 | 0 | | |
|
| | $0 | $454,634 | | $454,634 | $0 | $0 | | |
|
| 254 | | TRAINING ACADEMY DORMITORY ADDITION | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | | 4,217,200 | | 4,217,200 | 0 | 0 | | |
|
| | $0 | $4,217,200 | | $4,217,200 | $0 | $0 | | |
|
| 255 | | HOLDEN FACILITY- DORMITORIES AND RECREATION ROOM PLANNING, CONSTRUCTION AND EQUIPMENT, ALSO PAVE 1.8 MILES OF LA447 | | | | | | LIVINGSTON | |
|
| GENERAL OBLIGATION BONDS | | 4,816,480 | | 4,816,480 | 0 | 0 | | |
|
| | $0 | $4,816,480 | | $4,816,480 | $0 | $0 | | |
|
| 256 | | ROOF REPLACEMENT - INDEPENDENCE COMPLEX | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 849,917 | | 849,917 | 0 | 0 | | |
|
| | $0 | $849,917 | | $849,917 | $0 | $0 | | |
|
| 257 | | ROOF REPAIRS- TROOP G | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 110,239 | | 110,239 | 0 | 0 | | |
|
| | $0 | $110,239 | | $110,239 | $0 | $0 | | |
|
| 258 | | MAJOR REPAIRS - DONALD J. THIBODEAUX TRAINING COMPLEX | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 1,319,237 | | 1,319,237 | 0 | 0 | | |
|
| | $0 | $1,319,237 | | $1,319,237 | $0 | $0 | | |
|
| 259 | | RENOVATE OLD TROOP H | | | | | | VERNON | |
|
| GENERAL OBLIGATION BONDS | | 162,000 | | 162,000 | 0 | 0 | | |
|
| | $0 | $162,000 | | $162,000 | $0 | $0 | | |
|
| 260 | | MOTOR VEHICLES OFFICE- TALLULAH PLANNING, LAND ACQUISITION, CONSTRUCTION, AND EQUIPMENT | | | | | | MADISON | |
|
| GENERAL OBLIGATION BONDS | 374,000 | 0 | | 374,000 | 0 | 0 | | |
|
| | $374,000 | $0 | | $374,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 31 | | | | | | | | |
|
| AGENCY TOTAL | $8,227,603 | $64,517,692 | | $72,745,295 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 137 | | | | | | | | |
|
| DEPARTMENT TOTAL | $211,606,403 | $123,938,050 | | $335,544,453 | $35,480,000 | $0 | | |
|
| 09 DEPT OF HEALTH & HOSPITALS | | | | | | | | | |
|
| AGENCY: 311 N.O.HOME & REHABILITATION CTR | | | | | | | | | |
|
| 295 | | WATER PROOF BUILDING, THERMAL PROTECTION AND REMOVAL OF THROUGH THE WALL AIR CONDITIONING UNITS | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 1,080,000 | 0 | | 1,080,000 | 0 | 0 | | |
|
| | $1,080,000 | $0 | | $1,080,000 | $0 | $0 | | |
|
| 296 | | ROOF REPLACEMENT | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 185,400 | 0 | | 185,400 | 0 | 0 | | |
|
| | $185,400 | $0 | | $185,400 | $0 | $0 | | |
|
| 297 | | KITCHEN AND DINING AREA RENOVATION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 390,000 | 0 | | 390,000 | 0 | 0 | | |
|
| | $390,000 | $0 | | $390,000 | $0 | $0 | | |
|
| 298 | | RESIDENTS ROOMS AND LIVING AREA | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 450,000 | 0 | | 450,000 | 0 | 0 | | |
|
| | $450,000 | $0 | | $450,000 | $0 | $0 | | |
|
| 299 | | FIRE ALARM AND MONITORING SYSTEM REFER TO WATER PROOF BUILDING, THERMAL PROTECTION, AND REMOVAL OF THROUGH THE WALL AIR CONDITIONING UNITS 'CAPITAL OUTLAY REQUEST' | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 90,000 | 0 | | 90,000 | 0 | 0 | | |
|
| | $90,000 | $0 | | $90,000 | $0 | $0 | | |
|
| 351 | | WATER PROOF BUILDING, THERMAL PROTECTION AND REMOVAL OF THROUGH WALL AIR CONDITIONING UNITS, AND FIRE ALARM AND MONITORING SYSTEM | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 1,844,000 | 0 | | 1,844,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 1,935,000 | 0 | | |
|
| | $1,844,000 | $0 | | $1,844,000 | $1,935,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $4,039,400 | $0 | | $4,039,400 | $1,935,000 | $0 | | |
|
| AGENCY: 319 VILLA FELICIANA MEDICAL COMPLX | | | | | | | | | |
|
| 280 | | EXPAND EMERGENCY POWER CAPACITY | | | | | | EAST FELICIANA | | 2
|
| GENERAL OBLIGATION BONDS | 96,000 | 0 | | 96,000 | 0 | 0 | | |
|
| | $96,000 | $0 | | $96,000 | $0 | $0 | | |
|
| 281 | | REPLACE INCINERATOR | | | | | | EAST FELICIANA | | 5
|
| GENERAL OBLIGATION BONDS | 80,000 | 0 | | 80,000 | 0 | 0 | | |
|
| | $80,000 | $0 | | $80,000 | $0 | $0 | | |
|
| 282 | | PIPED-IN OXYGEN, SUCTION, AND COMPRESSED AIR | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 168,000 | | 168,000 | 0 | 0 | | |
|
| | $0 | $168,000 | | $168,000 | $0 | $0 | | |
|
| 283 | | RENOVATE PATIENT BUILDINGS | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 566,400 | | 566,400 | 0 | 0 | | |
|
| | $0 | $566,400 | | $566,400 | $0 | $0 | | |
|
| 284 | | NEW PATIENTS SERVICE BUILDING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 5,821,996 | | 5,821,996 | 0 | 0 | | |
|
| | $0 | $5,821,996 | | $5,821,996 | $0 | $0 | | |
|
| 285 | | REPLACE HEATING AND AIR CONDITIONING SYSTEMS | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 1,555,200 | | 1,555,200 | 0 | 0 | | |
|
| | $0 | $1,555,200 | | $1,555,200 | $0 | $0 | | |
|
| 286 | | RESURFACE ROADS AND PARKING AREAS | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | | 634,886 | | 634,886 | 0 | 0 | | |
|
| | $0 | $634,886 | | $634,886 | $0 | $0 | | |
|
| 1641 | | REPLACE FLOOR COVERING THREE PATIENT BUILDINGS, AND RENOVATE PATIENT BATHING AREA, PLANNING AND CONSTRUCTION | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,545,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,545,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $176,000 | $8,746,482 | | $8,922,482 | $2,545,000 | $0 | | |
|
| AGENCY: 326 OFFICE OF PUBLIC HEALTH | | | | | | | | | |
|
| 287 | | O P H CENTRAL LABORATORY FACILITY | | | | | | STATEWIDE | | 5
|
| GENERAL OBLIGATION BONDS | 13,588,018 | 3,790,000 | | 17,378,018 | 0 | 0 | | |
|
| | $13,588,018 | $3,790,000 | | $17,378,018 | $0 | $0 | | |
|
| 1329 | | ST. CHARLES PARISH PUBLIC HEALTH UNIT | | | | | | ST. CHARLES | |
|
| GENERAL OBLIGATION BONDS | 164,937 | 1,964,307 | | 2,129,244 | 0 | 0 | | |
|
| | $164,937 | $1,964,307 | | $2,129,244 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $13,752,955 | $5,754,307 | | $19,507,262 | $0 | $0 | | |
|
| AGENCY: 330 OFFICE OF MENTAL HEALTH | | | | | | | | | |
|
| 261 | | REPLACE ROOF AND WATERPROOF BUILDING | | | | | | ST. TAMMANY | | 5
|
| GENERAL OBLIGATION BONDS | 120,000 | 0 | | 120,000 | 0 | 0 | | |
|
| | $120,000 | $0 | | $120,000 | $0 | $0 | | |
|
| 262 | | ROOF REPLACEMENT, REPAIRS/RENOVATIONS OF LAFOURCHE MENTAL HEALTH CENTER | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 105,415 | 0 | | 105,415 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 105,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 120,000 | 0 | | |
|
| | $105,415 | $0 | | $105,415 | $225,000 | $0 | | |
|
| 312 | | DR. J. H. TYLER MENTAL HEALTH CENTER, PROJECT #1 ACCESS CONTROL SECURITY SYSTEM PLANNING AND CONSTRUCTION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 98,822 | 0 | | 98,822 | 0 | 0 | | |
|
| | $98,822 | $0 | | $98,822 | $0 | $0 | | |
|
| 313 | | CENTRAL CITY MENTAL HEALTH CENTER REPLACE ROOF/WATERPROOF AND REPLACE AIR CONDITIONING UNITS PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 203,400 | 0 | | 203,400 | 0 | 0 | | |
|
| | $203,400 | $0 | | $203,400 | $0 | $0 | | |
|
| 314 | | CHARTRES - PONCHARTRAIN MENTAL HEALTH CENTER REPLACEMENT OF CEILING TILES AND A/C DUCTS PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 122,724 | 0 | | 122,724 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 125,000 | 0 | | |
|
| | $122,724 | $0 | | $122,724 | $125,000 | $0 | | |
|
| 315 | | NEW ORLEANS MENTAL HEALTH CENTER REPLACE AIR CONDITIONING UNIT PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 288,000 | 0 | | 288,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 170,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 120,000 | 0 | | |
|
| | $288,000 | $0 | | $288,000 | $290,000 | $0 | | |
|
| 316 | | TERREBONNE MENTAL HEALTH CLINIC TERREBONNE PSYCHIATRIC RECOVERY CENTER RENOVATION, ADDITION AND PLUMBING PLANNING AND CONSTRUCTION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 84,000 | 0 | | 84,000 | 0 | 0 | | |
|
| | $84,000 | $0 | | $84,000 | $0 | $0 | | |
|
| 317 | | RIVER PARISHES MENTAL HEALTH CENTER REPLACE ROOF, WATERPROOF BUILDING REPAIR INTERIOR WATER DAMAGE PLANNING AND CONSTRUCTION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 116,400 | 0 | | 116,400 | 0 | 0 | | |
|
| | $116,400 | $0 | | $116,400 | $0 | $0 | | |
|
| 318 | | DR. J. H. TYLER MENTAL HEALTH CENTER, PROJECT #2 FIRE ALARM/EMERGENCY POWERS SYSTEMS UPGRADE INSTALL SPRINKLER SYSTEM PLANNING AND CONSTRUCTION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 442,560 | 0 | | 442,560 | 0 | 0 | | |
|
| | $442,560 | $0 | | $442,560 | $0 | $0 | | |
|
| 319 | | LAKE CHARLES MENTAL HEALTH CENTER REPLACE EXISTING HEATING & AIR CONDITIONING SYSTEM PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | | 5
|
| GENERAL OBLIGATION BONDS | 156,000 | 0 | | 156,000 | 0 | 0 | | |
|
| | $156,000 | $0 | | $156,000 | $0 | $0 | | |
|
| 320 | | MONROE MENTAL HEALTH CENTER REPLACE ROOF, PLANNING AND CONSTRUCTION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 100,000 | 0 | | 100,000 | 0 | 0 | | |
|
| | $100,000 | $0 | | $100,000 | $0 | $0 | | |
|
| 321 | | ROSENBLUM MENTAL HEALTH CENTER REPLACE ROOF AND WATERPROOF BUILDING PLANNING AND CONSTRUCTION | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | 144,000 | 0 | | 144,000 | 0 | 0 | | |
|
| | $144,000 | $0 | | $144,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 12 | | | | | | | | |
|
| AGENCY TOTAL | $1,981,321 | $0 | | $1,981,321 | $640,000 | $0 | | |
|
| AGENCY: 331 CENTRAL LA STATE HOSPITAL | | | | | | | | | |
|
| 263 | | CENTRAL AIR CONDITIONING FOR TWO BUILDINGS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 720,001 | | 720,001 | 0 | 0 | | |
|
| | $0 | $720,001 | | $720,001 | $0 | $0 | | |
|
| 264 | | COMPARTMENTALIZATION OF BED AREAS, UNIT 8 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 1,145,394 | | 1,145,394 | 0 | 0 | | |
|
| | $0 | $1,145,394 | | $1,145,394 | $0 | $0 | | |
|
| 265 | | EDUCATIION/ACTIVITY CENTER, AUDITORIUM AND CHAPEL | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 7,601,000 | 0 | | 7,601,000 | 0 | 0 | | |
|
| | $7,601,000 | $0 | | $7,601,000 | $0 | $0 | | |
|
| 266 | | FUNDS FOR RENOVATION OF UNIT 5 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 4,816,212 | 0 | | 4,816,212 | 0 | 0 | | |
|
| | $4,816,212 | $0 | | $4,816,212 | $0 | $0 | | |
|
| 267 | | FUNDS FOR RENOVATION OF UNIT 6 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 4,946,316 | | 4,946,316 | 0 | 0 | | |
|
| | $0 | $4,946,316 | | $4,946,316 | $0 | $0 | | |
|
| 268 | | FUNDS FOR RENOVATION OF UNIT 7 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 4,149,756 | | 4,149,756 | 0 | 0 | | |
|
| | $0 | $4,149,756 | | $4,149,756 | $0 | $0 | | |
|
| 269 | | FUNDS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 388,373 | 0 | | 388,373 | 0 | 0 | | |
|
| | $388,373 | $0 | | $388,373 | $0 | $0 | | |
|
| 270 | | FUNDS TO DEMOLISH UNIT 13 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 54,000 | 0 | | 54,000 | 0 | 0 | | |
|
| | $54,000 | $0 | | $54,000 | $0 | $0 | | |
|
| 271 | | FUNDS TO UPGRADE SEWERAGE TREATMENT PLANT | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 756,000 | | 756,000 | 0 | 0 | | |
|
| | $0 | $756,000 | | $756,000 | $0 | $0 | | |
|
| 272 | | MODIFICATION OF EXISTING HVAC SYSTEM IN UNIT 29 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 240,000 | 0 | | 240,000 | 0 | 0 | | |
|
| | $240,000 | $0 | | $240,000 | $0 | $0 | | |
|
| 273 | | RENOVATIONS TO PROVIDE FOR STRUCTURED PATIENT LIVING | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 509,524 | | 509,524 | 0 | 0 | | |
|
| | $0 | $509,524 | | $509,524 | $0 | $0 | | |
|
| 274 | | REPLACEMENT OF EMERGENCY GENERATORS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 1,490,400 | 0 | | 1,490,400 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,250,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 490,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 800,000 | 0 | | |
|
| | $1,490,400 | $0 | | $1,490,400 | $2,540,000 | $0 | | |
|
| 275 | | REPLACEMENT ROOFS FOR FOREST GLEN BUILDINGS | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 175,949 | 0 | | 175,949 | 0 | 0 | | |
|
| | $175,949 | $0 | | $175,949 | $0 | $0 | | |
|
| 276 | | REPLACEMENT WINDOWS UNIT 1 | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 112,820 | 0 | | 112,820 | 0 | 0 | | |
|
| | $112,820 | $0 | | $112,820 | $0 | $0 | | |
|
| 277 | | RESURFACING OF STREETS AND PARKING LOTS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 963,382 | 0 | | 963,382 | 0 | 0 | | |
|
| | $963,382 | $0 | | $963,382 | $0 | $0 | | |
|
| 278 | | SPRINKLER SYSTEM AND TEMPERATURE CONTROL BUILDING 117 | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 237,240 | | 237,240 | 0 | 0 | | |
|
| | $0 | $237,240 | | $237,240 | $0 | $0 | | |
|
| 279 | | WATERPROOF BRICK BUILDINGS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 961,096 | 0 | | 961,096 | 0 | 0 | | |
|
| | $961,096 | $0 | | $961,096 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 17 | | | | | | | | |
|
| AGENCY TOTAL | $16,803,232 | $12,464,231 | | $29,267,463 | $2,540,000 | $0 | | |
|
| AGENCY: 332 EAST LA STATE HOSPITAL | | | | | | | | | |
|
| 300 | | PURCHASE AIR CONDITIONING UNIT --- SUPPORT | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 194,400 | 0 | | 194,400 | 0 | 0 | | |
|
| | $194,400 | $0 | | $194,400 | $0 | $0 | | |
|
| 301 | | PURCHASE AIR CONDITIONING UNIT -- PATIENT CARE | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 165,000 | 0 | | 165,000 | 0 | 0 | | |
|
| | $165,000 | $0 | | $165,000 | $0 | $0 | | |
|
| 302 | | REPLACEMENT OF WATER DISTRIBUTION SYSTEM | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 0 | | 1,000,000 | 0 | 0 | | |
|
| | $1,000,000 | $0 | | $1,000,000 | $0 | $0 | | |
|
| 303 | | CONVERSION OF AIR CONDITIONING REFRIGERANT | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 70,000 | 0 | | 70,000 | 0 | 0 | | |
|
| | $70,000 | $0 | | $70,000 | $0 | $0 | | |
|
| 304 | | REWIRING OAKCREST BUILDING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 975,000 | 0 | | 975,000 | 0 | 0 | | |
|
| | $975,000 | $0 | | $975,000 | $0 | $0 | | |
|
| 305 | | ROAD AND STREET REPAIR | | | | | | EAST FELICIANA | |
|
| STATE GENERAL FUND (DIRECT) | 273,420 | 0 | | 273,420 | 0 | 0 | | |
|
| | $273,420 | $0 | | $273,420 | $0 | $0 | | |
|
| 306 | | REPAIR OF LIFT STATION | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 60,000 | 0 | | 60,000 | 0 | 0 | | |
|
| | $60,000 | $0 | | $60,000 | $0 | $0 | | |
|
| 307 | | INSPECTION FOR AND TREATMENT OF TERMITES | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 107,100 | 0 | | 107,100 | 0 | 0 | | |
|
| | $107,100 | $0 | | $107,100 | $0 | $0 | | |
|
| 308 | | RENOVATION AND RESTORATION OF CENTER BUILDING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 630,000 | 0 | | 630,000 | 0 | 0 | | |
|
| | $630,000 | $0 | | $630,000 | $0 | $0 | | |
|
| 309 | | CONSTRUCTING PATIENT COMMUNITY/DIETARY BUILDING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 369,600 | 4,752,300 | | 5,121,900 | 0 | 0 | | |
|
| | $369,600 | $4,752,300 | | $5,121,900 | $0 | $0 | | |
|
| 310 | | LAUNDRY EQUIPMENT FOR JACKSON REGIONAL LAUNDRY | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 275,000 | 0 | | 275,000 | 0 | 0 | | |
|
| | $275,000 | $0 | | $275,000 | $0 | $0 | | |
|
| 311 | | RENOVATE PARKER BUILDING | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 245,700 | 0 | | 245,700 | 0 | 0 | | |
|
| | $245,700 | $0 | | $245,700 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 12 | | | | | | | | |
|
| AGENCY TOTAL | $4,365,220 | $4,752,300 | | $9,117,520 | $0 | $0 | | |
|
| AGENCY: 333 SOUTHEAST LOUISIANA HOSPITAL | | | | | | | | | |
|
| 288 | | REPLACE LOCK SYSTEM | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 683,374 | | 683,374 | 0 | 0 | | |
|
| | $0 | $683,374 | | $683,374 | $0 | $0 | | |
|
| 289 | | REPLACE BOILERS AND DE-AERATOR SYSTEM | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 653,836 | | 653,836 | 0 | 0 | | |
|
| | $0 | $653,836 | | $653,836 | $0 | $0 | | |
|
| 292 | | SIDEWALKS, CURBS, BASKETBALL COURTS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 940,969 | | 940,969 | 0 | 0 | | |
|
| | $0 | $940,969 | | $940,969 | $0 | $0 | | |
|
| 293 | | RENOVATE ADMINISTRATION AND VOCATIONAL REHABILITATION | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 1,808,374 | | 1,808,374 | 0 | 0 | | |
|
| | $0 | $1,808,374 | | $1,808,374 | $0 | $0 | | |
|
| 294 | | 165 COMPLEX RENOVATIONS/ADOLESCENT MONITORING AND COMMUNICATIONS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 1,247,240 | | 1,247,240 | 0 | 0 | | |
|
| | $0 | $1,247,240 | | $1,247,240 | $0 | $0 | | |
|
| 325 | | RENOVATE ACTIVITY BUILDING AND GYM | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 536,024 | | 536,024 | 0 | 0 | | |
|
| | $0 | $536,024 | | $536,024 | $0 | $0 | | |
|
| 326 | | RELOCATE POWER CABLES TO UNDERGROUND | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 612,216 | | 612,216 | 0 | 0 | | |
|
| | $0 | $612,216 | | $612,216 | $0 | $0 | | |
|
| 327 | | REPLACE INCINERATOR | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 262,200 | | 262,200 | 0 | 0 | | |
|
| | $0 | $262,200 | | $262,200 | $0 | $0 | | |
|
| 328 | | 165 COMPLEX CHILLER REPLACEMENT | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 144,900 | | 144,900 | 0 | 0 | | |
|
| | $0 | $144,900 | | $144,900 | $0 | $0 | | |
|
| 329 | | 132 BED PSYCHIATRIC UNIT | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 765,350 | 8,674,180 | | 9,439,530 | 0 | 0 | | |
|
| | $765,350 | $8,674,180 | | $9,439,530 | $0 | $0 | | |
|
| 330 | | RENOVATE ADULT UNITS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 5,597,552 | 0 | | 5,597,552 | 0 | 0 | | |
|
| | $5,597,552 | $0 | | $5,597,552 | $0 | $0 | | |
|
| 331 | | FACILITY DRAINAGE, ADOLESCENT PARKING & ROADS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 1,486,596 | 0 | | 1,486,596 | 0 | 0 | | |
|
| | $1,486,596 | $0 | | $1,486,596 | $0 | $0 | | |
|
| 332 | | REPLACE POTABLE WATER DISTRIBUTION LINES | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 575,467 | 0 | | 575,467 | 0 | 0 | | |
|
| | $575,467 | $0 | | $575,467 | $0 | $0 | | |
|
| 333 | | RENOVATE CHILDREN'S UNITS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 812,128 | 0 | | 812,128 | 0 | 0 | | |
|
| | $812,128 | $0 | | $812,128 | $0 | $0 | | |
|
| 334 | | RENOVATE DIETARY UNITS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 2,243,785 | 0 | | 2,243,785 | 0 | 0 | | |
|
| | $2,243,785 | $0 | | $2,243,785 | $0 | $0 | | |
|
| 335 | | RE-ROOF AUTOMOTIVE, LAUNDRY & WALKWAYS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 208,200 | 0 | | 208,200 | 0 | 0 | | |
|
| | $208,200 | $0 | | $208,200 | $0 | $0 | | |
|
| 336 | | OUTSIDE LIGHTING | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | 318,720 | 0 | | 318,720 | 0 | 0 | | |
|
| | $318,720 | $0 | | $318,720 | $0 | $0 | | |
|
| 337 | | L, M, N, & O ELECTRICAL | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 226,500 | | 226,500 | 0 | 0 | | |
|
| | $0 | $226,500 | | $226,500 | $0 | $0 | | |
|
| 338 | | HOSPITAL SECURITY ENTRANCE, STREETS & PARKING | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 2,278,382 | | 2,278,382 | 0 | 0 | | |
|
| | $0 | $2,278,382 | | $2,278,382 | $0 | $0 | | |
|
| 339 | | REROOF 165 COMPLEX | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 197,030 | | 197,030 | 0 | 0 | | |
|
| | $0 | $197,030 | | $197,030 | $0 | $0 | | |
|
| 340 | | ADULT SERVICE CHILLERS | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 291,400 | | 291,400 | 0 | 0 | | |
|
| | $0 | $291,400 | | $291,400 | $0 | $0 | | |
|
| 341 | | SECONDARY ROAD | | | | | | ST. TAMMANY | |
|
| GENERAL OBLIGATION BONDS | | 266,520 | | 266,520 | 0 | 0 | | |
|
| | $0 | $266,520 | | $266,520 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 22 | | | | | | | | |
|
| AGENCY TOTAL | $12,007,798 | $18,823,145 | | $30,830,943 | $0 | $0 | | |
|
| AGENCY: 335 GREENWELL SPRINGS HOSPITAL | | | | | | | | | |
|
| 342 | | REPLACE FIRE ALARM SYSTEM | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 108,000 | 0 | | 108,000 | 0 | 0 | | |
|
| | $108,000 | $0 | | $108,000 | $0 | $0 | | |
|
| 343 | | REPLACE EXISTING OVERHEAD ELECTRICAL LINES WITH UNDERGROUND LINES | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 341,220 | 0 | | 341,220 | 0 | 0 | | |
|
| | $341,220 | $0 | | $341,220 | $0 | $0 | | |
|
| 344 | | REPLACE WINDOWS AND INSTALL SECURITY SCREENS AT ANNEX | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 162,000 | 0 | | 162,000 | 0 | 0 | | |
|
| | $162,000 | $0 | | $162,000 | $0 | $0 | | |
|
| 345 | | REPLACE STORM DRAIN LINES | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 120,000 | 0 | | 120,000 | 0 | 0 | | |
|
| | $120,000 | $0 | | $120,000 | $0 | $0 | | |
|
| 346 | | REPLACE ELEVATOR IN MAIN BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 112,200 | 0 | | 112,200 | 0 | 0 | | |
|
| | $112,200 | $0 | | $112,200 | $0 | $0 | | |
|
| 347 | | RECAULK AND PAINT PATIENT BUILDINGS AND REMOVE ALUMINUM AWNINGS FROM MAIN BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 116,220 | 0 | | 116,220 | 0 | 0 | | |
|
| | $116,220 | $0 | | $116,220 | $0 | $0 | | |
|
| 348 | | REPLACE WINDOWS IN MAIN BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 102,000 | 0 | | 102,000 | 0 | 0 | | |
|
| | $102,000 | $0 | | $102,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $1,061,640 | $0 | | $1,061,640 | $0 | $0 | | |
|
| AGENCY: 337 FELICIANA FORENSIC FACILITY | | | | | | | | | |
|
| 349 | | MULTI- PURPOSE BUILDING FOR ITU/ CRU COMPLEX | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 89,500 | 984,500 | | 1,074,000 | 0 | 0 | | |
|
| | $89,500 | $984,500 | | $1,074,000 | $0 | $0 | | |
|
| 350 | | MULTI- PURPOSE BUILDING FOR A S S A COMPLEX | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 89,500 | 984,500 | | 1,074,000 | 0 | 0 | | |
|
| | $89,500 | $984,500 | | $1,074,000 | $0 | $0 | | |
|
| 381 | | NEW COMPLEX- FELICIANA FORENSIC FACILITY | | | | | | EAST FELICIANA | |
|
| GENERAL OBLIGATION BONDS | 2,551,600 | 29,218,600 | | 31,770,200 | 0 | 0 | | |
|
| | $2,551,600 | $29,218,600 | | $31,770,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $2,730,600 | $31,187,600 | | $33,918,200 | $0 | $0 | | |
|
| AGENCY: 338 N.O.ADOLESCENT HOSPITAL | | | | | | | | | |
|
| 367 | | INPATIENT UNIT RENOVATIONS | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 100,000 | 225,000 | | 325,000 | 0 | 0 | | |
|
| | $100,000 | $225,000 | | $325,000 | $0 | $0 | | |
|
| 368 | | RESTROOM RENOVATIONS | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 75,000 | 140,250 | | 215,250 | 0 | 0 | | |
|
| | $75,000 | $140,250 | | $215,250 | $0 | $0 | | |
|
| 369 | | RECREATIONAL FACILITY IMPROVEMENT | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 22,500 | 247,500 | | 270,000 | 0 | 0 | | |
|
| | $22,500 | $247,500 | | $270,000 | $0 | $0 | | |
|
| 370 | | ELEVATOR IMPROVEMENT | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 15,000 | 165,000 | | 180,000 | 0 | 0 | | |
|
| | $15,000 | $165,000 | | $180,000 | $0 | $0 | | |
|
| 371 | | ELIMINATE STEAM HEATING | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 96,000 | 0 | | 96,000 | 0 | 0 | | |
|
| | $96,000 | $0 | | $96,000 | $0 | $0 | | |
|
| 372 | | CHILLER REPLACEMENT | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 20,000 | 220,000 | | 240,000 | 0 | 0 | | |
|
| | $20,000 | $220,000 | | $240,000 | $0 | $0 | | |
|
| 373 | | KITCHEN AND FREEZERS | | | | | | MULTIPLE | | 5
|
| GENERAL OBLIGATION BONDS | 20,000 | 10,000 | | 30,000 | 0 | 0 | | |
|
| | $20,000 | $10,000 | | $30,000 | $0 | $0 | | |
|
| 379 | | COMPLETE PROJECT 09-338-92B-02 JCAHO RENOVATIONS AND REPLACEMENT OF FIRE ALARM SYSTEM. | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 1,175,000 | 0 | | 1,175,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 535,000 | 0 | | |
|
| | $1,175,000 | $0 | | $1,175,000 | $535,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $1,523,500 | $1,007,750 | | $2,531,250 | $535,000 | $0 | | |
|
| AGENCY: 341 PELTIER-LAWLESS DEVELOPMEN CTR | | | | | | | | | |
|
| 322 | | ARCHIVING SYSTEM | | | | | | LAFOURCHE | |
|
| STATE GENERAL FUND (DIRECT) | 48,080 | 0 | | 48,080 | 0 | 0 | | |
|
| | $48,080 | $0 | | $48,080 | $0 | $0 | | |
|
| 323 | | ROOF REPLACEMENTS: SECOND FLOOR OF MAIN BUILDING, MAINTENANCE SHOP, MAINTENANCE SHED | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 89,932 | 0 | | 89,932 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 90,000 | 0 | | |
|
| | $89,932 | $0 | | $89,932 | $90,000 | $0 | | |
|
| 324 | | FIRE ALARM REPLACEMENT & SPRINKLER INSTALLATION | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 134,338 | 0 | | 134,338 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 205,000 | 0 | | |
|
| | $134,338 | $0 | | $134,338 | $205,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $272,350 | $0 | | $272,350 | $295,000 | $0 | | |
|
| AGENCY: 342 METROPOLITAN DEVELOPMENTAL CTR | | | | | | | | | |
|
| 352 | | REPLACE LEAKING ROOFS ON REMAINING RESIDENTIAL BUILDINGS (2), TRAINING BUILDINGS (6), AND THE MALL BUILDING (1). | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 150,000 | 0 | | 150,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 150,000 | 0 | | |
|
| | $150,000 | $0 | | $150,000 | $150,000 | $0 | | |
|
| 353 | | REPLACE DETERIORATING UNDERGROUND MAIN ELECTRICAL FEED LINE AND ELECTRICAL LOOP SYSTEM | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 250,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 415,000 | 0 | | |
|
| | $400,000 | $0 | | $400,000 | $665,000 | $0 | | |
|
| 354 | | REPLACE OBSOLETE AND DETERIORATING UNDERGROUND CABLES FOR FIRE ALARM AND TELEPHONE SYSTEM | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 240,000 | 0 | | |
|
| | $400,000 | $0 | | $400,000 | $240,000 | $0 | | |
|
| 355 | | REPLACE EXISTING OBSOLETE ELECTRICAL TRANSFORMERS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 360,000 | 0 | | |
|
| | $400,000 | $0 | | $400,000 | $360,000 | $0 | | |
|
| 356 | | REPLACE LIFT STATION PUMPS IN SEWERAGE SYSTEM. TWO OF FOUR PUMPS INOPERABLE AND BEYOND REPAIR. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 117,000 | 0 | | 117,000 | 0 | 0 | | |
|
| | $117,000 | $0 | | $117,000 | $0 | $0 | | |
|
| 357 | | REPLACE HVAC SYSTEMS (2) IN HILLSIDE COVE & CENTRAL CLINIC (MEDICALLY FRAGILE RESIDENTIAL AREAS) AND DIAGNOSTIC AND EVALUATION BUILDINGS, WHICH ARE BEYOND THEIR USEFUL LIFE. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | 203,000 | 0 | | 203,000 | 0 | 0 | | |
|
| | $203,000 | $0 | | $203,000 | $0 | $0 | | |
|
| 358 | | REPLACE HVAC SYSTEMS (20) IN CLIENT RESIDENCES, WHICH ARE BEYOND THIER USEFUL LIFE. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 566,000 | | 566,000 | 0 | 0 | | |
|
| | $0 | $566,000 | | $566,000 | $0 | $0 | | |
|
| 359 | | CONSTRUCTION \ REPAIR OF COVERED WALKWAYS | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 41,000 | | 41,000 | 0 | 0 | | |
|
| | $0 | $41,000 | | $41,000 | $0 | $0 | | |
|
| 360 | | EXTEND EXISTING STORM DRAINAGE TO ADEQUATELY DRAIN WATER FROM RESIDENTIAL HOMES AND OTHER LOW SPOTS ON CAMPUS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 250,000 | | 250,000 | 0 | 0 | | |
|
| | $0 | $250,000 | | $250,000 | $0 | $0 | | |
|
| 361 | | PURCHASE AND INSTALL GENERATORS TO PROVIDE POWER DURING EMERGENCY SITUATIONS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 21,000 | | 21,000 | 0 | 0 | | |
|
| | $0 | $21,000 | | $21,000 | $0 | $0 | | |
|
| 362 | | INSTALL ADDITIONAL EXTERIOR LIGHTING ON ALL ROADWAYS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 250,000 | | 250,000 | 0 | 0 | | |
|
| | $0 | $250,000 | | $250,000 | $0 | $0 | | |
|
| 363 | | INSTALL SECONDARY CHILL WATER PUMPS ON AC UNITS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 99,000 | | 99,000 | 0 | 0 | | |
|
| | $0 | $99,000 | | $99,000 | $0 | $0 | | |
|
| 364 | | REPAIR AND RENOVATE M D C FOR A D A COMPLIANCE. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 389,000 | | 389,000 | 0 | 0 | | |
|
| | $0 | $389,000 | | $389,000 | $0 | $0 | | |
|
| 365 | | RENOVATIONS TO FOOD SERVICES BUILDING | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 209,000 | | 209,000 | 0 | 0 | | |
|
| | $0 | $209,000 | | $209,000 | $0 | $0 | | |
|
| 425 | | FILL LARGE CAVITIES UNDER CAMPUS BUILDINGS. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 267,000 | | 267,000 | 0 | 0 | | |
|
| | $0 | $267,000 | | $267,000 | $0 | $0 | | |
|
| 426 | | RENOVATION OF WAT 2 TRAINING BUILDING. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 220,000 | | 220,000 | 0 | 0 | | |
|
| | $0 | $220,000 | | $220,000 | $0 | $0 | | |
|
| 427 | | LOCATE AND REPLACE UNDERGROUND WATER VALVES. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 132,000 | | 132,000 | 0 | 0 | | |
|
| | $0 | $132,000 | | $132,000 | $0 | $0 | | |
|
| 428 | | REPAIR AND RENOVATION OF CLIENT RESIDENCES. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 275,000 | | 275,000 | 0 | 0 | | |
|
| | $0 | $275,000 | | $275,000 | $0 | $0 | | |
|
| 429 | | SUPPLY EMERGENCY POWER TO WASTE DISPOSAL SYSTEM. | | | | | | PLAQUEMINES | |
|
| GENERAL OBLIGATION BONDS | | 146,000 | | 146,000 | 0 | 0 | | |
|
| | $0 | $146,000 | | $146,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 19 | | | | | | | | |
|
| AGENCY TOTAL | $1,670,000 | $2,865,000 | | $4,535,000 | $1,415,000 | $0 | | |
|
| AGENCY: 344 HAMMOND DEVELOPMENTAL CENTER | | | | | | | | | |
|
| 416 | | ROOF-TOP AIR CONDITIONERS REPLACEMENT & REROOFING | | | | | | TANGIPAHOA | | 2
|
| GENERAL OBLIGATION BONDS | 2,260,463 | 0 | | 2,260,463 | 0 | 0 | | |
|
| | $2,260,463 | $0 | | $2,260,463 | $0 | $0 | | |
|
| 417 | | UNDERGROUND STORAGE TANK & PUMP REPLACEMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 65,002 | 0 | | 65,002 | 0 | 0 | | |
|
| | $65,002 | $0 | | $65,002 | $0 | $0 | | |
|
| 418 | | FEASIBILITY STUDY AND RENOVATION OF LIVING UNITS AND INFIRMARY | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | 4,109,861 | 0 | | 4,109,861 | 0 | 0 | | |
|
| | $4,109,861 | $0 | | $4,109,861 | $0 | $0 | | |
|
| 419 | | REPLACEMENT OF UNDERGROUND HIGH TEMPERATURE HOT WATER SYSTEM WITH PACKAGED BOILERS | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 960,000 | 0 | | 960,000 | 0 | 0 | | |
|
| | $960,000 | $0 | | $960,000 | $0 | $0 | | |
|
| 420 | | EMERGENCY GENERATORS | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 378,000 | 0 | | 378,000 | 0 | 0 | | |
|
| | $378,000 | $0 | | $378,000 | $0 | $0 | | |
|
| 421 | | WATER WELL | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 210,000 | 0 | | 210,000 | 0 | 0 | | |
|
| | $210,000 | $0 | | $210,000 | $0 | $0 | | |
|
| 422 | | ADA COMPLIANCE | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | | 1,216,434 | | 1,216,434 | 0 | 0 | | |
|
| | $0 | $1,216,434 | | $1,216,434 | $0 | $0 | | |
|
| 423 | | ENVIRONMENTAL IMPROVEMENTS | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | | 433,351 | | 433,351 | 0 | 0 | | |
|
| | $0 | $433,351 | | $433,351 | $0 | $0 | | |
|
| 424 | | CONSTRUCTION OF COVERED WALKWAYS | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | | 1,129,673 | | 1,129,673 | 0 | 0 | | |
|
| | $0 | $1,129,673 | | $1,129,673 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 9 | | | | | | | | |
|
| AGENCY TOTAL | $7,983,326 | $2,779,458 | | $10,762,784 | $0 | $0 | | |
|
| AGENCY: 346 NORTHWEST DEVELOPMENTAL CTR | | | | | | | | | |
|
| 384 | | EMERGENCY GENERATOR REPLACEMENT, PLANNING AND CONSTRUCTION | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 315,526 | 0 | | 315,526 | 0 | 0 | | |
|
| | $315,526 | $0 | | $315,526 | $0 | $0 | | |
|
| 386 | | STEAM GENERATED DOMESTIC HOT WATER TANKS | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 170,080 | 0 | | 170,080 | 0 | 0 | | |
|
| | $170,080 | $0 | | $170,080 | $0 | $0 | | |
|
| 387 | | BUILDUP AND REROOF TWO BUILDINGS | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 128,736 | 0 | | 128,736 | 0 | 0 | | |
|
| | $128,736 | $0 | | $128,736 | $0 | $0 | | |
|
| 388 | | RENOVATION OF BATHING AND TOILETING FACILITIES | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 751,836 | 0 | | 751,836 | 0 | 0 | | |
|
| | $751,836 | $0 | | $751,836 | $0 | $0 | | |
|
| 389 | | RENOVATION OF THREE LIVING UNITS | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 1,520,671 | 0 | | 1,520,671 | 0 | 0 | | |
|
| | $1,520,671 | $0 | | $1,520,671 | $0 | $0 | | |
|
| 390 | | HAZARDOUS MATERIALS AND CHEMICAL STORAGE | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 105,186 | 0 | | 105,186 | 0 | 0 | | |
|
| | $105,186 | $0 | | $105,186 | $0 | $0 | | |
|
| 391 | | BUILDUP AND REROOF GYMNASIUM | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 62,528 | 0 | | 62,528 | 0 | 0 | | |
|
| | $62,528 | $0 | | $62,528 | $0 | $0 | | |
|
| 392 | | BUILDUP AND REROOF LOWER ROOF OF THE ACTIVITY CENTER | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 70,092 | 0 | | 70,092 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 70,000 | 0 | | |
|
| | $70,092 | $0 | | $70,092 | $70,000 | $0 | | |
|
| 393 | | BUILDUP AND REROOF RESIDENT LIVING BUILDING I | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 270,244 | 0 | | 270,244 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 260,000 | 0 | | |
|
| | $270,244 | $0 | | $270,244 | $260,000 | $0 | | |
|
| 394 | | REPAIR OF STREETS AND PARKING LOT | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 451,679 | 0 | | 451,679 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 435,000 | 0 | | |
|
| | $451,679 | $0 | | $451,679 | $435,000 | $0 | | |
|
| 397 | | REPLACEMENT OF TWO HOT WATER BOILERS | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 315,661 | 0 | | 315,661 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 395,000 | 0 | | |
|
| | $315,661 | $0 | | $315,661 | $395,000 | $0 | | |
|
| 399 | | CHILLER REPLACEMENT | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS | 706,338 | 0 | | 706,338 | 0 | 0 | | |
|
| | $706,338 | $0 | | $706,338 | $0 | $0 | | |
|
| 1642 | | REPLACEMENT OF CHILLED WATER COOLING SYSTEM | | | | | | BOSSIER | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 60,000 | 0 | | |
|
| | $0 | $0 | | $0 | $60,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 13 | | | | | | | | |
|
| AGENCY TOTAL | $4,868,577 | $0 | | $4,868,577 | $1,220,000 | $0 | | |
|
| AGENCY: 347 PINECREST DEVELOPMENTAL CENTER | | | | | | | | | |
|
| 430 | | NEW MAINTENANCE AND WAREHOUSE FACILITY | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 294,000 | 3,417,000 | | 3,711,000 | 0 | 0 | | |
|
| | $294,000 | $3,417,000 | | $3,711,000 | $0 | $0 | | |
|
| 431 | | BURIAL OF ELECTRICAL UNDERGROUND PRIMARY SYSTEM | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 350,000 | 0 | | 350,000 | 0 | 0 | | |
|
| | $350,000 | $0 | | $350,000 | $0 | $0 | | |
|
| 432 | | CLEAN & PAINT GROUND STORAGE WATER TANK | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 11,000 | 110,000 | | 121,000 | 0 | 0 | | |
|
| | $11,000 | $110,000 | | $121,000 | $0 | $0 | | |
|
| 433 | | UPGRADE PHONE LINE THROUGHOUT GROUNDS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 75,000 | 0 | | 75,000 | 0 | 0 | | |
|
| | $75,000 | $0 | | $75,000 | $0 | $0 | | |
|
| 434 | | CENTRAL KITCHEN AND DINING FACILITY | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 110,000 | 1,646,388 | | 1,756,388 | 0 | 0 | | |
|
| | $110,000 | $1,646,388 | | $1,756,388 | $0 | $0 | | |
|
| 435 | | RENOVATIONS OF WEST WING OF OLD EPILEPTIC BUILDING | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 82,000 | 902,000 | | 984,000 | 0 | 0 | | |
|
| | $82,000 | $902,000 | | $984,000 | $0 | $0 | | |
|
| 436 | | NEW MEDICAL COMPLEX WING | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 230,000 | 2,780,000 | | 3,010,000 | 0 | 0 | | |
|
| | $230,000 | $2,780,000 | | $3,010,000 | $0 | $0 | | |
|
| 437 | | EXHAUST SYSTEM FOR CARPENTER SHOP AND OCCUPATIONAL THERAPY WORKSHOP | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 60,000 | 0 | | 60,000 | 0 | 0 | | |
|
| | $60,000 | $0 | | $60,000 | $0 | $0 | | |
|
| 438 | | RESURFACING ROADS AND PAVING PARKING LOTS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 150,000 | | 150,000 | 0 | 0 | | |
|
| | $0 | $150,000 | | $150,000 | $0 | $0 | | |
|
| 439 | | BURIAL OF ELECTRICAL DISTRIBUTION SYSTEM | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 372,000 | | 372,000 | 0 | 0 | | |
|
| | $0 | $372,000 | | $372,000 | $0 | $0 | | |
|
| 440 | | RENOVATIONS TO BUILDING B | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 165,000 | 1,890,000 | | 2,055,000 | 0 | 0 | | |
|
| | $165,000 | $1,890,000 | | $2,055,000 | $0 | $0 | | |
|
| 441 | | EMERGENCY GENERATORS FOR HOMES AND MEDICAL COMPLEX | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 203,490 | 0 | | 203,490 | 0 | 0 | | |
|
| | $203,490 | $0 | | $203,490 | $0 | $0 | | |
|
| 442 | | WINDOWS FOR MEDICAL COMPLEX | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 210,000 | 0 | | 210,000 | 0 | 0 | | |
|
| | $210,000 | $0 | | $210,000 | $0 | $0 | | |
|
| 443 | | REPLACEMENT OF STREET LIGHT SYSTEM | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 185,000 | 0 | | 185,000 | 0 | 0 | | |
|
| | $185,000 | $0 | | $185,000 | $0 | $0 | | |
|
| 444 | | UPGRADE COMPUTER CABLE THROUGHOUT GROUNDS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 753,305 | 0 | | 753,305 | 0 | 0 | | |
|
| | $753,305 | $0 | | $753,305 | $0 | $0 | | |
|
| 445 | | HOSPITAL AIR CONDITIONING SYSTEM REPAIRS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 240,000 | 0 | | 240,000 | 0 | 0 | | |
|
| | $240,000 | $0 | | $240,000 | $0 | $0 | | |
|
| 446 | | REPLACEMENT OF NINE AIR CONDITIONING SYSTEMS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 125,000 | 1,375,000 | | 1,500,000 | 0 | 0 | | |
|
| | $125,000 | $1,375,000 | | $1,500,000 | $0 | $0 | | |
|
| 447 | | RENOVATIONS TO TWO DORMS AT LEESVILLE DEVELOPMENTAL CENTER | | | | | | VERNON | |
|
| GENERAL OBLIGATION BONDS | 11,000 | 110,000 | | 121,000 | 0 | 0 | | |
|
| | $11,000 | $110,000 | | $121,000 | $0 | $0 | | |
|
| 448 | | RESURFACE BATH AREA WITH NON-SKID FOR 52 HOMES AND REWORK BATH AND SHOWER AREA FOR 12 HOMES | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 300,000 | 0 | | 300,000 | 0 | 0 | | |
|
| | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| 454 | | RE-ROOFING 10 HOMES (201, 202, 203, 204, 311, 312, 111, 115, 211, 212) | | | | | | RAPIDES | | 2
|
| GENERAL OBLIGATION BONDS | 800,892 | 0 | | 800,892 | 0 | 0 | | |
|
| | $800,892 | $0 | | $800,892 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 20 | | | | | | | | |
|
| AGENCY TOTAL | $4,205,687 | $12,752,388 | | $16,958,075 | $0 | $0 | | |
|
| AGENCY: 348 RUSTON DEVELOPMENTAL CENTER | | | | | | | | | |
|
| 410 | | REPLACEMENT OF HEATING AND AIR CONDITIONING SYSTEM IN EIGHT CLIENTS' HOMES | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 390,000 | 0 | | 390,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 95,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 350,000 | 0 | | |
|
| | $390,000 | $0 | | $390,000 | $445,000 | $0 | | |
|
| 411 | | OVERLAY OF STREETS AND PARKING LOTS, PLANNING AND CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 132,000 | 0 | | 132,000 | 0 | 0 | | |
|
| | $132,000 | $0 | | $132,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $522,000 | $0 | | $522,000 | $445,000 | $0 | | |
|
| AGENCY: 349 SOUTHWEST DEVELOPMENTAL CTR | | | | | | | | | |
|
| 412 | | REPAIR WATER TANK | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 158,040 | 0 | | 158,040 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 230,000 | 0 | | |
|
| | $158,040 | $0 | | $158,040 | $230,000 | $0 | | |
|
| 413 | | REPLACEMENT - COLD GENERATOR, AIR -COOLED 20-60 TON; CHILLER, AIR-COOLED 70-125 TON SOUTHWEST LA DEVELOPMENTAL CENTER | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 73,740 | 0 | | 73,740 | 0 | 0 | | |
|
| | $73,740 | $0 | | $73,740 | $0 | $0 | | |
|
| 414 | | EXPANSION, DINING ROOM RESIDENTIAL HOMES SOUTHWEST LA DEVELOPMENTAL CENTER | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | | 212,400 | | 212,400 | 0 | 0 | | |
|
| | $0 | $212,400 | | $212,400 | $0 | $0 | | |
|
| 415 | | EXPANSION, CANTEEN SOUTHWEST LA DEVELOPMENTAL CENTER | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | | 214,200 | | 214,200 | 0 | 0 | | |
|
| | $0 | $214,200 | | $214,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $231,780 | $426,600 | | $658,380 | $230,000 | $0 | | |
|
| AGENCY: 351 OFF OF ALCOHOL AND DRUG ABUSE | | | | | | | | | |
|
| 449 | | FAMILY LIVING UNIT | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 293,499 | 0 | | 293,499 | 0 | 0 | | |
|
| | $293,499 | $0 | | $293,499 | $0 | $0 | | |
|
| 450 | | MULTI-PURPOSE BUILDING | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 928,485 | 0 | | 928,485 | 0 | 0 | | |
|
| | $928,485 | $0 | | $928,485 | $0 | $0 | | |
|
| 452 | | PATIENT DORMITORY VENTILATION UPGRADE BUILDING | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 96,000 | 0 | | 96,000 | 0 | 0 | | |
|
| | $96,000 | $0 | | $96,000 | $0 | $0 | | |
|
| 453 | | REGION 7 OUTPATIENT CENTER | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 807,198 | 0 | | 807,198 | 0 | 0 | | |
|
| | $807,198 | $0 | | $807,198 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $2,125,182 | $0 | | $2,125,182 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 171 | | | | | | | | |
|
| DEPARTMENT TOTAL | $80,320,568 | $101,559,261 | | $181,879,829 | $11,800,000 | $0 | | |
|
| 11 DEPT OF NATURAL RESOURCES | | | | | | | | | |
|
| AGENCY: 435 OFF COASTAL RESTORATION & MGMT | | | | | | | | | |
|
| 455 | | HOLLY BEACH BREAKWATERS AUGMENTATION, LENGTHEN AND ELEVATION OF 85 BREAKWATERS | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 12,000,000 | 0 | | 12,000,000 | 0 | 0 | | |
|
| | $12,000,000 | $0 | | $12,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $12,000,000 | $0 | | $12,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 1 | | | | | | | | |
|
| DEPARTMENT TOTAL | $12,000,000 | $0 | | $12,000,000 | $0 | $0 | | |
|
| 13 DEPT OF ENVIRONMENTAL QUALITY | | | | | | | | | |
|
| AGENCY: 852 OFFICE OF WATER RESOURCES | | | | | | | | | |
|
| 522 | | SAFE DRINKING WATER REVOLVING LOAN FUND STATE MATCH REQUIREMENT | | | | | | STATEWIDE | | 5
|
| STATE GENERAL FUND (DIRECT) | 4,000,000 | 8,000,000 | | 12,000,000 | 0 | 0 | | |
|
| | $4,000,000 | $8,000,000 | | $12,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $4,000,000 | $8,000,000 | | $12,000,000 | $0 | $0 | | |
|
| AGENCY: 853 OFFICE OF WASTE SERVICES | | | | | | | | | |
|
| 521 | | MUNICIPAL FACILITIES REVOLVING LOAN FUND STATE MATCH REQUIREMENT | | | | | | STATEWIDE | | 5
|
| STATE GENERAL FUND (DIRECT) | 6,622,484 | 12,000,000 | | 18,622,484 | 0 | 0 | | |
|
| | $6,622,484 | $12,000,000 | | $18,622,484 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $6,622,484 | $12,000,000 | | $18,622,484 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 2 | | | | | | | | |
|
| DEPARTMENT TOTAL | $10,622,484 | $20,000,000 | | $30,622,484 | $0 | $0 | | |
|
| 16 DEPT OF WILDLIFE & FISHERIES | | | | | | | | | |
|
| AGENCY: 512 WILDLIFE& FISHERIES OFF OF SEC | | | | | | | | | |
|
| 458 | | TUNICA HILLS OUTDOOR EDUCATION CENTER PLANNING AND CONSTRUCTION | | | | | | WEST FELICIANA | |
|
| CONSERVATION FUND | | 0 | | 0 | 199,800 | 0 | | |
|
| STATUTORY DEDICATIONS | 199,800 | 0 | | 199,800 | 0 | 0 | | |
|
| FEDERAL FUNDS | 599,400 | 0 | | 599,400 | 0 | 0 | | |
|
| | $799,200 | $0 | | $799,200 | $199,800 | $0 | | |
|
| 469 | | NEW ORLEANS OFFICE FACILITY PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 696,000 | 0 | | 696,000 | 0 | 0 | | |
|
| | $696,000 | $0 | | $696,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $1,495,200 | $0 | | $1,495,200 | $199,800 | $0 | | |
|
| AGENCY: 513 OFFICE OF WILDLIFE | | | | | | | | | |
|
| 456 | | WILDLIFE LAND ACQUISITION | | | | | | STATEWIDE | |
|
| LOUISIANA DUCK STAMP FUND | | 0 | | 0 | 350,000 | 0 | | |
|
| WILDLIFE HABITAT NATURAL HERITAGE TRUST FUND | | 0 | | 0 | 550,000 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 900,000 | 3,600,000 | | 4,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 5,500,000 | 5,000,000 | | 10,500,000 | 0 | 0 | | |
|
| | $6,400,000 | $8,600,000 | | $15,000,000 | $900,000 | $0 | | |
|
| 457 | | WILDLIFE AREA MAINTENANCE | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 3,515,000 | 0 | | 3,515,000 | 0 | 0 | | |
|
| | $3,515,000 | $0 | | $3,515,000 | $0 | $0 | | |
|
| 459 | | ROCKEFELLER REFUGE EAST LEVEE AND STRUCTURE RENOVATIONS | | | | | | MULTIPLE | |
|
| ROCKEFELLER WILDLIFE REFUGE TRUST & PROT FUND | | 0 | | 0 | 1,497,000 | 0 | | |
|
| STATUTORY DEDICATIONS | 1,497,000 | 0 | | 1,497,000 | 0 | 0 | | |
|
| | $1,497,000 | $0 | | $1,497,000 | $1,497,000 | $0 | | |
|
| 460 | | POINT AU CHENE LEVEE REFURBISHMENT | | | | | | TERREBONE | |
|
| CONSERVATION FUND | | 0 | | 0 | 500,400 | 0 | | |
|
| STATUTORY DEDICATIONS | 500,400 | 0 | | 500,400 | 0 | 0 | | |
|
| | $500,400 | $0 | | $500,400 | $500,400 | $0 | | |
|
| 461 | | EAST MARSH ISLAND MARSH MANAGEMENT PROJECTS | | | | | | IBERIA | |
|
| RUSSELL SAGE #2 | | 0 | | 0 | 600,000 | 0 | | |
|
| STATUTORY DEDICATIONS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $600,000 | $0 | | |
|
| 462 | | BATON ROUGE HEADQUARTERS WAREHOUSE & STORAGE BUILDING | | | | | | EAST BATON ROUGE | |
|
| CONSERVATION FUND | | 0 | | 0 | 540,000 | 0 | | |
|
| STATUTORY DEDICATIONS | 540,000 | 0 | | 540,000 | 0 | 0 | | |
|
| | $540,000 | $0 | | $540,000 | $540,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $13,052,400 | $8,600,000 | | $21,652,400 | $4,037,400 | $0 | | |
|
| AGENCY: 514 OFFICE OF FISHERIES | | | | | | | | | |
|
| 464 | | FISH HATCHERY ROAD AND BRIDGE REPAIR | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 1,440,000 | 0 | | 1,440,000 | 0 | 0 | | |
|
| | $1,440,000 | $0 | | $1,440,000 | $0 | $0 | | |
|
| 465 | | LAKE MARTIN ROAD AND ROOKERY ROAD HARDSURFACING | | | | | | ST. MARTIN | |
|
| GENERAL OBLIGATION BONDS | 687,040 | 0 | | 687,040 | 0 | 0 | | |
|
| | $687,040 | $0 | | $687,040 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $2,127,040 | $0 | | $2,127,040 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 10 | | | | | | | | |
|
| DEPARTMENT TOTAL | $16,674,640 | $8,600,000 | | $25,274,640 | $4,237,200 | $0 | | |
|
| 19 DEPARTMENT OF EDUCATION | | | | | | | | | |
|
| AGENCY: 312 E A CONWAY MEDICAL CENTER | | | | | | | | | |
|
| 491 | | E. A. CONWAY MEDICAL CENTER - O B / G Y N CLINIC | | | | | | OUACHITA | |
|
| REVENUE BONDS | | 2,940,500 | | 2,940,500 | 0 | 0 | | |
|
| | $0 | $2,940,500 | | $2,940,500 | $0 | $0 | | |
|
| 510 | | E. A. CONWAY MEDICAL CENTER - PRIMARY CARE BUILDING | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS | | 1,332,500 | | 1,332,500 | 0 | 0 | | |
|
| | $0 | $1,332,500 | | $1,332,500 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $4,273,000 | | $4,273,000 | $0 | $0 | | |
|
| AGENCY: 313 EARL K LONG MEDICAL CENTER | | | | | | | | | |
|
| 487 | | EARL K. LONG MEDICAL CENTER, REROOF MAIN BUILDING | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 63,375 | 697,125 | | 760,500 | 0 | 0 | | |
|
| | $63,375 | $697,125 | | $760,500 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $63,375 | $697,125 | | $760,500 | $0 | $0 | | |
|
| AGENCY: 315 UNIVERSITY MEDICAL CENTER | | | | | | | | | |
|
| 488 | | UNIVERSITY MEDICAL CENTER, WATERPROOF OUTSIDE OF BUILDING | | | | | | LAFAYETTE | | 5
|
| GENERAL OBLIGATION BONDS | 528,000 | 0 | | 528,000 | 0 | 0 | | |
|
| | $528,000 | $0 | | $528,000 | $0 | $0 | | |
|
| 490 | | UNIVERSITY MEDICAL CENTER - EXPAND NEONATAL I C U | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 712,800 | | 712,800 | 0 | 0 | | |
|
| | $0 | $712,800 | | $712,800 | $0 | $0 | | |
|
| 493 | | UNIVERSITY HOSPITAL - FAST TRACK EMERGENCY ROOM | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 465,168 | | 465,168 | 0 | 0 | | |
|
| | $0 | $465,168 | | $465,168 | $0 | $0 | | |
|
| 514 | | UNIVERSITY MEDICAL CENTER - MAINTENANCE BUILDING | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 421,978 | | 421,978 | 0 | 0 | | |
|
| | $0 | $421,978 | | $421,978 | $0 | $0 | | |
|
| 517 | | UNIVERSITY MEDICAL CENTER - WAREHOUSE AND NON- DIRECT SERVICE BUILDING | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 3,580,560 | | 3,580,560 | 0 | 0 | | |
|
| | $0 | $3,580,560 | | $3,580,560 | $0 | $0 | | |
|
| 518 | | UNIVERSITY MEDICAL CENTER - PERSONNEL / PAYROLL BUILDING | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 330,660 | | 330,660 | 0 | 0 | | |
|
| | $0 | $330,660 | | $330,660 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $528,000 | $5,511,166 | | $6,039,166 | $0 | $0 | | |
|
| AGENCY: 316 W.O. MOSS REGIONAL MEDICAL CTR | | | | | | | | | |
|
| 492 | | W. O. MOSS MEDICAL CENTER - RENOVATE EMERGENCY ROOM | | | | | | CALCASIEU | |
|
| REVENUE BONDS | | 101,414 | | 101,414 | 0 | 0 | | |
|
| | $0 | $101,414 | | $101,414 | $0 | $0 | | |
|
| 502 | | W. O. MOSS MEDICAL CENTER - RENOVATE 2ND FLOOR - WEST WING | | | | | | CALCASIEU | |
|
| REVENUE BONDS | | 660,010 | | 660,010 | 0 | 0 | | |
|
| | $0 | $660,010 | | $660,010 | $0 | $0 | | |
|
| 512 | | W. O. MOSS - ADDITIONAL PARKING AREA | | | | | | CALCASIEU | |
|
| REVENUE BONDS | | 117,975 | | 117,975 | 0 | 0 | | |
|
| | $0 | $117,975 | | $117,975 | $0 | $0 | | |
|
| 515 | | W. O. MOSS - CONSTRUCTION OF A CENTRAL WAREHOUSE | | | | | | CALCASIEU | |
|
| REVENUE BONDS | | 143,012 | | 143,012 | 0 | 0 | | |
|
| | $0 | $143,012 | | $143,012 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $1,022,411 | | $1,022,411 | $0 | $0 | | |
|
| AGENCY: 317 LALLIE KEMP REGIONAL MED CTR | | | | | | | | | |
|
| 494 | | LALLIE KEMP MEDICAL CENTER - PATIENT RESTROOM CONSTRUCTION | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 190,080 | | 190,080 | 0 | 0 | | |
|
| | $0 | $190,080 | | $190,080 | $0 | $0 | | |
|
| 496 | | LALLIE KEMP MEDICAL CENTER - MODIFY THREE INPATIENT ROOMS FOR ISOLATION | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 165,600 | | 165,600 | 0 | 0 | | |
|
| | $0 | $165,600 | | $165,600 | $0 | $0 | | |
|
| 500 | | LALLIE KEMP MEDICAL CENTER - ADDITIONAL OPERATING ROOM | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 818,000 | | 818,000 | 0 | 0 | | |
|
| | $0 | $818,000 | | $818,000 | $0 | $0 | | |
|
| 501 | | LALLIE KEMP MEDICAL CENTER - OUTPATIENT CLINIC BUILDING | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 483,737 | | 483,737 | 0 | 0 | | |
|
| | $0 | $483,737 | | $483,737 | $0 | $0 | | |
|
| 509 | | LALLIE KEMP - BUILD MEDICAL RECORDS BUILDING | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 590,800 | | 590,800 | 0 | 0 | | |
|
| | $0 | $590,800 | | $590,800 | $0 | $0 | | |
|
| 516 | | LALLIE KEMP MEDICAL CENTER - NEW OFFICE AND WAREHOUSE BUILDING | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | | 678,480 | | 678,480 | 0 | 0 | | |
|
| | $0 | $678,480 | | $678,480 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $2,926,697 | | $2,926,697 | $0 | $0 | | |
|
| AGENCY: 318 WASH-ST TAMMANY REG MED CENTER | | | | | | | | | |
|
| 503 | | WASHINGTON - ST. TAMMANY MEDICAL CENTER - REPLACE STEAM TRANSPORT SYSTEM | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 446,511 | | 446,511 | 0 | 0 | | |
|
| | $0 | $446,511 | | $446,511 | $0 | $0 | | |
|
| 519 | | WASHINGTON- ST. TAMANY MEDICAL CENTER, PRIMARY CARE CENTER | | | | | | WASHINGTON | | 5
|
| REVENUE BONDS | 556,736 | 4,973,092 | | 5,529,828 | 0 | 0 | | |
|
| | $556,736 | $4,973,092 | | $5,529,828 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $556,736 | $5,419,603 | | $5,976,339 | $0 | $0 | | |
|
| AGENCY: 321 LEONARD J CHABERT MEDICAL CNTR | | | | | | | | | |
|
| 489 | | LEONARD J. CHABERT MEDICAL CENTER CONSTRUCT NEW WAREHOUSE AND LAND ACQUISITION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 300,800 | 690,000 | | 990,800 | 0 | 0 | | |
|
| | $300,800 | $690,000 | | $990,800 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $300,800 | $690,000 | | $990,800 | $0 | $0 | | |
|
| AGENCY: 322 CHARITY HOSP & MED CTR OF LA | | | | | | | | | |
|
| 484 | | M C L N O - CRITICAL CARE TOWER | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 6,000,000 | 84,000,000 | | 90,000,000 | 0 | 0 | | |
|
| | $6,000,000 | $84,000,000 | | $90,000,000 | $0 | $0 | | |
|
| 485 | | M C L N O- SPRINKLER SYSTEM ( M C L N O BUILDING) | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 9,000,000 | 0 | | 9,000,000 | 0 | 0 | | |
|
| | $9,000,000 | $0 | | $9,000,000 | $0 | $0 | | |
|
| 486 | | M C L N O - SPRINKLER SYSTEM ( UNIVERSITY HOSPITAL) | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 1,080,000 | 0 | | 1,080,000 | 0 | 0 | | |
|
| | $1,080,000 | $0 | | $1,080,000 | $0 | $0 | | |
|
| 495 | | M C L N O - STAIRWELL PRESSURIZATION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 118,800 | | 118,800 | 0 | 0 | | |
|
| | $0 | $118,800 | | $118,800 | $0 | $0 | | |
|
| 497 | | M C L N O - A D A COMPLIANCE IN UNIVERSITY HOSPITAL | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 780,000 | | 780,000 | 0 | 0 | | |
|
| | $0 | $780,000 | | $780,000 | $0 | $0 | | |
|
| 498 | | M C L N O - A D A COMPLIANCE IN MEDICAL OFFICE BUILDING | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 270,600 | | 270,600 | 0 | 0 | | |
|
| | $0 | $270,600 | | $270,600 | $0 | $0 | | |
|
| 499 | | M C L N O - A D A COMPLIANCE IN MAIN BUILDING | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 4,200,000 | | 4,200,000 | 0 | 0 | | |
|
| | $0 | $4,200,000 | | $4,200,000 | $0 | $0 | | |
|
| 504 | | M C L N O - CENTRAL A / C IN THE BUTTERWORTH BUILDING | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 300,000 | | 300,000 | 0 | 0 | | |
|
| | $0 | $300,000 | | $300,000 | $0 | $0 | | |
|
| 505 | | M C L N O - COOLING TOWER | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 361,200 | | 361,200 | 0 | 0 | | |
|
| | $0 | $361,200 | | $361,200 | $0 | $0 | | |
|
| 506 | | M C L N O - FIRE ARLAM SYSTEM | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 4,500,000 | | 4,500,000 | 0 | 0 | | |
|
| | $0 | $4,500,000 | | $4,500,000 | $0 | $0 | | |
|
| 507 | | UNIVERSITY MEDICAL CENTER - ELEVATOR | | | | | | LAFAYETTE | |
|
| REVENUE BONDS | | 137,500 | | 137,500 | 0 | 0 | | |
|
| | $0 | $137,500 | | $137,500 | $0 | $0 | | |
|
| 508 | | M C L N O - LABORATORY RENOVATION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 900,000 | | 900,000 | 0 | 0 | | |
|
| | $0 | $900,000 | | $900,000 | $0 | $0 | | |
|
| 511 | | M C L N O - MEDICAL OFFICE BUILDING RENOVATION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 780,000 | | 780,000 | 0 | 0 | | |
|
| | $0 | $780,000 | | $780,000 | $0 | $0 | | |
|
| 513 | | M C L N O - WATERPROOF OUTSIDE AND WINDOW REPLACEMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 7,200,000 | | 7,200,000 | 0 | 0 | | |
|
| | $0 | $7,200,000 | | $7,200,000 | $0 | $0 | | |
|
| 520 | | STANLEY S. SCOTT CANCER TREATMENT AND RESEARCH CENTER | | | | | | ORLEANS | |
|
| FEES AND SELF GENERATED REVENUES | | 17,573,187 | | 17,573,187 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,597,562 | 10,000,000 | | 11,597,562 | 0 | 0 | | |
|
| | $1,597,562 | $27,573,187 | | $29,170,749 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 15 | | | | | | | | |
|
| AGENCY TOTAL | $17,677,562 | $131,121,287 | | $148,798,849 | $0 | $0 | | |
|
| AGENCY: 600 LSU BOARD OF SUPERVISORS | | | | | | | | | |
|
| 710 | | MAJOR REPAIRS AND REROOFING OF CAMPUS BUILDINGS | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 250,000 | 0 | | 250,000 | 0 | 0 | | |
|
| | $250,000 | $0 | | $250,000 | $0 | $0 | | |
|
| 711 | | ADA | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 20,400 | 0 | | 20,400 | 0 | 0 | | |
|
| | $20,400 | $0 | | $20,400 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $270,400 | $0 | | $270,400 | $0 | $0 | | |
|
| AGENCY: 601 LSU BATON ROUGE | | | | | | | | | |
|
| 637 | | RENOVATION AND EXPANSION OF MUSIC AND DRAMATIC ARTS BUILDING | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 849,550 | 10,438,600 | | 11,288,150 | 0 | 0 | | |
|
| | $849,550 | $10,438,600 | | $11,288,150 | $0 | $0 | | |
|
| 638 | | ENGINEERING RENOVATION AND EXPANSION | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 900,000 | 10,800,000 | | 11,700,000 | 0 | 0 | | |
|
| | $900,000 | $10,800,000 | | $11,700,000 | $0 | $0 | | |
|
| 674 | | MASS COMMUNICATION BUILDING RENOVATION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 2,646,400 | | 2,646,400 | 0 | 0 | | |
|
| | $0 | $2,646,400 | | $2,646,400 | $0 | $0 | | |
|
| 712 | | MAJOR REPAIRS AND REROOFING OF CAMPUS BUILDINGS | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 12,102,000 | 48,408,000 | | 60,510,000 | 0 | 0 | | |
|
| | $12,102,000 | $48,408,000 | | $60,510,000 | $0 | $0 | | |
|
| 713 | | AMERICANS WITH DISABILITIES ACT COMPLIANCE WORK | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 5,534,400 | 0 | | 5,534,400 | 0 | 0 | | |
|
| | $5,534,400 | $0 | | $5,534,400 | $0 | $0 | | |
|
| 714 | | FIRE MARSHAL CITATION CODE COMPLIANCE | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 15,066,000 | 0 | | 15,066,000 | 0 | 0 | | |
|
| | $15,066,000 | $0 | | $15,066,000 | $0 | $0 | | |
|
| 754 | | LIFE SCIENCES ANNEX | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 2,100,000 | 0 | | 2,100,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,605,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 7,210,000 | 0 | | |
|
| | $2,100,000 | $0 | | $2,100,000 | $10,815,000 | $0 | | |
|
| 755 | | NICHOLSON HALL RENOVATION AND EXPANSION, CONSTRUCTION AND EQUIPMENT | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 900,000 | 0 | | 900,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 8,370,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,580,000 | 0 | | |
|
| | $900,000 | $0 | | $900,000 | $13,950,000 | $0 | | |
|
| 756 | | RENOVATION OF HODGES DORM FOR ACADEMIC USE, CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 275,000 | 0 | | 275,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,025,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,400,000 | 0 | | |
|
| | $275,000 | $0 | | $275,000 | $5,425,000 | $0 | | |
|
| 770 | | KIRBY SMITH ELEVATOR | | | | | | EAST BATON ROUGE | |
|
| REVENUE BONDS | 1,950,000 | 0 | | 1,950,000 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 2,046,000 | 0 | | |
|
| | $1,950,000 | $0 | | $1,950,000 | $2,046,000 | $0 | | |
|
| 771 | | PARKING GARAGE | | | | | | EAST BATON ROUGE | |
|
| REVENUE BONDS | 1,900,000 | 7,700,000 | | 9,600,000 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 9,600,000 | 0 | | |
|
| | $1,900,000 | $7,700,000 | | $9,600,000 | $9,600,000 | $0 | | |
|
| 788 | | CHILD CARE CENTER | | | | | | EAST BATON ROUGE | |
|
| REVENUE BONDS | 2,717,000 | 0 | | 2,717,000 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 2,720,000 | 0 | | |
|
| | $2,717,000 | $0 | | $2,717,000 | $2,720,000 | $0 | | |
|
| 791 | | WETLANDS RESOURCES/ENVIRONMENTAL SCIENCES FACILITY | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 6,105,000 | 0 | | 6,105,000 | 0 | 0 | | |
|
| | $6,105,000 | $0 | | $6,105,000 | $0 | $0 | | |
|
| 1643 | | RENOVATION OF LIVESTOCK JUDGING PAVILLION FOR THEATRICAL, MULTI-PURPOSE USE, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 900,000 | 0 | | |
|
| | $0 | $0 | | $0 | $900,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 14 | | | | | | | | |
|
| AGENCY TOTAL | $50,398,950 | $79,993,000 | | $130,391,950 | $45,456,000 | $0 | | |
|
| AGENCY: 602 LSU ALEXANDRIA | | | | | | | | | |
|
| 639 | | REPAIR AND UPGRADE CENTRAL UTILITIES SYSTEM | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 295,851 | 3,254,361 | | 3,550,212 | 0 | 0 | | |
|
| | $295,851 | $3,254,361 | | $3,550,212 | $0 | $0 | | |
|
| 640 | | SCIENCE BUILDING RENOVATION | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 216,000 | 2,376,000 | | 2,592,000 | 0 | 0 | | |
|
| | $216,000 | $2,376,000 | | $2,592,000 | $0 | $0 | | |
|
| 675 | | OAKLAND HALL RENOVATIONS | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | | 2,018,578 | | 2,018,578 | 0 | 0 | | |
|
| | $0 | $2,018,578 | | $2,018,578 | $0 | $0 | | |
|
| 715 | | MAJOR REPAIRS | | | | | | RAPIDES | | 5
|
| GENERAL OBLIGATION BONDS | 805,800 | 0 | | 805,800 | 0 | 0 | | |
|
| | $805,800 | $0 | | $805,800 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $1,317,651 | $7,648,939 | | $8,966,590 | $0 | $0 | | |
|
| AGENCY: 603 UNIV OF NEW ORLEANS | | | | | | | | | |
|
| 646 | | LIBRARY FOURTH FLOOR COMPLETION AND UTILITY REPAIRS | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 273,000 | 3,483,000 | | 3,756,000 | 0 | 0 | | |
|
| | $273,000 | $3,483,000 | | $3,756,000 | $0 | $0 | | |
|
| 679 | | CAMPUS SAFETY, SECURITY, AND WAREHOUSE | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 2,968,000 | | 2,968,000 | 0 | 0 | | |
|
| | $0 | $2,968,000 | | $2,968,000 | $0 | $0 | | |
|
| 680 | | MAIN CAMPUS POWER/TELECOMMUNICATIONS BACKBONE AND FIRE ALARM SYSTEM UPGRADE | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 3,000,000 | | 3,000,000 | 0 | 0 | | |
|
| | $0 | $3,000,000 | | $3,000,000 | $0 | $0 | | |
|
| 726 | | MAJOR REPAIRS AND REROOFING | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,894,000 | 5,775,669 | | 7,669,669 | 0 | 0 | | |
|
| | $1,894,000 | $5,775,669 | | $7,669,669 | $0 | $0 | | |
|
| 727 | | AMERICANS WITH DISABILITIES ACT ALTERATIONS | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | | 10,500,000 | | 10,500,000 | 0 | 0 | | |
|
| | $0 | $10,500,000 | | $10,500,000 | $0 | $0 | | |
|
| 728 | | LIFE SAFETY CITATIONS | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,149,600 | 0 | | 1,149,600 | 0 | 0 | | |
|
| | $1,149,600 | $0 | | $1,149,600 | $0 | $0 | | |
|
| 758 | | CENTER FOR ENERGY RESOURCES MANAGEMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 2,250,000 | 0 | | 2,250,000 | 0 | 0 | | |
|
| | $2,250,000 | $0 | | $2,250,000 | $0 | $0 | | |
|
| 773 | | EAST CAMPUS PARKING LOB - PHASE 2 | | | | | | ORLEANS | | 5
|
| REVENUE BONDS | | 500,400 | | 500,400 | 0 | 0 | | |
|
| | $0 | $500,400 | | $500,400 | $0 | $0 | | |
|
| 774 | | MAIN CAMPUS PARKING GARAGE | | | | | | ORLEANS | | 5
|
| REVENUE BONDS | | 4,154,000 | | 4,154,000 | 0 | 0 | | |
|
| | $0 | $4,154,000 | | $4,154,000 | $0 | $0 | | |
|
| 795 | | BUSINESS ADMINISTRATION BUILDING | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 7,870,000 | 8,100,000 | | 15,970,000 | 0 | 0 | | |
|
| | $7,870,000 | $8,100,000 | | $15,970,000 | $0 | $0 | | |
|
| 1382 | | OGDEN MUSEUM OF SOUTHERN ART, ACQUISITION, PLANNING AND CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 5,500,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,000,000 | 0 | | |
|
| | $0 | $0 | | $0 | $6,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 11 | | | | | | | | |
|
| AGENCY TOTAL | $13,436,600 | $38,481,069 | | $51,917,669 | $6,500,000 | $0 | | |
|
| AGENCY: 604 LSU MEDICAL CENTER NEW ORLEANS | | | | | | | | | |
|
| 641 | | DENTAL CLINIC SUITES EQUIPMENT | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 3,333,686 | 0 | | 3,333,686 | 0 | 0 | | |
|
| | $3,333,686 | $0 | | $3,333,686 | $0 | $0 | | |
|
| 642 | | LAND ACQUISITION AT LSUMCNO | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,700,000 | 0 | | 1,700,000 | 0 | 0 | | |
|
| | $1,700,000 | $0 | | $1,700,000 | $0 | $0 | | |
|
| 716 | | HUMAN DEVELOPMENT CENTER | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 1,012,622 | 12,371,392 | | 13,384,014 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 1,015,000 | 0 | | |
|
| | $1,012,622 | $12,371,392 | | $13,384,014 | $1,015,000 | $0 | | |
|
| 717 | | LIFE SAFETY CODE VIOLATIONS | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,414,440 | 0 | | 1,414,440 | 0 | 0 | | |
|
| | $1,414,440 | $0 | | $1,414,440 | $0 | $0 | | |
|
| 718 | | AMERICANS WITH DISABILITIES ACT COMPLIANCE | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,055,756 | 4,223,020 | | 5,278,776 | 0 | 0 | | |
|
| | $1,055,756 | $4,223,020 | | $5,278,776 | $0 | $0 | | |
|
| 719 | | MAJOR REPAIRS, LSUMCNO | | | | | | ORLEANS | | 5
|
| GENERAL OBLIGATION BONDS | 1,789,600 | 3,579,200 | | 5,368,800 | 0 | 0 | | |
|
| | $1,789,600 | $3,579,200 | | $5,368,800 | $0 | $0 | | |
|
| 772 | | RENOVATION OF OLD CHARITY NURSING BUILDING | | | | | | ORLEANS | |
|
| REVENUE BONDS | 11,620,956 | 0 | | 11,620,956 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 11,620,956 | 0 | | |
|
| | $11,620,956 | $0 | | $11,620,956 | $11,620,956 | $0 | | |
|
| 1383 | | CLINICAL SCIENCES BUILDING, CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 13,540,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 8,100,000 | 0 | | |
|
| | $0 | $0 | | $0 | $21,640,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $21,927,060 | $20,173,612 | | $42,100,672 | $34,275,956 | $0 | | |
|
| AGENCY: 604 LSU MEDICAL CENTER SHREVEPORT | | | | | | | | | |
|
| 643 | | CHILLED WATER DISTRIBUTION LOOP | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 355,000 | 3,905,000 | | 4,260,000 | 0 | 0 | | |
|
| | $355,000 | $3,905,000 | | $4,260,000 | $0 | $0 | | |
|
| 644 | | INTERVENTIONAL RADIOLOGY EXPANSION | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 200,280 | 6,513,080 | | 6,713,360 | 0 | 0 | | |
|
| | $200,280 | $6,513,080 | | $6,713,360 | $0 | $0 | | |
|
| 676 | | INDOOR AIR QUALITY MODIFICATIONS IN HOSPITAL AND MEDICAL SCHOOL | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 3,878,000 | | 3,878,000 | 0 | 0 | | |
|
| | $0 | $3,878,000 | | $3,878,000 | $0 | $0 | | |
|
| 677 | | PROPERTY ACQUISITION | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 9,000,000 | | 9,000,000 | 0 | 0 | | |
|
| | $0 | $9,000,000 | | $9,000,000 | $0 | $0 | | |
|
| 678 | | CHILDREN'S CENTER | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | | 1,350,000 | | 1,350,000 | 0 | 0 | | |
|
| | $0 | $1,350,000 | | $1,350,000 | $0 | $0 | | |
|
| 720 | | ADA MODIFICATIONS | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 1,098,000 | 0 | | 1,098,000 | 0 | 0 | | |
|
| | $1,098,000 | $0 | | $1,098,000 | $0 | $0 | | |
|
| 721 | | MAJOR REPAIRS | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 1,791,000 | 4,293,000 | | 6,084,000 | 0 | 0 | | |
|
| | $1,791,000 | $4,293,000 | | $6,084,000 | $0 | $0 | | |
|
| 722 | | LIFE SAFETY | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $0 | $0 | | |
|
| 792 | | AMBULATORY CARE BUILDING | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 7,633,704 | 13,200,000 | | 20,833,704 | 0 | 0 | | |
|
| | $7,633,704 | $13,200,000 | | $20,833,704 | $0 | $0 | | |
|
| 1384 | | FIRE ALARM REPLACEMENT AND LIFE SAFETY MODIFICATIONS - HOSPITAL AND MEDICAL SCHOOL, PLANNING AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 690,000 | 0 | | |
|
| | $0 | $0 | | $0 | $690,000 | $0 | | |
|
| 1385 | | INFECTION CONTROL AIR HANDLING, HOSPITAL AND CLINICS, PLANNING AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 740,000 | 0 | | |
|
| | $0 | $0 | | $0 | $740,000 | $0 | | |
|
| 1386 | | ALLIED HEALTH FACILITY, CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 490,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,375,000 | 0 | | |
|
| | $0 | $0 | | $0 | $5,865,000 | $0 | | |
|
| 1387 | | REGIONAL CANCER CENTER, PLANNING AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,510,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 6,490,000 | 0 | | |
|
| | $0 | $0 | | $0 | $8,000,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 13 | | | | | | | | |
|
| AGENCY TOTAL | $11,677,984 | $42,139,080 | | $53,817,064 | $15,295,000 | $0 | | |
|
| AGENCY: 605 LSU EUNICE | | | | | | | | | |
|
| 648 | | SITE DEVELOPMENT, DRAINAGE, AND PARKING | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 528,000 | 0 | | 528,000 | 0 | 0 | | |
|
| | $528,000 | $0 | | $528,000 | $0 | $0 | | |
|
| 732 | | ADA | | | | | | ACADIA | | 5
|
| GENERAL OBLIGATION BONDS | 314,400 | 0 | | 314,400 | 0 | 0 | | |
|
| | $314,400 | $0 | | $314,400 | $0 | $0 | | |
|
| 733 | | MAJOR REPAIRS | | | | | | ACADIA | | 5
|
| GENERAL OBLIGATION BONDS | 2,631,600 | 0 | | 2,631,600 | 0 | 0 | | |
|
| | $2,631,600 | $0 | | $2,631,600 | $0 | $0 | | |
|
| 734 | | LIFE SAFETY CODE CITATIONS | | | | | | ACADIA | | 5
|
| GENERAL OBLIGATION BONDS | 5,185,200 | 0 | | 5,185,200 | 0 | 0 | | |
|
| | $5,185,200 | $0 | | $5,185,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $8,659,200 | $0 | | $8,659,200 | $0 | $0 | | |
|
| AGENCY: 606 LSU SHREVEPORT | | | | | | | | | |
|
| 647 | | LAND AND BUILDING ACQUISITION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $0 | $0 | | |
|
| 681 | | CIVIC LEARNING CENTER/CONFERENCE CENTER | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | | 12,687,750 | | 12,687,750 | 0 | 0 | | |
|
| | $0 | $12,687,750 | | $12,687,750 | $0 | $0 | | |
|
| 730 | | ADA | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 1,219,000 | 0 | | 1,219,000 | 0 | 0 | | |
|
| | $1,219,000 | $0 | | $1,219,000 | $0 | $0 | | |
|
| 731 | | MAJOR REPAIRS | | | | | | CADDO | | 5
|
| GENERAL OBLIGATION BONDS | 744,000 | 0 | | 744,000 | 0 | 0 | | |
|
| | $744,000 | $0 | | $744,000 | $0 | $0 | | |
|
| 775 | | LIBRARY PARKING LOT | | | | | | CADDO | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 420,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 420,000 | 0 | | 420,000 | 0 | 0 | | |
|
| | $420,000 | $0 | | $420,000 | $420,000 | $0 | | |
|
| 1388 | | OLD LIBRARY RENOVATION, PLANNING AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 455,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 250,000 | 0 | | |
|
| | $0 | $0 | | $0 | $705,000 | $0 | | |
|
| 1644 | | SCIENCE BUILDING RENOVATION, CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 135,000 | 0 | | |
|
| | $0 | $0 | | $0 | $135,000 | $0 | | |
|
| 1645 | | REPLACE EXTERIOR PRECAST PANELS - HEALTH AND PHYSUICAL EDUCATION BUILDING, PLANNING AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 440,000 | 0 | | |
|
| | $0 | $0 | | $0 | $440,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $2,983,000 | $12,687,750 | | $15,670,750 | $1,700,000 | $0 | | |
|
| AGENCY: 607 LSU AGRICULTURAL CENTER | | | | | | | | | |
|
| 645 | | ANIMAL INDUSTRIES FACILITY | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 2,117,120 | 25,788,320 | | 27,905,440 | 0 | 0 | | |
|
| | $2,117,120 | $25,788,320 | | $27,905,440 | $0 | $0 | | |
|
| 723 | | ADA COMPLIANCE RENOVATIONS | | | | | | STATEWIDE | | 5
|
| GENERAL OBLIGATION BONDS | 1,980,000 | 0 | | 1,980,000 | 0 | 0 | | |
|
| | $1,980,000 | $0 | | $1,980,000 | $0 | $0 | | |
|
| 724 | | MAJOR REPAIRS AND REROOFING | | | | | | STATEWIDE | | 5
|
| GENERAL OBLIGATION BONDS | 1,759,200 | 6,600,000 | | 8,359,200 | 0 | 0 | | |
|
| | $1,759,200 | $6,600,000 | | $8,359,200 | $0 | $0 | | |
|
| 1585 | | DAIRY RESEARCH FACILITIES IN FRANKLINTON (48% SG GRANT) | | | | | | EAST BATON ROUGE | | 10
|
| GENERAL OBLIGATION BONDS | 740,000 | 0 | | 740,000 | 0 | 0 | | |
|
| | $740,000 | $0 | | $740,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $6,596,320 | $32,388,320 | | $38,984,640 | $0 | $0 | | |
|
| AGENCY: 608 PAUL M. HEBERT LAW CENTER | | | | | | | | | |
|
| 725 | | MAJOR REPAIRS | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 423,000 | 0 | | 423,000 | 0 | 0 | | |
|
| | $423,000 | $0 | | $423,000 | $0 | $0 | | |
|
| 757 | | LAW CENTER LIBRARY / OLD LAW BUILDING RENOVATION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 174,595 | 0 | | 174,595 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,045,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 2,040,000 | 0 | | |
|
| | $174,595 | $0 | | $174,595 | $4,085,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $597,595 | $0 | | $597,595 | $4,085,000 | $0 | | |
|
| AGENCY: 609 PENNINGTON BIOMED RESEARCH CTR | | | | | | | | | |
|
| 729 | | MAJOR REPAIRS | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 301,200 | 0 | | 301,200 | 0 | 0 | | |
|
| | $301,200 | $0 | | $301,200 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $301,200 | $0 | | $301,200 | $0 | $0 | | |
|
| AGENCY: 615 SOUTHERN UNIV-BD OF SUPERVISOR | | | | | | | | | |
|
| 743 | | MAJOR REPAIRS AND REROOFING FOR CAMPUS BUILDINGS (PLANNING AND CONSTRUCTION) | | | | | | MULTIPLE | |
|
| STATE GENERAL FUND (DIRECT) | 2,620,000 | 2,620,000 | | 5,240,000 | 0 | 0 | | |
|
| | $2,620,000 | $2,620,000 | | $5,240,000 | $0 | $0 | | |
|
| 752 | | LIFE SAFETY CODE & A D A COMPLIANCE (PLANNING AND CONSTRUCTION) | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 5,227,310 | 0 | | 5,227,310 | 0 | 0 | | |
|
| | $5,227,310 | $0 | | $5,227,310 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $7,847,310 | $2,620,000 | | $10,467,310 | $0 | $0 | | |
|
| AGENCY: 616 SOUTHERN UNIVERSITY BATONROUGE | | | | | | | | | |
|
| 670 | | RENOVATION OF DORMS, PHASE 3, JONES & BOLEY HALL (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 11,055,000 | | 11,055,000 | 0 | 0 | | |
|
| | $0 | $11,055,000 | | $11,055,000 | $0 | $0 | | |
|
| 671 | | LAND ACQUISITION (PLANNING) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 1,000,000 | | 2,000,000 | 0 | 0 | | |
|
| | $1,000,000 | $1,000,000 | | $2,000,000 | $0 | $0 | | |
|
| 693 | | NEW PARKING GARAGE (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| REVENUE BONDS | | 3,900,000 | | 3,900,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 3,900,000 | | 3,900,000 | 0 | 0 | | |
|
| | $0 | $7,800,000 | | $7,800,000 | $0 | $0 | | |
|
| 703 | | NEW CIVIL AND MECHANICAL ENGINEERING BUILDING (EQUIPMENT) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 1,306,185 | 0 | | 1,306,185 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,090,000 | 0 | | |
|
| | $1,306,185 | $0 | | $1,306,185 | $4,090,000 | $0 | | |
|
| 704 | | CENTER FOR SMALL FARMS RESEARCH PARTS 1 AND 2, EQUIPMENT (CONSTRUCTION SUPPLEMENT AND EQUIPMENT) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 435,395 | 0 | | 435,395 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 435,000 | 0 | | |
|
| | $435,395 | $0 | | $435,395 | $435,000 | $0 | | |
|
| 706 | | SITE IMPROVEMENT, IMPLEMENTATION OF MASTER PLAN (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 1,088,488 | 1,088,488 | | 2,176,976 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,090,000 | 0 | | |
|
| | $1,088,488 | $1,088,488 | | $2,176,976 | $1,090,000 | $0 | | |
|
| 707 | | REPLACEMENT OF DORMS, PHASE 2 (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 110,000 | 0 | | 110,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,450,000 | 0 | | |
|
| | $110,000 | $0 | | $110,000 | $1,450,000 | $0 | | |
|
| 768 | | RENOVATION OF DORMS, PHASE 3, JONES & BOLEY HALL (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 11,055,000 | | 11,055,000 | 0 | 0 | | |
|
| | $0 | $11,055,000 | | $11,055,000 | $0 | $0 | | |
|
| 807 | | RENOVATION AND ADDITION TO A W MUMFORD STADIUM (PLANNING AND CONSTRUCTION) | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 3,355,000 | 1,145,000 | | 4,500,000 | 0 | 0 | | |
|
| | $3,355,000 | $1,145,000 | | $4,500,000 | $0 | $0 | | |
|
| 1389 | | NAVAL ROTC BUILDING RENOVATION, CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 440,000 | 0 | | |
|
| | $0 | $0 | | $0 | $440,000 | $0 | | |
|
| 1582 | | PLANNING AND CONSTRUCTION FOR MAJOR REPAIRS TO F.G. CLARK ACTIVITY CENTER | | | | | | EAST BATON ROUGE | | 10
|
| GENERAL OBLIGATION BONDS | 4,555,000 | 0 | | 4,555,000 | 0 | 0 | | |
|
| | $4,555,000 | $0 | | $4,555,000 | $0 | $0 | | |
|
| 1586 | | F.G. CLARK ACTIVITY CENTER MAJOR REPAIRS, CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 2,300,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 2,255,000 | 0 | | |
|
| | $0 | $0 | | $0 | $4,555,000 | $0 | | |
|
| 1646 | | RENOVATION OF INDUSTRIAL ARTS / ROTC BUILDING, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 960,000 | 0 | | |
|
| | $0 | $0 | | $0 | $960,000 | $0 | | |
|
| 1647 | | T. H. HARRIS HALL RENOVATION, PLANNING AND COSNTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,365,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,365,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 14 | | | | | | | | |
|
| AGENCY TOTAL | $11,850,068 | $33,143,488 | | $44,993,556 | $15,385,000 | $0 | | |
|
| AGENCY: 617 SOUTHERN UNIV NEW ORLEANS | | | | | | | | | |
|
| 669 | | RENOVATION OF TWO (2) EXISTING BUILDINGS FOR COLLEGE OF BUSINESS AND SCHOOL OF SOCIAL WORK (PLANNING AND CONSTRUCTION) | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 385,183 | 2,957,013 | | 3,342,196 | 0 | 0 | | |
|
| | $385,183 | $2,957,013 | | $3,342,196 | $0 | $0 | | |
|
| 672 | | NEW PARKING GARAGE (PLANNING AND CONSTRUCTION) | | | | | | ORLEANS | |
|
| REVENUE BONDS | | 2,700,000 | | 2,700,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 450,000 | 2,250,000 | | 2,700,000 | 0 | 0 | | |
|
| | $450,000 | $4,950,000 | | $5,400,000 | $0 | $0 | | |
|
| 695 | | RENOVATION OF PHYSICAL EDUCATION BUILDING (PLANNING AND CONSTRUCTION) | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 2,420,000 | | 2,420,000 | 0 | 0 | | |
|
| | $0 | $2,420,000 | | $2,420,000 | $0 | $0 | | |
|
| 1420 | | ADMINISTRATION, NEW SCIENCE, AND EDUCATION BUILDINGS, RENOVATION, CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,385,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,385,000 | $0 | | |
|
| 1584 | | RENOVATION OF ADMINISTRATION, NEW SCIENCE, AND EDUCATION BUILDINGS | | | | | | ORLEANS | | 10
|
| GENERAL OBLIGATION BONDS | 1,382,378 | 0 | | 1,382,378 | 0 | 0 | | |
|
| | $1,382,378 | $0 | | $1,382,378 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $2,217,561 | $10,327,013 | | $12,544,574 | $1,385,000 | $0 | | |
|
| AGENCY: 618 SOUTHERN UNIV SHREVEPORT | | | | | | | | | |
|
| 673 | | SITE IMPROVEMENTS, DRAINAGE AND SITE LIGHTING (PLANNING AND CONSTRUCTION) | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS | 750,000 | 750,000 | | 1,500,000 | 0 | 0 | | |
|
| | $750,000 | $750,000 | | $1,500,000 | $0 | $0 | | |
|
| 1583 | | ADMINISTRATION BUILDING LOBBY REPAIRS ADN RENOVATIONS | | | | | | CADDO | | 10
|
| GENERAL OBLIGATION BONDS | 1,590,000 | 0 | | 1,590,000 | 0 | 0 | | |
|
| | $1,590,000 | $0 | | $1,590,000 | $0 | $0 | | |
|
| 1587 | | ADMINISTRATRION BUILDING LOBBY REPAIRS AND RENOVATIONS, CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 1,590,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,590,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $2,340,000 | $750,000 | | $3,090,000 | $1,590,000 | $0 | | |
|
| AGENCY: 620 UNIV OF LA BOARD OF TRUSTEES | | | | | | | | | |
|
| 735 | | MAJOR REPAIRS AND REROOFING TO CAMPUS BUILDINGS FOR THE UNIVERSITY OF LOUISIANA SYSTEM, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 11,400,000 | 0 | | 11,400,000 | 0 | 0 | | |
|
| | $11,400,000 | $0 | | $11,400,000 | $0 | $0 | | |
|
| 776 | | LAND AQUISTION FOR THE U OF LA SYSTEM UNIVERSITY OF LOUISIANA SYSTEM WIDE, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 5,000,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 5,000,000 | 0 | | 5,000,000 | 0 | 0 | | |
|
| | $5,000,000 | $0 | | $5,000,000 | $5,000,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $16,400,000 | $0 | | $16,400,000 | $5,000,000 | $0 | | |
|
| AGENCY: 621 NICHOLLS STATE UNIVERSITY | | | | | | | | | |
|
| 653 | | BEAUREGARD HALL RENOVATIONS, PLANNING, CONSTRUCTION, FURNITURE AND EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 505,000 | 6,195,000 | | 6,700,000 | 0 | 0 | | |
|
| | $505,000 | $6,195,000 | | $6,700,000 | $0 | $0 | | |
|
| 654 | | ASSEMBLY CENTER COMPLEX, NEW CONSTRUCTION, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 1,370,000 | 31,830,000 | | 33,200,000 | 0 | 0 | | |
|
| | $1,370,000 | $31,830,000 | | $33,200,000 | $0 | $0 | | |
|
| 655 | | ELECTRICAL SYSTEM UPGRADE, PLANNING, CONSTRUCTION | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 700,000 | 500,000 | | 1,200,000 | 0 | 0 | | |
|
| | $700,000 | $500,000 | | $1,200,000 | $0 | $0 | | |
|
| 738 | | ELKINS EAST RENOVATION AND ADDITION, PLANNING, CONSTRUCTION, FURNITURE AND EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 925,000 | 0 | | 925,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 165,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,080,000 | 0 | | |
|
| | $925,000 | $0 | | $925,000 | $1,245,000 | $0 | | |
|
| 760 | | NURSING PROGRAM AND CLASSROOM BUILDING (THIBODAUX), CONSTRUCTION, CONSTRUCTION, FURNITURE A& EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 428,640 | 0 | | 428,640 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,095,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 4,345,000 | 0 | | |
|
| | $428,640 | $0 | | $428,640 | $6,440,000 | $0 | | |
|
| 761 | | ALLIED HEALTH AND CONTINUING EDUCATION BUILDING (HOUMA), CONSTRUCTION, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS | 142,680 | 0 | | 142,680 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,100,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,380,000 | 0 | | |
|
| | $142,680 | $0 | | $142,680 | $2,480,000 | $0 | | |
|
| 1390 | | HAZMAT AND CHEMICALS MANAGEMENT BUILDING, CONSTRUCTION | | | | | | LAFOURCHE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 415,000 | 0 | | |
|
| | $0 | $0 | | $0 | $415,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $4,071,320 | $38,525,000 | | $42,596,320 | $10,580,000 | $0 | | |
|
| AGENCY: 623 GRAMBLING STATE UNIVERSITY | | | | | | | | | |
|
| 657 | | WASHINGTON COMPLEX RENOVATION CONSTRUCTION DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 2,220,570 | 0 | | 2,220,570 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 735,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,465,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,220,570 | 0 | | 2,220,570 | 0 | 0 | | |
|
| | $4,441,140 | $0 | | $4,441,140 | $2,200,000 | $0 | | |
|
| 687 | | LEE HALL RENOVATION RENOVATION PLANNING DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | | 638,000 | | 638,000 | 0 | 0 | | |
|
| | $0 | $638,000 | | $638,000 | $0 | $0 | | |
|
| 697 | | WOODSON HALL RENOVATION CONSTRUCTION DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 326,462 | 0 | | 326,462 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,075,000 | 0 | | |
|
| | $326,462 | $0 | | $326,462 | $3,075,000 | $0 | | |
|
| 698 | | GRAMBLING HALL BUILDING TO REPLACE CONSTRUCTION AND EQUIPMENT DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 2,145,265 | 108,849 | | 2,254,114 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,145,000 | 0 | | |
|
| | $2,145,265 | $108,849 | | $2,254,114 | $2,145,000 | $0 | | |
|
| 701 | | DREW HALL RENOVATION, PLANNING DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 621,983 | 4,525,930 | | 5,147,913 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 625,000 | 0 | | |
|
| | $621,983 | $4,525,930 | | $5,147,913 | $625,000 | $0 | | |
|
| 702 | | CHARLES P. ADAMS HALL, HVAC SYSTEM CONSTRUCTION DESEGREGATION PROJECT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 761,941 | 0 | | 761,941 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 765,000 | 0 | | |
|
| | $761,941 | $0 | | $761,941 | $765,000 | $0 | | |
|
| 801 | | BASEBALL FIELD AND TRACK RENOVATION PLANNING | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 0 | | 2,000,000 | 0 | 0 | | |
|
| | $2,000,000 | $0 | | $2,000,000 | $0 | $0 | | |
|
| 809 | | NEW HEALTH & PHYSICAL EDUCATION & RECREATION BUILDING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LINCOLN | | 5
|
| GENERAL OBLIGATION BONDS | 8,873,218 | 7,800,000 | | 16,673,218 | 0 | 0 | | |
|
| | $8,873,218 | $7,800,000 | | $16,673,218 | $0 | $0 | | |
|
| 1391 | | STADIUM SUPPORT FACILITY, CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,690,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,690,000 | $0 | | |
|
| 1392 | | MEN'S MEMORIAL GYM RENOVATION, CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 790,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,575,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,365,000 | $0 | | |
|
| 1648 | | RENOVATION OF DOUGLAS HALL, CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,420,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,420,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 12 | | | | | | | | |
|
| AGENCY TOTAL | $19,170,009 | $13,072,779 | | $32,242,788 | $14,285,000 | $0 | | |
|
| AGENCY: 625 LA TECH UNIVERSITY | | | | | | | | | |
|
| 659 | | RENOVATION OF VISUAL ARTS FOR BUSINESS, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 180,000 | 2,544,000 | | 2,724,000 | 0 | 0 | | |
|
| | $180,000 | $2,544,000 | | $2,724,000 | $0 | $0 | | |
|
| 660 | | LAND ACQUISITION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | 200,000 | 300,000 | | 500,000 | 0 | 0 | | |
|
| | $200,000 | $300,000 | | $500,000 | $0 | $0 | | |
|
| 690 | | BIOMEDICAL ENGINEERING BUILDING, RENOVATION PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS | | 3,060,000 | | 3,060,000 | 0 | 0 | | |
|
| | $0 | $3,060,000 | | $3,060,000 | $0 | $0 | | |
|
| 782 | | COMMUNICATIONS INFRASTRUCTURE | | | | | | LINCOLN | |
|
| REVENUE BONDS | 627,000 | 2,000,000 | | 2,627,000 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 2,627,000 | 0 | | |
|
| | $627,000 | $2,000,000 | | $2,627,000 | $2,627,000 | $0 | | |
|
| 805 | | HALE HALL RENOVATION PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LINCOLN | | 5
|
| OTHER AND LOCAL FUNDS | | 1,000,000 | | 1,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,590,000 | 2,300,000 | | 4,890,000 | 0 | 0 | | |
|
| | $2,590,000 | $3,300,000 | | $5,890,000 | $0 | $0 | | |
|
| 1393 | | ENVIRONMENTAL SAFETY BUILDING, CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 355,000 | 0 | | |
|
| | $0 | $0 | | $0 | $355,000 | $0 | | |
|
| 1649 | | PROFESSIONAL AVIATION BUILDINGS RELOCATION AND CLASSROOM BUILDINGS, CONSTRUCTION | | | | | | LINCOLN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 5,075,000 | 0 | | |
|
| | $0 | $0 | | $0 | $5,075,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $3,597,000 | $11,204,000 | | $14,801,000 | $8,057,000 | $0 | | |
|
| AGENCY: 627 MCNEESE STATE UNIVERSITY | | | | | | | | | |
|
| 658 | | NEW PBX TELEPHONE SYSTEM, PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 1,497,600 | 0 | | 1,497,600 | 0 | 0 | | |
|
| | $1,497,600 | $0 | | $1,497,600 | $0 | $0 | | |
|
| 688 | | SHEARMAN FINE ARTS BUILDING RENOVATION AND ADDITION PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | | 8,127,915 | | 8,127,915 | 0 | 0 | | |
|
| | $0 | $8,127,915 | | $8,127,915 | $0 | $0 | | |
|
| 689 | | FRAZAR MEMORIAL LIBRARY RENOVATION AND ADDITION, PLANNING, CONSTRUCTION, FURNITURE AND EQUIPMENT | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | | 10,637,204 | | 10,637,204 | 0 | 0 | | |
|
| | $0 | $10,637,204 | | $10,637,204 | $0 | $0 | | |
|
| 764 | | NEW NURSING AND MASS COMMUNICATION BUILDING, CONSTRUCTION, EQUIPMENT | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 2,567,466 | 0 | | 2,567,466 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,165,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,720,000 | 0 | | |
|
| | $2,567,466 | $0 | | $2,567,466 | $3,885,000 | $0 | | |
|
| 781 | | NEW WOMEN'S SPORT COMPLEX | | | | | | CALCASIEU | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 587,640 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 587,640 | 0 | | 587,640 | 0 | 0 | | |
|
| | $587,640 | $0 | | $587,640 | $587,640 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $4,652,706 | $18,765,119 | | $23,417,825 | $4,472,640 | $0 | | |
|
| AGENCY: 629 NORTHEAST LOUISIANA UNIVERSITY | | | | | | | | | |
|
| 661 | | SANDEL HALL RENOVATION, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 619,360 | 7,844,056 | | 8,463,416 | 0 | 0 | | |
|
| | $619,360 | $7,844,056 | | $8,463,416 | $0 | $0 | | |
|
| 662 | | LAND ACQUISITION | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 750,000 | 350,000 | | 1,100,000 | 0 | 0 | | |
|
| | $750,000 | $350,000 | | $1,100,000 | $0 | $0 | | |
|
| 663 | | UNIVERSITY PLAZA, NEW CONSTRUCTION, PLANNNING, CONSTRUCTION | | | | | | OUACHITA | | 5
|
| FEES AND SELF GENERATED REVENUES | 270,360 | 90,120 | | 360,480 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 270,360 | 90,120 | | 360,480 | 0 | 0 | | |
|
| | $540,720 | $180,240 | | $720,960 | $0 | $0 | | |
|
| 741 | | STADIUM CODE COMPLIANCE | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS | 863,280 | 0 | | 863,280 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 865,000 | 0 | | |
|
| | $863,280 | $0 | | $863,280 | $865,000 | $0 | | |
|
| 765 | | RENOVATION/EXPANSION BIEDENHARN HALL, CONSTRUCTION, EQUIPMENT | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS | 585,085 | 0 | | 585,085 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,380,000 | 0 | | |
|
| | $585,085 | $0 | | $585,085 | $4,380,000 | $0 | | |
|
| 783 | | TECHNOLOGY ADVANCEMENT, UPGRADE, PLANNING, CONSTRUCTION, EQUIPMENT | | | | | | OUACHITA | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 1,946,080 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 1,946,080 | 4,646,080 | | 6,592,160 | 0 | 0 | | |
|
| | $1,946,080 | $4,646,080 | | $6,592,160 | $1,946,080 | $0 | | |
|
| 1394 | | AIRWAY SCIENCE CENTER, CONSTRUCTION | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,950,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 800,000 | 0 | | |
|
| | $0 | $0 | | $0 | $3,750,000 | $0 | | |
|
| 1650 | | NEW LIBRARY BUILDING, CONSTRUCTION | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,215,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,215,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $5,304,525 | $13,020,376 | | $18,324,901 | $12,156,080 | $0 | | |
|
| AGENCY: 631 NORTHWESTERN STATE UNIVERSITY | | | | | | | | | |
|
| 664 | | MORRISON HALL AND FAMILY & CONSUMER SCIENCE BUILDINGS--RENOVATION, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | OUACHITA | | 5
|
| GENERAL OBLIGATION BONDS | 3,385,000 | 140,000 | | 3,525,000 | 0 | 0 | | |
|
| | $3,385,000 | $140,000 | | $3,525,000 | $0 | $0 | | |
|
| 665 | | CAMPUS FIBER OPTICS NETWORK & UPGRADED TELEPHONE SYSTEM, PLANNING, CONSTRUCTION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 585,000 | 6,395,000 | | 6,980,000 | 0 | 0 | | |
|
| | $585,000 | $6,395,000 | | $6,980,000 | $0 | $0 | | |
|
| 667 | | EDUCATION CENTER EXPANSION, LEESVILLE - FT. POLK CAMPUS | | | | | | VERNON | |
|
| GENERAL OBLIGATION BONDS | 497,550 | 4,895,050 | | 5,392,600 | 0 | 0 | | |
|
| | $497,550 | $4,895,050 | | $5,392,600 | $0 | $0 | | |
|
| 785 | | CASPARI HALL - EAST & WEST - RENOVATION, PLANNING, CONSTRUCTION | | | | | | NATCHITOCHES | |
|
| REVENUE BONDS | 3,008,118 | 0 | | 3,008,118 | 0 | 0 | | |
|
| REIMBURSEMENT BONDS | 247,882 | 0 | | 247,882 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 3,256,000 | 0 | | |
|
| | $3,256,000 | $0 | | $3,256,000 | $3,256,000 | $0 | | |
|
| 786 | | GOLF COURSE EXPANSION, PLANNING AND CONSTRUCTION | | | | | | NATCHITOCHES | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 100,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 100,000 | 0 | | 100,000 | 0 | 0 | | |
|
| REVENUE BONDS | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 740,000 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $840,000 | $0 | | |
|
| 787 | | STUDENT ACTIVITY CENTER RENOVATION AND ADDITION, PLANNING, CONSTRUCTION, FURNITURE & CONSTRUCTION | | | | | | NATCHITOCHES | |
|
| REIMBURSEMENT BONDS | 537,108 | 6,308,183 | | 6,845,291 | 0 | 0 | | |
|
| REVENUE BONDS | | 0 | | 0 | 6,845,291 | 0 | | |
|
| | $537,108 | $6,308,183 | | $6,845,291 | $6,845,291 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $8,860,658 | $17,738,233 | | $26,598,891 | $10,941,291 | $0 | | |
|
| AGENCY: 634 SOUTHEASTERN LA UNIVERSITY | | | | | | | | | |
|
| 650 | | CLASSROOM BUILDING RENOVATIONS, PLANNING, RENOVATION & EQUIPMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 225,000 | 3,000,000 | | 3,225,000 | 0 | 0 | | |
|
| | $225,000 | $3,000,000 | | $3,225,000 | $0 | $0 | | |
|
| 651 | | TEACHER EDUCATION CENTER RENOVATION AND ADDITION, PLANNING, CONSTRUCTION & EQUIPMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 540,000 | 6,235,000 | | 6,775,000 | 0 | 0 | | |
|
| | $540,000 | $6,235,000 | | $6,775,000 | $0 | $0 | | |
|
| 652 | | ST. TAMMANY MULTI-USE FACILITY, ACQUISITION | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 70,000 | 4,500,000 | | 4,570,000 | 0 | 0 | | |
|
| | $70,000 | $4,500,000 | | $4,570,000 | $0 | $0 | | |
|
| 684 | | CEFALU COLISEUM RENOVATION, PLANNING, CONSTRUCTION & EQUIPMENT | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | | 305,000 | | 305,000 | 0 | 0 | | |
|
| | $0 | $305,000 | | $305,000 | $0 | $0 | | |
|
| 798 | | BIOLOGY BUILDING RENOVATION AND ADDITION, PLANNING, CONSTRUCTION & EQUIPMENT | | | | | | TANGIPAHOA | | 5
|
| GENERAL OBLIGATION BONDS | 5,810,000 | 5,000,000 | | 10,810,000 | 0 | 0 | | |
|
| | $5,810,000 | $5,000,000 | | $10,810,000 | $0 | $0 | | |
|
| 799 | | OLD WESTSIDE SCHOOL RENOVATION, CONSTRUCTION & EQUIPMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 2,225,000 | 2,220,000 | | 4,445,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,445,000 | 0 | | |
|
| | $2,225,000 | $2,220,000 | | $4,445,000 | $4,445,000 | $0 | | |
|
| 800 | | CLASSROOM & SCIENCE LABORATORY BUILDING, CONSTRUCTION & EQUIPMENT | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 10,655,000 | 1,000,000 | | 11,655,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,720,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 5,935,000 | 0 | | |
|
| | $10,655,000 | $1,000,000 | | $11,655,000 | $10,655,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $19,525,000 | $22,260,000 | | $41,785,000 | $15,100,000 | $0 | | |
|
| AGENCY: 640 UNIVERSITY SOUTHWESTERN LA | | | | | | | | | |
|
| 649 | | BURKE - HAWTHORNE HALL RENOVATION AND EXPANSION, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 658,217 | 7,590,382 | | 8,248,599 | 0 | 0 | | |
|
| | $658,217 | $7,590,382 | | $8,248,599 | $0 | $0 | | |
|
| 682 | | MADISON HALL WINDOW REPLACEMENT, PLANNING AND CONSTRUCTION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | | 1,200,000 | | 1,200,000 | 0 | 0 | | |
|
| | $0 | $1,200,000 | | $1,200,000 | $0 | $0 | | |
|
| 683 | | PARKER HALL RENOVATION, PLANNING AND CONSTRUCTION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | | 720,000 | | 720,000 | 0 | 0 | | |
|
| | $0 | $720,000 | | $720,000 | $0 | $0 | | |
|
| 759 | | DUPRE LIBRARY RENOVATION AND EXPANSION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 586,750 | 0 | | 586,750 | 0 | 0 | | |
|
| | $586,750 | $0 | | $586,750 | $0 | $0 | | |
|
| 777 | | BILLEAUD HALL RENOVATIONS AND EXPANSION, PLANNING, CONSTRUCTION | | | | | | LAFAYETTE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 1,065,300 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 1,065,300 | 0 | | 1,065,300 | 0 | 0 | | |
|
| | $1,065,300 | $0 | | $1,065,300 | $1,065,300 | $0 | | |
|
| 778 | | FOOTBALL STADIUM REPAIRS AND WATERPROOFING, PLANNING AND CONSTRUCTION | | | | | | LAFAYETTE | |
|
| FEES AND SELF GENERATED REVENUES | | 0 | | 0 | 840,000 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 840,000 | 0 | | 840,000 | 0 | 0 | | |
|
| | $840,000 | $0 | | $840,000 | $840,000 | $0 | | |
|
| 797 | | F. G. MOUTON RENOVATION AND EXPANSION, PLANNING, CONSTRUCTION, FURNITURE & EQUIPMENT | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 8,745,000 | 150,000 | | 8,895,000 | 0 | 0 | | |
|
| | $8,745,000 | $150,000 | | $8,895,000 | $0 | $0 | | |
|
| 1396 | | APPAREL AND TEXTILE RESEARCH AND DEVELOPMENT FACILITY, CONSTRUCTION | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,530,000 | 0 | | |
|
| | $0 | $0 | | $0 | $4,530,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $11,895,267 | $9,660,382 | | $21,555,649 | $6,435,300 | $0 | | |
|
| AGENCY: 641 DELGADO COMMUNITY COLLEGE | | | | | | | | | |
|
| 691 | | LIBRARY - LEARNING RESOURCE CENTER WEST BANK CAMPUS NEW CONSTRUCTION PLANNING,CONSTRUCTION,FURNITURE & EQUIPMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | | 2,010,876 | | 2,010,876 | 0 | 0 | | |
|
| | $0 | $2,010,876 | | $2,010,876 | $0 | $0 | | |
|
| 766 | | CLASSROOM AND STUDENT SERVICES BUILDING WEST BANK CAMPUS NEW CONSTRUCTION EQUIPMENT | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 671,428 | 0 | | 671,428 | 0 | 0 | | |
|
| | $671,428 | $0 | | $671,428 | $0 | $0 | | |
|
| 784 | | STUDENT LIFE CENTER ADDITION/NEW CONSTRUCTION PLANNING,CONSTRUCTION,FURNITURE & EQUIPMENT | | | | | | ORLEANS | | 5
|
| REVENUE BONDS | 305,000 | 3,485,000 | | 3,790,000 | 0 | 0 | | |
|
| | $305,000 | $3,485,000 | | $3,790,000 | $0 | $0 | | |
|
| 1395 | | HIGH SCHOOL THAT WORKS PROGRAM, AND OTHER RENOVATIONS/CONSTRUCTION | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 610,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,230,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,840,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $976,428 | $5,495,876 | | $6,472,304 | $1,840,000 | $0 | | |
|
| AGENCY: 643 NUNEZ COMMUNITY COLLEGE | | | | | | | | | |
|
| 666 | | CAMPUS WIDE FIBEROPTIC & TELEPHONE UPGRADE, PLANNING AND CONSTRUCTION | | | | | | | |
|
| GENERAL OBLIGATION BONDS | 300,000 | 0 | | 300,000 | 0 | 0 | | |
|
| | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| 742 | | LAND ACQUISITION | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 400,000 | 0 | | |
|
| | $400,000 | $0 | | $400,000 | $400,000 | $0 | | |
|
| 767 | | NEW LIBRARY / CLASSROOMS BUILDING AND ADDITIONS TO BUILDING A, CONSTRUCTION, AND EQUIPMENT | | | | | | ST. BERNARD | |
|
| GENERAL OBLIGATION BONDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,560,000 | 0 | | |
|
| | $600,000 | $0 | | $600,000 | $3,560,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $1,300,000 | $0 | | $1,300,000 | $3,960,000 | $0 | | |
|
| AGENCY: 651 LA SCH FOR VISUALLY IMPAIRED | | | | | | | | | |
|
| 568 | | STATEWIDE DEPOSITORY FOR BRAILLE AND LARGE PRINT BOOKS AND MATERIALS RENOVATION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 150,000 | 0 | | 150,000 | 0 | 0 | | |
|
| | $150,000 | $0 | | $150,000 | $0 | $0 | | |
|
| 569 | | RE-ROOF 7 CAMPUS BUILDINGS | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | 163,110 | 0 | | 163,110 | 0 | 0 | | |
|
| | $163,110 | $0 | | $163,110 | $0 | $0 | | |
|
| 570 | | LA SCH F/T VISUALLY IMPAIRED REDESIGN AND CONSTRUCTION | | | | | | EAST BATON ROUGE | | 5
|
| GENERAL OBLIGATION BONDS | 612,624 | 7,713,077 | | 8,325,701 | 0 | 0 | | |
|
| | $612,624 | $7,713,077 | | $8,325,701 | $0 | $0 | | |
|
| 571 | | MAIN PARKING LOT OVERLAY | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS | | 82,500 | | 82,500 | 0 | 0 | | |
|
| | $0 | $82,500 | | $82,500 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $925,734 | $7,795,577 | | $8,721,311 | $0 | $0 | | |
|
| AGENCY: 655 LA SPECIAL EDUCATION CENTER | | | | | | | | | |
|
| 608 | | TRANSITIONAL FAMILY LIFE TRAINING EXPANSION | | | | | | RAPIDES | |
|
| STATE GENERAL FUND (DIRECT) | 2,063,171 | 1,031,586 | | 3,094,757 | 0 | 0 | | |
|
| | $2,063,171 | $1,031,586 | | $3,094,757 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $2,063,171 | $1,031,586 | | $3,094,757 | $0 | $0 | | |
|
| AGENCY: 657 LA SCH MATH SCIENCE AND ARTS | | | | | | | | | |
|
| 475 | | CADDO HALL IMPROVEMENTS | | | | | | NATCHITOCHES | | 5
|
| STATE GENERAL FUND (DIRECT) | 165,080 | 0 | | 165,080 | 0 | 0 | | |
|
| | $165,080 | $0 | | $165,080 | $0 | $0 | | |
|
| 476 | | REPLACEMENT OF ANNEX BUILDING | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | 125,000 | 297,945 | | 422,945 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 5,189,395 | | 5,189,395 | 0 | 0 | | |
|
| | $125,000 | $5,487,340 | | $5,612,340 | $0 | $0 | | |
|
| 478 | | UPGRADING OF SCIENCE LABORATORIES | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | | 66,300 | | 66,300 | 0 | 0 | | |
|
| | $0 | $66,300 | | $66,300 | $0 | $0 | | |
|
| 479 | | COMPUTER WIRING IN DORMITORIES | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | | 12,000 | | 12,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 132,000 | | 132,000 | 0 | 0 | | |
|
| | $0 | $144,000 | | $144,000 | $0 | $0 | | |
|
| 480 | | PRUDHOMME HALL IMPROVEMENTS | | | | | | | |
|
| GENERAL OBLIGATION BONDS | | 108,000 | | 108,000 | 0 | 0 | | |
|
| | $0 | $108,000 | | $108,000 | $0 | $0 | | |
|
| 481 | | INSTALLATION OF FIBER OPTIC CABLES IN DORMITORIES | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | | 12,000 | | 12,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 132,000 | | 132,000 | 0 | 0 | | |
|
| | $0 | $144,000 | | $144,000 | $0 | $0 | | |
|
| 482 | | RENOVATION OF AUDITORIUM/EXISTING CAFETERIA SPACE | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | | 15,858 | | 15,858 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 249,442 | | 249,442 | 0 | 0 | | |
|
| | $0 | $265,300 | | $265,300 | $0 | $0 | | |
|
| 483 | | ADDITION TO GYMNASIUM/STUDENT ACTIVITIES CENTER | | | | | | | |
|
| GENERAL OBLIGATION BONDS | | 772,950 | | 772,950 | 0 | 0 | | |
|
| | $0 | $772,950 | | $772,950 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 8 | | | | | | | | |
|
| AGENCY TOTAL | $290,080 | $6,987,890 | | $7,277,970 | $0 | $0 | | |
|
| AGENCY: 662 LA EDUCATIONAL TV AUTHORITY | | | | | | | | | |
|
| 470 | | CLOSED CAPTION AND DESCRIPTIVE VIDEO SERVICE | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 450,000 | 0 | | 450,000 | 0 | 0 | | |
|
| | $450,000 | $0 | | $450,000 | $0 | $0 | | |
|
| 471 | | MULTI-CHANNEL EXPANSION OF THE EXISTING COMPRESSED DIGITAL DELIVERY SYSTEM (PREPARATION FOR DIGITAL CONVERSION). THIS PROJECT WOULD COMPLETE THE GROUND SEGMENT COMPONENT OF THE DIGITAL | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 250,000 | 0 | | 250,000 | 0 | 0 | | |
|
| | $250,000 | $0 | | $250,000 | $0 | $0 | | |
|
| 472 | | PURCHASE OF LAFAYETTE TOWER AND BUILDING. | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 175,000 | 0 | | 175,000 | 0 | 0 | | |
|
| | $175,000 | $0 | | $175,000 | $0 | $0 | | |
|
| 473 | | REPLACEMENT OF TRANSMISSION LINE AT K L T L, LAKE CHARLES | | | | | | JEFFERSON DAVIS | |
|
| FEDERAL FUNDS | | 0 | | 0 | 110,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 115,000 | 0 | | 115,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 110,000 | 0 | | |
|
| | $115,000 | $0 | | $115,000 | $220,000 | $0 | | |
|
| 474 | | REPLACEMENT OF VIDEO TAPE/ANALOG STORAGE DEVICES AT LETA'S NETWORK OPERATIONS CENTER | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 150,000 | 0 | | 150,000 | 0 | 0 | | |
|
| | $150,000 | $0 | | $150,000 | $0 | $0 | | |
|
| 1651 | | K L T M MONROE, TRANSMITTER, TRANSMISSION LINE AND ANTENNA REPLACEMENT, PLANNING AND CONSTRUCTION | | | | | | OUACHITA | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 455,000 | 0 | | |
|
| | $0 | $0 | | $0 | $455,000 | $0 | | |
|
| 1652 | | RETROFIT FREON CHILLER, AND A / C FOR STAGING AREA, PLANNING AND CONSTRUCTION | | | | | | EAST BATON ROUGE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 180,000 | 0 | | |
|
| | $0 | $0 | | $0 | $180,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 7 | | | | | | | | |
|
| AGENCY TOTAL | $1,140,000 | $0 | | $1,140,000 | $855,000 | $0 | | |
|
| AGENCY: 671 BOARD OF REGENTS | | | | | | | | | |
|
| 709 | | MAJOR REPAIRS AND REROOFING OF CAMPUS BUILDINGS | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | 30,000,000 | 60,000,000 | | 90,000,000 | 0 | 0 | | |
|
| | $30,000,000 | $60,000,000 | | $90,000,000 | $0 | $0 | | |
|
| 753 | | LIFE SAFETY CODE CITATION CORRECTIONS | | | | | | STATEWIDE | |
|
| STATE GENERAL FUND (DIRECT) | 8,000,000 | 32,000,000 | | 40,000,000 | 0 | 0 | | |
|
| | $8,000,000 | $32,000,000 | | $40,000,000 | $0 | $0 | | |
|
| 796 | | HIGHER EDUCATION CAMPUS MASTER PLANNING | | | | | | STATEWIDE | |
|
| GENERAL OBLIGATION BONDS | 1,250,000 | 0 | | 1,250,000 | 0 | 0 | | |
|
| | $1,250,000 | $0 | | $1,250,000 | $0 | $0 | | |
|
| 1588 | | ADA COMPLIANCE IN HIGHER EDUCATION FACILITIES | | | | | | STATEWIDE | | 5
|
| STATE GENERAL FUND (DIRECT) | 5,000,000 | 20,000,000 | | 25,000,000 | 0 | 0 | | |
|
| | $5,000,000 | $20,000,000 | | $25,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $44,250,000 | $112,000,000 | | $156,250,000 | $0 | $0 | | |
|
| AGENCY: 674 LA UNIVERSITIES MARINE CONSORT | | | | | | | | | |
|
| 668 | | MID- LIFE REFIT/ RENOVATION OF RESEARCH VESSEL PELICAN | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 1,440,000 | 0 | | 1,440,000 | 0 | 0 | | |
|
| | $1,440,000 | $0 | | $1,440,000 | $0 | $0 | | |
|
| 692 | | MARINE CENTER BULKHEAD/ PIER REPAIRS LOUISIANA UNIVERSITIES MARINE CONSORTIUM (LUMCON) | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | | 468,640 | | 468,640 | 0 | 0 | | |
|
| | $0 | $468,640 | | $468,640 | $0 | $0 | | |
|
| 745 | | POWER QUALITY PROTECTION SYSTEM | | | | | | TERREBONE | |
|
| STATE GENERAL FUND (DIRECT) | 175,000 | 0 | | 175,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 175,000 | 0 | | |
|
| | $175,000 | $0 | | $175,000 | $175,000 | $0 | | |
|
| 746 | | MAJOR REPAIRS/DEFERRED MAINTENANCE | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 145,800 | 0 | | 145,800 | 0 | 0 | | |
|
| | $145,800 | $0 | | $145,800 | $0 | $0 | | |
|
| 747 | | HVAC SYSTEM MODIFICATION | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | | 75,600 | | 75,600 | 0 | 0 | | |
|
| | $0 | $75,600 | | $75,600 | $0 | $0 | | |
|
| 748 | | CHILLER REPLACEMENT AT MAIN BUILDING | | | | | | TERREBONE | |
|
| GENERAL OBLIGATION BONDS | 322,500 | 0 | | 322,500 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 325,000 | 0 | | |
|
| | $322,500 | $0 | | $322,500 | $325,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $2,083,300 | $544,240 | | $2,627,540 | $500,000 | $0 | | |
|
| AGENCY: 698 EDUCATIONAL SUPPORT SERVICES | | | | | | | | | |
|
| 1653 | | BUNKIE YOUTH CENTER ACQUISITIONS, RENOVATIONS AND MAJOR REPAIRS | | | | | | AVOYELLES | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 515,000 | 0 | | |
|
| | $0 | $0 | | $0 | $515,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $515,000 | $0 | | |
|
| AGENCY: 702 JEFFERSON TECHNICAL COLLEGE | | | | | | | | | |
|
| 564 | | LAND STRIP PURCHASE | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 330,000 | 0 | | 330,000 | 0 | 0 | | |
|
| | $330,000 | $0 | | $330,000 | $0 | $0 | | |
|
| 566 | | SITE ITEMS REPAIR | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 147,275 | 0 | | 147,275 | 0 | 0 | | |
|
| | $147,275 | $0 | | $147,275 | $0 | $0 | | |
|
| 567 | | FRONT BUILDING REPAIR | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 137,000 | 0 | | 137,000 | 0 | 0 | | |
|
| | $137,000 | $0 | | $137,000 | $0 | $0 | | |
|
| 590 | | SHOP BUILDING REPAIR | | | | | | JEFFERSON | | 5
|
| GENERAL OBLIGATION BONDS | 223,944 | 0 | | 223,944 | 0 | 0 | | |
|
| | $223,944 | $0 | | $223,944 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $838,219 | $0 | | $838,219 | $0 | $0 | | |
|
| AGENCY: 703 SIDNEY COLLIER TECH COLLEGE | | | | | | | | | |
|
| 613 | | CHILD CARE FACILITY | | | | | | | |
|
| STATE GENERAL FUND (DIRECT) | 66,300 | 66,300 | | 132,600 | 0 | 0 | | |
|
| | $66,300 | $66,300 | | $132,600 | $0 | $0 | | |
|
| 614 | | BARBERING PROGRAM RENOVATIONS | | | | | | ORLEANS | | 5
|
| STATE GENERAL FUND (DIRECT) | 137,000 | 0 | | 137,000 | 0 | 0 | | |
|
| | $137,000 | $0 | | $137,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $203,300 | $66,300 | | $269,600 | $0 | $0 | | |
|
| AGENCY: 711 BATON ROUGE REG TECH COLLEGE | | | | | | | | | |
|
| 615 | | BARBERING AND COSMETOLOGY BUILDING ADDITION TO LOUISIANA TECHNICAL COLLEGE - BATON ROUGE CAMPUS. | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 994,875 | 0 | | 994,875 | 0 | 0 | | |
|
| | $994,875 | $0 | | $994,875 | $0 | $0 | | |
|
| 616 | | RESTROOM RENOVATION FOR BUILDING NUMBER ONE. | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 75,000 | 0 | | 75,000 | 0 | 0 | | |
|
| | $75,000 | $0 | | $75,000 | $0 | $0 | | |
|
| 617 | | WATER TOWER RENOVATION | | | | | | MULTIPLE | |
|
| GENERAL OBLIGATION BONDS | 51,000 | 0 | | 51,000 | 0 | 0 | | |
|
| | $51,000 | $0 | | $51,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $1,120,875 | $0 | | $1,120,875 | $0 | $0 | | |
|
| AGENCY: 712 SULLIVAN TECHNICAL COLLEGE | | | | | | | | | |
|
| 621 | | CAFETORIUM PLANNING AND CONSTRUCTION | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 535,594 | | 535,594 | 0 | 0 | | |
|
| | $0 | $535,594 | | $535,594 | $0 | $0 | | |
|
| 622 | | DIESEL MECHANICS SHOP PLANNING AND CONSTRUCTION | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 717,878 | | 717,878 | 0 | 0 | | |
|
| | $0 | $717,878 | | $717,878 | $0 | $0 | | |
|
| 623 | | WALKWAY COVER PLANNING AND CONSTRUCTION | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 64,944 | | 64,944 | 0 | 0 | | |
|
| | $0 | $64,944 | | $64,944 | $0 | $0 | | |
|
| 624 | | PRECAST DECORATIVE PANELS REMOVE AND REPLACE | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | 65,259 | 0 | | 65,259 | 0 | 0 | | |
|
| | $65,259 | $0 | | $65,259 | $0 | $0 | | |
|
| 625 | | HEALTH & HUMAN DEVELOPMENT OCCUPATION TRAINING CENTER | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | 430,000 | 6,230,000 | | 6,660,000 | 0 | 0 | | |
|
| | $430,000 | $6,230,000 | | $6,660,000 | $0 | $0 | | |
|
| 626 | | STUDENT SERVICE AND ONE STOP CAREER CENTER PLANNING AND CONSTRUCTION | | | | | | WASHINGTON | |
|
| GENERAL OBLIGATION BONDS | | 562,000 | | 562,000 | 0 | 0 | | |
|
| | $0 | $562,000 | | $562,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $495,259 | $8,110,416 | | $8,605,675 | $0 | $0 | | |
|
| AGENCY: 713 HAMMOND AREA TECHNICAL COLLEGE | | | | | | | | | |
|
| 557 | | FACILITY SAFETY FIRE ALARM SYSTEM/RENOVATIONS LOUISIANA TECHNICAL COLLEGE HAMMOND AREA CAMPUS | | | | | | TANGIPAHOA | |
|
| GENERAL OBLIGATION BONDS | 97,764 | 166,080 | | 263,844 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 330,000 | 0 | | |
|
| | $97,764 | $166,080 | | $263,844 | $330,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $97,764 | $166,080 | | $263,844 | $330,000 | $0 | | |
|
| AGENCY: 716 FLORIDA PH TECHNICAL COLLEGE | | | | | | | | | |
|
| 600 | | NEW FACILITY FOR FLORIDA PARISHES TECH INST/COLLEGE | | | | | | ST. HELENA | |
|
| GENERAL OBLIGATION BONDS | 550,607 | 6,040,236 | | 6,590,843 | 0 | 0 | | |
|
| | $550,607 | $6,040,236 | | $6,590,843 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $550,607 | $6,040,236 | | $6,590,843 | $0 | $0 | | |
|
| AGENCY: 717 WESTSIDE TECHNICAL COLLEGE | | | | | | | | | |
|
| 603 | | RESTROOMS- RENOVATION AND RECONSTRUCTION | | | | | | IBERVILLE | | 2
|
| STATE GENERAL FUND (DIRECT) | 104,400 | 0 | | 104,400 | 0 | 0 | | |
|
| | $104,400 | $0 | | $104,400 | $0 | $0 | | |
|
| 604 | | CLASSROOM AIR CONDITIONING | | | | | | IBERVILLE | |
|
| STATE GENERAL FUND (DIRECT) | 78,890 | 0 | | 78,890 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 185,000 | 0 | | |
|
| | $78,890 | $0 | | $78,890 | $185,000 | $0 | | |
|
| 605 | | STUDENT PARKING LOT EXPANSION / RESURFACING | | | | | | IBERVILLE | |
|
| STATE GENERAL FUND (DIRECT) | 66,000 | 0 | | 66,000 | 0 | 0 | | |
|
| | $66,000 | $0 | | $66,000 | $0 | $0 | | |
|
| 606 | | FACILITY RENOVATION / BUILDING CODES PROJECT | | | | | | IBERVILLE | |
|
| STATE GENERAL FUND (DIRECT) | 143,678 | 0 | | 143,678 | 0 | 0 | | |
|
| | $143,678 | $0 | | $143,678 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $392,968 | $0 | | $392,968 | $185,000 | $0 | | |
|
| AGENCY: 720 ASCENSION TECHNICAL COLLEGE | | | | | | | | | |
|
| 559 | | BUILDING ONE REPAIRS AND RENOVATIONS | | | | | | ASCENSION | |
|
| GENERAL OBLIGATION BONDS | 40,220 | 442,420 | | 482,640 | 0 | 0 | | |
|
| | $40,220 | $442,420 | | $482,640 | $0 | $0 | | |
|
| 560 | | NEW TECHNICAL EDUCATION BUILDING - PLANNING AND CONSTRUCTION | | | | | | ASCENSION | |
|
| GENERAL OBLIGATION BONDS | | 4,881,632 | | 4,881,632 | 0 | 0 | | |
|
| | $0 | $4,881,632 | | $4,881,632 | $0 | $0 | | |
|
| 561 | | BUILDING ADDITION - PLANNING AND CONSTRUCTION | | | | | | ASCENSION | |
|
| GENERAL OBLIGATION BONDS | 2,850,834 | 660,000 | | 3,510,834 | 0 | 0 | | |
|
| | $2,850,834 | $660,000 | | $3,510,834 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $2,891,054 | $5,984,052 | | $8,875,106 | $0 | $0 | | |
|
| AGENCY: 731 SOUTH LA REG TECHNICAL COLLEGE | | | | | | | | | |
|
| 577 | | MARINE TRAINING SIMULATOR | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 643,200 | 0 | | 643,200 | 0 | 0 | | |
|
| | $643,200 | $0 | | $643,200 | $0 | $0 | | |
|
| 578 | | LAMPI PARKING AND DRIVEWAY | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 84,811 | 0 | | 84,811 | 0 | 0 | | |
|
| | $84,811 | $0 | | $84,811 | $0 | $0 | | |
|
| 579 | | A D A ELEVATOR UP-GRADE | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 60,000 | 0 | | 60,000 | 0 | 0 | | |
|
| | $60,000 | $0 | | $60,000 | $0 | $0 | | |
|
| 610 | | BOILERS/ CHILLERS REPLACEMENT | | | | | | TERREBONE | | 5
|
| GENERAL OBLIGATION BONDS | 210,000 | 0 | | 210,000 | 0 | 0 | | |
|
| | $210,000 | $0 | | $210,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $998,011 | $0 | | $998,011 | $0 | $0 | | |
|
| AGENCY: 732 YOUNG MEMORIAL TECH COLLEGE | | | | | | | | | |
|
| 574 | | BUILDING ADDITION AT YOUNG MEMORIAL CAMPUS LOUISIANA TECHNICAL COLLEGE SYSTEM | | | | | | ST. MARY | | 5
|
| GENERAL OBLIGATION BONDS | 200,000 | 2,325,000 | | 2,525,000 | 0 | 0 | | |
|
| | $200,000 | $2,325,000 | | $2,525,000 | $0 | $0 | | |
|
| 576 | | "ONE-STOP SHOP" EMPLOYMENT/TRAINING RESOURCE CENTER IN ASSUMPTION PARISH | | | | | | ASSUMPTION | |
|
| GENERAL OBLIGATION BONDS | 158,400 | 2,107,400 | | 2,265,800 | 0 | 0 | | |
|
| | $158,400 | $2,107,400 | | $2,265,800 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $358,400 | $4,432,400 | | $4,790,800 | $0 | $0 | | |
|
| AGENCY: 733 LAFOURCHE TECHNICAL COLLEGE | | | | | | | | | |
|
| 618 | | COLLAPSED CONCRETE AREA SOUTH LAFOURCHE CAMPUS | | | | | | LAFOURCHE | |
|
| STATE GENERAL FUND (DIRECT) | 57,000 | 0 | | 57,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 60,000 | 0 | | |
|
| | $57,000 | $0 | | $57,000 | $60,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $57,000 | $0 | | $57,000 | $60,000 | $0 | | |
|
| AGENCY: 741 LAFAYETTE REG TECH COLLEGE | | | | | | | | | |
|
| 595 | | ALLIED HEALTH CARE FACILITY, PLANNING, CONSTRUCTION AND EQUIPMENT, LOUISIANA TECHNICAL COLLEGE-LAFAYETTE | | | | | | LAFAYETTE | | 5
|
| GENERAL OBLIGATION BONDS | 3,560,420 | 675,453 | | 4,235,873 | 0 | 0 | | |
|
| | $3,560,420 | $675,453 | | $4,235,873 | $0 | $0 | | |
|
| 596 | | UPDATE OF FACILITY TO COMPLY WITH A. D. A. LOUISIANA TECHNICAL COLLEGE-LAFAYETTE CAMPUS | | | | | | LAFAYETTE | |
|
| GENERAL OBLIGATION BONDS | 13,764 | 151,404 | | 165,168 | 0 | 0 | | |
|
| | $13,764 | $151,404 | | $165,168 | $0 | $0 | | |
|
| 597 | | NEW DIESEL/HEAVY DUTY EQUIPMENT FACILITY LOUISIANA TECHNICAL COLLEGE-LAFAYETTE CAMPUS | | | | | | LAFAYETTE | | 5
|
| GENERAL OBLIGATION BONDS | 243,568 | 2,679,251 | | 2,922,819 | 0 | 0 | | |
|
| | $243,568 | $2,679,251 | | $2,922,819 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $3,817,752 | $3,506,108 | | $7,323,860 | $0 | $0 | | |
|
| AGENCY: 742 T H HARRIS TECHNICAL COLLEGE | | | | | | | | | |
|
| 598 | | LAND AND BUILDING ACQUISITION ADJACENT TO LTC - T. H. HARRIS CAMPUS | | | | | | ST. LANDRY | | 5
|
| GENERAL OBLIGATION BONDS | 1,530,000 | 0 | | 1,530,000 | 0 | 0 | | |
|
| | $1,530,000 | $0 | | $1,530,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,530,000 | $0 | | $1,530,000 | $0 | $0 | | |
|
| AGENCY: 744 GULF AREA TECHNICAL COLLEGE | | | | | | | | | |
|
| 581 | | BUILDING E RENOVATIONS, CONSTRUCTION | | | | | | VERMILION | |
|
| GENERAL OBLIGATION BONDS | 305,000 | 0 | | 305,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 305,000 | 0 | | |
|
| | $305,000 | $0 | | $305,000 | $305,000 | $0 | | |
|
| 582 | | ADDITION AND REPAIR OF THE COLLISION REPAIR TECHNOLOGY DEPARTMENT | | | | | | VERMILION | |
|
| GENERAL OBLIGATION BONDS | 36,000 | 396,000 | | 432,000 | 0 | 0 | | |
|
| | $36,000 | $396,000 | | $432,000 | $0 | $0 | | |
|
| 619 | | CONSTRUCTION OF ADMINISTRATION/INSTRUCTIONAL BUILDING | | | | | | VERNON | |
|
| GENERAL OBLIGATION BONDS | 616,900 | 2,875,900 | | 3,492,800 | 0 | 0 | | |
|
| | $616,900 | $2,875,900 | | $3,492,800 | $0 | $0 | | |
|
| 620 | | WELDING FACILITY AND MACHINE SHOP TRAINING | | | | | | VERMILION | |
|
| GENERAL OBLIGATION BONDS | 218,140 | 1,409,540 | | 1,627,680 | 0 | 0 | | |
|
| | $218,140 | $1,409,540 | | $1,627,680 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $1,176,040 | $4,681,440 | | $5,857,480 | $305,000 | $0 | | |
|
| AGENCY: 745 EVANGELINE TECHNICAL COLLEGE | | | | | | | | | |
|
| 562 | | CONSTRUCTION AND RENOVATIONS TO LOUISIANA TECHNICAL COLLEGE-EVANGELINE CAMPUS | | | | | | ST. MARTIN | | 5
|
| GENERAL OBLIGATION BONDS | 1,032,000 | 0 | | 1,032,000 | 0 | 0 | | |
|
| | $1,032,000 | $0 | | $1,032,000 | $0 | $0 | | |
|
| 563 | | EXPANSION - EVANGELINE CAMPUS | | | | | | ST. MARTIN | |
|
| GENERAL OBLIGATION BONDS | 125,000 | 1,375,000 | | 1,500,000 | 0 | 0 | | |
|
| | $125,000 | $1,375,000 | | $1,500,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $1,157,000 | $1,375,000 | | $2,532,000 | $0 | $0 | | |
|
| AGENCY: 746 CHARLES COREIL TECH COLLEGE | | | | | | | | | |
|
| 555 | | CONSTRUCTION OF ALLIED HEALTH CARE BUILDING | | | | | | EVANGELINE | |
|
| GENERAL OBLIGATION BONDS | 77,733 | 1,007,413 | | 1,085,146 | 0 | 0 | | |
|
| | $77,733 | $1,007,413 | | $1,085,146 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $77,733 | $1,007,413 | | $1,085,146 | $0 | $0 | | |
|
| AGENCY: 751 SOWELA REGIONAL TECH COLLEGE | | | | | | | | | |
|
| 584 | | AVIATION MAINTENANCE TECHNOLOGY EXPANSION | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | | 126,418 | | 126,418 | 0 | 0 | | |
|
| | $0 | $126,418 | | $126,418 | $0 | $0 | | |
|
| 585 | | REPLACE LA TECHNICAL COLLEGE - SOWELA CAMPUS ADMINISTRATION HVAC | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 222,000 | 0 | | 222,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 165,000 | 0 | | |
|
| | $222,000 | $0 | | $222,000 | $165,000 | $0 | | |
|
| 586 | | LOUISIANA TECHNICAL COLLEGE - SOWELA CAMPUS COMPUTER CENTER BUILDING RENOVATION | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 13,333 | 180,157 | | 193,490 | 0 | 0 | | |
|
| | $13,333 | $180,157 | | $193,490 | $0 | $0 | | |
|
| 587 | | RENOVATION OF STUDENT SERVICES OFFICE AT LOUISIANA TECHNICAL COLLEGE - SOWELA CAMPUS | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | 71,750 | 0 | | 71,750 | 0 | 0 | | |
|
| | $71,750 | $0 | | $71,750 | $0 | $0 | | |
|
| 588 | | LAND ACQUISITION, SITE PREPARATION, AND CONSTRUCTION OF A NEW HEALTH CARE AND CHILD CARE EDUCATIONAL FACILITY AT LOUISIANA TECHNICAL COLLEGE - SOWELA CAMPUS | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | | 3,180,746 | | 3,180,746 | 0 | 0 | | |
|
| | $0 | $3,180,746 | | $3,180,746 | $0 | $0 | | |
|
| 589 | | ROOF REPLACEMENT FOR THE COMPUTER CENTER AT LOUISIANA TECHNICAL COLLEGE - SOWELA CAMPUS | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS | | 159,408 | | 159,408 | 0 | 0 | | |
|
| | $0 | $159,408 | | $159,408 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $307,083 | $3,646,729 | | $3,953,812 | $165,000 | $0 | | |
|
| AGENCY: 753 ACADIAN TECHNICAL COLLEGE | | | | | | | | | |
|
| 580 | | REPAIR AND OVERLAY OF PARKING AREA AND DRIVEWAY | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 103,194 | 0 | | 103,194 | 0 | 0 | | |
|
| | $103,194 | $0 | | $103,194 | $0 | $0 | | |
|
| 601 | | CONVERT AUTO BODY SHOP TO CLASSROOM | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 31,158 | 342,733 | | 373,891 | 0 | 0 | | |
|
| | $31,158 | $342,733 | | $373,891 | $0 | $0 | | |
|
| 602 | | CONCRETE TRAINING PAD FOR COMMERICAL TRUCK DRIVING PROGRAM | | | | | | ACADIA | |
|
| GENERAL OBLIGATION BONDS | 238,032 | 0 | | 238,032 | 0 | 0 | | |
|
| | $238,032 | $0 | | $238,032 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $372,384 | $342,733 | | $715,117 | $0 | $0 | | |
|
| AGENCY: 754 OAKDALE TECHNICAL COLLEGE | | | | | | | | | |
|
| 593 | | RESURFACING OF PARKING LOT | | | | | | ALLEN | | 5
|
| GENERAL OBLIGATION BONDS | 212,760 | 0 | | 212,760 | 0 | 0 | | |
|
| | $212,760 | $0 | | $212,760 | $0 | $0 | | |
|
| 594 | | BUILDING/PORTABLE CLASSROOM | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS | 90,000 | 0 | | 90,000 | 0 | 0 | | |
|
| | $90,000 | $0 | | $90,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $302,760 | $0 | | $302,760 | $0 | $0 | | |
|
| AGENCY: 761 ALEXANDRIA REG TECH COLLEGE | | | | | | | | | |
|
| 556 | | TRADE & INDUSTRY FACILITIES | | | | | | RAPIDES | |
|
| GENERAL OBLIGATION BONDS | 458,362 | 5,631,982 | | 6,090,344 | 0 | 0 | | |
|
| | $458,362 | $5,631,982 | | $6,090,344 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $458,362 | $5,631,982 | | $6,090,344 | $0 | $0 | | |
|
| AGENCY: 762 HUEY P LONG TECHNICAL COLLEGE | | | | | | | | | |
|
| 554 | | NEW SITE/PLANT FOR HUEY P. LONG CAMPUS | | | | | | WINN | | 5
|
| GENERAL OBLIGATION BONDS | 452,850 | 5,831,344 | | 6,284,194 | 0 | 0 | | |
|
| | $452,850 | $5,831,344 | | $6,284,194 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $452,850 | $5,831,344 | | $6,284,194 | $0 | $0 | | |
|
| AGENCY: 764 SHELBY JACKSON TECH COLLEGE | | | | | | | | | |
|
| 607 | | NEW CLASSROOM BUILDING CONSTRUCTION | | | | | | CONCORDIA | |
|
| GENERAL OBLIGATION BONDS | 168,816 | 0 | | 168,816 | 0 | 0 | | |
|
| | $168,816 | $0 | | $168,816 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $168,816 | $0 | | $168,816 | $0 | $0 | | |
|
| AGENCY: 771 SHREVEPORT REG TECH COLLEGE | | | | | | | | | |
|
| 611 | | AIRCONDITIONING REPLACEMENT: BUILDINGS A, D, E, B, &C | | | | | | CADDO | |
|
| REAPPROPRIATED CASH | 2,410,000 | 0 | | 2,410,000 | 0 | 0 | | |
|
| | $2,410,000 | $0 | | $2,410,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $2,410,000 | $0 | | $2,410,000 | $0 | $0 | | |
|
| AGENCY: 772 NORTHWEST LA TECHNICAL COLLEGE | | | | | | | | | |
|
| 572 | | NEW NORTHWEST LOUISIANA TECHNICAL COLLEGE CAMPUS | | | | | | WEBSTER | |
|
| STATE GENERAL FUND (DIRECT) | 1,500,000 | 16,500,000 | | 18,000,000 | 0 | 0 | | |
|
| | $1,500,000 | $16,500,000 | | $18,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,500,000 | $16,500,000 | | $18,000,000 | $0 | $0 | | |
|
| AGENCY: 773 NATCHITOCHES TECHNICAL COLLEGE | | | | | | | | | |
|
| 1625 | | AIR CONDITIONING SYSTEM REPLACEMENT, CONSTRUCTION (SUPPLEMENTAL FUNDING) | | | | | | NATCHITOCHES | |
|
| GENERAL OBLIGATION BONDS PRIORITY 2 | | 0 | | 0 | 210,000 | 0 | | |
|
| | $0 | $0 | | $0 | $210,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $210,000 | $0 | | |
|
| AGENCY: 776 RUSTON TECHNICAL COLLEGE | | | | | | | | | |
|
| 573 | | CLASSROOM ADDITIONS AND COMPLETE REPLACMENT OF AIR CONDITIONING UNIT - PLANNING & CONSTRUCTION | | | | | | LINCOLN | |
|
| STATE GENERAL FUND (DIRECT) | | 82,084 | | 82,084 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,456,104 | 0 | | 1,456,104 | 0 | 0 | | |
|
| | $1,456,104 | $82,084 | | $1,538,188 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,456,104 | $82,084 | | $1,538,188 | $0 | $0 | | |
|
| AGENCY: 782 NORTHEAST LA TECHNICAL COLLEGE | | | | | | | | | |
|
| 558 | | PURCHASE BUILDING AND LAND | | | | | | FRANKLIN | |
|
| GENERAL OBLIGATION BONDS | 301,800 | 0 | | 301,800 | 0 | 0 | | |
|
| | $301,800 | $0 | | $301,800 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $301,800 | $0 | | $301,800 | $0 | $0 | | |
|
| AGENCY: 784 TALLULAH TECHNICAL COLLEGE | | | | | | | | | |
|
| 591 | | HEALTH OCCUPATIONS FACILITY PLANNING AND CONSTRUCTION | | | | | | MADISON | | 5
|
| STATE GENERAL FUND (DIRECT) | 146,000 | 1,276,000 | | 1,422,000 | 0 | 0 | | |
|
| | $146,000 | $1,276,000 | | $1,422,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $146,000 | $1,276,000 | | $1,422,000 | $0 | $0 | | |
|
| AGENCY: 786 BASTROP TECHNICAL COLLEGE | | | | | | | | | |
|
| 592 | | TECHNICAL EDUCATION BUILDING AND WELDING SHOP ADDITION | | | | | | MOREHOUSE | |
|
| STATE GENERAL FUND (DIRECT) | 115,000 | 0 | | 115,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,487,960 | 0 | | 1,487,960 | 0 | 0 | | |
|
| | $1,602,960 | $0 | | $1,602,960 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,602,960 | $0 | | $1,602,960 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 295 | | | | | | | | |
|
| DEPARTMENT TOTAL | $333,293,671 | $778,794,935 | | $1,112,088,606 | $221,624,267 | $0 | | |
|
| 23 JUDICAL EXPENSES | | | | | | | | | |
|
| AGENCY: 949 LOUISIANA JUDICIARY | | | | | | | | | |
|
| 631 | | LOUISIANA FIFTH CIRCUIT COURT OF APPEAL COURTHOUSE, CONSTRUCTION | | | | | | JEFFERSON | | 5
|
| FEES AND SELF GENERATED REVENUES | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 6,100,000 | | 6,100,000 | 0 | 0 | | |
|
| | $500,000 | $6,100,000 | | $6,600,000 | $0 | $0 | | |
|
| 633 | | RENOVATION OF 400 ROYAL STREET BLDG FOR THE SUPREME COURT, 4TH CIRCUIT COURT OF APPEAL | | | | | | ORLEANS | |
|
| GENERAL OBLIGATION BONDS | 9,234,999 | 11,286,000 | | 20,520,999 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,500,000 | 0 | | |
|
| | $9,234,999 | $11,286,000 | | $20,520,999 | $1,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $9,734,999 | $17,386,000 | | $27,120,999 | $1,500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 2 | | | | | | | | |
|
| DEPARTMENT TOTAL | $9,734,999 | $17,386,000 | | $27,120,999 | $1,500,000 | $0 | | |
|
| 36 LEVEE DISTRICTS & PORTS | | | | | | | | | |
|
| AGENCY: L08 LAKE BORGNE BASIN LEVEE DIST | | | | | | | | | |
|
| 1037 | | CANAL BANK STABILIZATION PLANNING AND CONSTRUCTION FLOOD PREVENTION | | | | | | ST. BERNARD | | 2
|
| GENERAL OBLIGATION BONDS | 1,200,000 | 0 | | 1,200,000 | 0 | 0 | | |
|
| | $1,200,000 | $0 | | $1,200,000 | $0 | $0 | | |
|
| 1038 | | FLOODING AND DRAINAGE IMPROVEMENTS PLANNING AND CONSTRUCTION | | | | | | ST. BERNARD | | 2
|
| GENERAL OBLIGATION BONDS | 200,000 | 0 | | 200,000 | 0 | 0 | | |
|
| | $200,000 | $0 | | $200,000 | $0 | $0 | | |
|
| 1039 | | EICKES CANAL RAILROAD & LA HWY 46 CROSSINGS | | | | | | ST. BERNARD | | 2
|
| GENERAL OBLIGATION BONDS | 1,200,000 | 1,200,000 | | 2,400,000 | 0 | 0 | | |
|
| | $1,200,000 | $1,200,000 | | $2,400,000 | $0 | $0 | | |
|
| 1654 | | TIDAL FLOOD PROTECTION FOR REGGIO / FLORISANT AREA | | | | | | ST. BERNARD | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $0 | $0 | | $0 | $500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $2,600,000 | $1,200,000 | | $3,800,000 | $500,000 | $0 | | |
|
| AGENCY: L10 ORLEANS LEVEE DISTRICT | | | | | | | | | |
|
| 1003 | | EAST LAKEFRONT LINEAR PARK AND BIKEWAY PLANNING | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 125,000 | 0 | | 125,000 | 0 | 0 | | |
|
| | $125,000 | $0 | | $125,000 | $0 | $0 | | |
|
| 1004 | | LINCOLN BEACH INVESTIGATION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 75,000 | 0 | | 75,000 | 0 | 0 | | |
|
| | $75,000 | $0 | | $75,000 | $0 | $0 | | |
|
| 1005 | | BULKHEAD FLOOD PROTECTION REPAIR AT ORLEANS MARINA LAKE MARINA AVENUE | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 1,781,520 | | 3,281,520 | 0 | 0 | | |
|
| | $1,500,000 | $1,781,520 | | $3,281,520 | $0 | $0 | | |
|
| 1006 | | US 11 FLOODGATE AND US 90 LEVEE ROAD RAISING PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 0 | | 1,500,000 | 0 | 0 | | |
|
| | $1,500,000 | $0 | | $1,500,000 | $0 | $0 | | |
|
| 1007 | | BULKHEAD FLOOD PROTECTION REPAIR AT NEW ORLEANS LAKEFRONT AIRPORT NORTHEAST QUADRANT | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 20,000,000 | 0 | | 20,000,000 | 0 | 0 | | |
|
| | $20,000,000 | $0 | | $20,000,000 | $0 | $0 | | |
|
| 1008 | | SEAWALL FLOOD PROTECTION MODIFICATION AT LAKESHORE DRIVE | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 21,000,000 | 0 | | 21,000,000 | 0 | 0 | | |
|
| | $21,000,000 | $0 | | $21,000,000 | $0 | $0 | | |
|
| 1009 | | SEABROOK PARK BOAT LAUNCH PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 650,000 | 0 | | 650,000 | 0 | 0 | | |
|
| | $650,000 | $0 | | $650,000 | $0 | $0 | | |
|
| 1010 | | DEVELOPMENT OF LARGE BOAT SLIPS / DOCKS AND HANDICAPPED ACCESS SOUTH SHORE HARBOR PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 1,017,000 | 0 | | 1,017,000 | 0 | 0 | | |
|
| | $1,017,000 | $0 | | $1,017,000 | $0 | $0 | | |
|
| 1011 | | LAKEFRONT AIRPORT EXTENSION OF NORTH-SOUTH RUNWAY PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 36,000,000 | 0 | | 36,000,000 | 0 | 0 | | |
|
| | $36,000,000 | $0 | | $36,000,000 | $0 | $0 | | |
|
| 1012 | | ORLEANS LEVEE DISTRICT, NEW POLICE STATION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 700,000 | 0 | | 700,000 | 0 | 0 | | |
|
| | $700,000 | $0 | | $700,000 | $0 | $0 | | |
|
| 1013 | | EAST BEACH PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 500,000 | 5,500,000 | | 6,000,000 | 0 | 0 | | |
|
| | $500,000 | $5,500,000 | | $6,000,000 | $0 | $0 | | |
|
| 1014 | | LAKEFRONT AIRPORT, NEW T-HANGARS PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 0 | | 2,000,000 | 0 | 0 | | |
|
| | $2,000,000 | $0 | | $2,000,000 | $0 | $0 | | |
|
| 1015 | | LAKEFRONT AIRPORT, FIRE STATION EXPANSION PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 250,000 | 0 | | 250,000 | 0 | 0 | | |
|
| | $250,000 | $0 | | $250,000 | $0 | $0 | | |
|
| 1016 | | LAKEFRONT AIRPORT, SECURITY AND FENCING PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 150,000 | 0 | | 150,000 | 0 | 0 | | |
|
| | $150,000 | $0 | | $150,000 | $0 | $0 | | |
|
| 1017 | | LAKEFRONT AIRPORT, JETWAY CONNECTOR FOR TERMINAL PLANNING AND CONSTRUCTION | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 100,000 | 0 | | 100,000 | 0 | 0 | | |
|
| | $100,000 | $0 | | $100,000 | $0 | $0 | | |
|
| 1018 | | LAKEFRONT AIRPORT, RESURFACING OF NORTH-SOUTH RUNWAY, RESEAL OF BRAVO TAXIWAY | | | | | | ORLEANS | | 2
|
| GENERAL OBLIGATION BONDS | 1,700,000 | 0 | | 1,700,000 | 0 | 0 | | |
|
| | $1,700,000 | $0 | | $1,700,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 16 | | | | | | | | |
|
| AGENCY TOTAL | $87,267,000 | $7,281,520 | | $94,548,520 | $0 | $0 | | |
|
| AGENCY: L16 SOUTH LAFOURCHE LEVEE DISTRICT | | | | | | | | | |
|
| 1399 | | LAROSE TO GOLDEN MEADOW HURRICANE PROTECTION PROJECT, SOUTHERN PART OF LAFOURCHE PARISH | | | | | | LAFOURCHE | | 2
|
| FEDERAL FUNDS | 550,000 | 3,600,000 | | 4,150,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 4,100,000 | 0 | | 4,100,000 | 0 | 0 | | |
|
| | $4,650,000 | $3,600,000 | | $8,250,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $4,650,000 | $3,600,000 | | $8,250,000 | $0 | $0 | | |
|
| AGENCY: L21 EAST JEFFERSON LEVEE DISTRICT | | | | | | | | | |
|
| 1046 | | JEFFERSON LAKEFRONT LINEAR PARK IMPROVEMENTS PLANNING AND CONSTRUCTION | | | | | | JEFFERSON | | 2
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 3,140,000 | | 4,140,000 | 0 | 0 | | |
|
| | $1,000,000 | $3,140,000 | | $4,140,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,000,000 | $3,140,000 | | $4,140,000 | $0 | $0 | | |
|
| AGENCY: L25 GRAND ISLE INDPT LEVEE DSTRT | | | | | | | | | |
|
| 1150 | | BREAKWATER FOR PROTECTION OF GRAND ISLE | | | | | | JEFFERSON | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,800,000 | 0 | | 1,800,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| | $2,400,000 | $0 | | $2,400,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $2,400,000 | $0 | | $2,400,000 | $0 | $0 | | |
|
| AGENCY: P01 ABBEVILLE HARBOR & TERM DIST | | | | | | | | | |
|
| 1318 | | FRESHWATER BAYOU LOCKS BY-PASS CHANNEL | | | | | | VERMILION | | 2
|
| GENERAL OBLIGATION BONDS | 240,000 | 720,000 | | 960,000 | 0 | 0 | | |
|
| | $240,000 | $720,000 | | $960,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $240,000 | $720,000 | | $960,000 | $0 | $0 | | |
|
| AGENCY: P03 GREATER BATON ROUGE PORT COMM | | | | | | | | | |
|
| 1112 | | GREATER BATON ROUGE PORT COMM. MAJOR IMPROVEMENTS/RENOVATION PROJECTS | | | | | | WEST BATON ROUGE | | 2
|
| GENERAL OBLIGATION BONDS | 4,000,000 | 3,100,000 | | 7,100,000 | 0 | 0 | | |
|
| | $4,000,000 | $3,100,000 | | $7,100,000 | $0 | $0 | | |
|
| 1113 | | GREATER BATON ROUGE PORT COMMISSION MAJOR IMPROVEMENTS/RENOVATION PROJECTS | | | | | | WEST BATON ROUGE | | 2
|
| GENERAL OBLIGATION BONDS | 2,004,000 | 3,096,000 | | 5,100,000 | 0 | 0 | | |
|
| | $2,004,000 | $3,096,000 | | $5,100,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $6,004,000 | $6,196,000 | | $12,200,000 | $0 | $0 | | |
|
| AGENCY: P06 TWIN PARISH PORT COMMISSION | | | | | | | | | |
|
| 1363 | | BULKHEADING & DREDGING PROJECT AT TWIN PARISH PORT | | | | | | IBERIA | |
|
| GENERAL OBLIGATION BONDS | 1,500,000 | 0 | | 1,500,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 500,000 | 0 | | |
|
| | $1,500,000 | $0 | | $1,500,000 | $500,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,500,000 | $0 | | $1,500,000 | $500,000 | $0 | | |
|
| AGENCY: P12 LAKE PROVIDENCE PORT COMM | | | | | | | | | |
|
| 1268 | | LAKE PROVIDENCE PORT INDUSTRIAL PARK IMPROVEMENTS-HYDRAULIC LANDFILL | | | | | | | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,166,000 | 0 | | 1,166,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 106,000 | 0 | | 106,000 | 0 | 0 | | |
|
| | $1,272,000 | $0 | | $1,272,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,272,000 | $0 | | $1,272,000 | $0 | $0 | | |
|
| AGENCY: P16 PORT OF IBERIA | | | | | | | | | |
|
| 1125 | | 100 ACRE PORT WATERFRONT EXPANSION, PLANNING AND CONSTRUCTION. | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 2,363,200 | 0 | | 2,363,200 | 0 | 0 | | |
|
| | $2,363,200 | $0 | | $2,363,200 | $0 | $0 | | |
|
| 1126 | | PORT OF IBERIA MARINA AND BULKHEAD IMPROVEMENTS, PLANNING AND CONSTRUCTION | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 762,000 | 0 | | 762,000 | 0 | 0 | | |
|
| | $762,000 | $0 | | $762,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $3,125,200 | $0 | | $3,125,200 | $0 | $0 | | |
|
| AGENCY: P17 PORT OF NEW ORLEANS | | | | | | | | | |
|
| 1322 | | NAPOLEON / MILAN WHARF EXTENSION AND DECK COMPLETION | | | | | | ORLEANS | | 2
|
| OTHER AND LOCAL FUNDS | 720,603 | 6,485,427 | | 7,206,030 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 7,206,030 | 0 | | 7,206,030 | 0 | 0 | | |
|
| | $7,926,633 | $6,485,427 | | $14,412,060 | $0 | $0 | | |
|
| 1323 | | LASH FACILITY DEVELOPMENT | | | | | | MULTIPLE | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,260,000 | 1,260,000 | | 2,520,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 1,260,000 | 1,260,000 | | 2,520,000 | 0 | 0 | | |
|
| | $2,520,000 | $2,520,000 | | $5,040,000 | $0 | $0 | | |
|
| 1324 | | NASHVILLE AVENUE TERMINAL IMPROVEMENTS, ($4,450,000 LOCAL MATCH) | | | | | | ORLEANS | |
|
| FEES AND SELF GENERATED REVENUES | 5,340,000 | 0 | | 5,340,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 5,340,000 | 0 | | 5,340,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 4,000,000 | 0 | | |
|
| | $10,680,000 | $0 | | $10,680,000 | $4,000,000 | $0 | | |
|
| 1325 | | PUBLIC COMMODITY WAREHOUSE REDEVELOPMENT | | | | | | ORLEANS | | 2
|
| FEES AND SELF GENERATED REVENUES | 2,280,000 | 0 | | 2,280,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,280,000 | 0 | | 2,280,000 | 0 | 0 | | |
|
| | $4,560,000 | $0 | | $4,560,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $25,686,633 | $9,005,427 | | $34,692,060 | $4,000,000 | $0 | | |
|
| AGENCY: P20 ST BERNARD PORT | | | | | | | | | |
|
| 1040 | | ST. BERNARD PORT INFRASTRUCTURE IMPROVEMENTS PLANNING AND CONSTRUCTION | | | | | | ST. BERNARD | | 2
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 0 | | 2,000,000 | 0 | 0 | | |
|
| | $2,000,000 | $0 | | $2,000,000 | $0 | $0 | | |
|
| 1041 | | ST. BERNARD PORT FACILITY DEVELOPMENT PLANNING AND CONSTRUCTION | | | | | | ST. BERNARD | | 2
|
| GENERAL OBLIGATION BONDS | 3,000,000 | 0 | | 3,000,000 | 0 | 0 | | |
|
| | $3,000,000 | $0 | | $3,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $5,000,000 | $0 | | $5,000,000 | $0 | $0 | | |
|
| AGENCY: P21 SOUTH LA PORT COMMISSION | | | | | | | | | |
|
| 1338 | | COLD STORAGE WAREHOUSE AT THE GLOBALPLEX INTERMODAL TERMINAL PORT OF SOUTH LOUISIANA | | | | | | ST. JOHN THE BAPTIST | | 2
|
| GENERAL OBLIGATION BONDS | 4,000,000 | 0 | | 4,000,000 | 0 | 0 | | |
|
| | $4,000,000 | $0 | | $4,000,000 | $0 | $0 | | |
|
| 1339 | | WAREHOUSE AT GLOBALPLEX INTERMODAL TERMINAL GENERAL CARGO DOCK PORT OF SOUTH LOUISIANA | | | | | | ST. JOHN THE BAPTIST | | 2
|
| OTHER AND LOCAL FUNDS | 805,000 | 0 | | 805,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 4,000,000 | 0 | | 4,000,000 | 0 | 0 | | |
|
| | $4,805,000 | $0 | | $4,805,000 | $0 | $0 | | |
|
| 1340 | | APRON ADDITION TO THE GLOBALPLEX GENERAL CARGO DOCK PORT OF SOUTH LOUISIANA | | | | | | ST. JOHN THE BAPTIST | | 2
|
| OTHER AND LOCAL FUNDS | 1,002,392 | 0 | | 1,002,392 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 3,007,176 | 0 | | 3,007,176 | 0 | 0 | | |
|
| | $4,009,568 | $0 | | $4,009,568 | $0 | $0 | | |
|
| 1341 | | RAIL INFRASTRUCTURE REHABILITATION GLOBALPLEX INTERMODAL TERMINAL PORT OF SOUTH LOUISIANA | | | | | | | | 2
|
| FEDERAL FUNDS | 466,890 | 0 | | 466,890 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 312,000 | 0 | | 312,000 | 0 | 0 | | |
|
| | $778,890 | $0 | | $778,890 | $0 | $0 | | |
|
| 1342 | | GLOBALPLEX INTERMODAL TERMINAL MULTI-USE PORT FACILITY PORT OF SOUTH LOUISIANA | | | | | | ST. JOHN THE BAPTIST | | 2
|
| GENERAL OBLIGATION BONDS | 4,000,000 | 0 | | 4,000,000 | 0 | 0 | | |
|
| | $4,000,000 | $0 | | $4,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $17,593,458 | $0 | | $17,593,458 | $0 | $0 | | |
|
| AGENCY: P23 TERREBONNE PORT COMMISSION | | | | | | | | | |
|
| 1184 | | TERREBONNE PORT CONSTRUCTION | | | | | | | | 2
|
| OTHER AND LOCAL FUNDS | 1,000,000 | 2,320,000 | | 3,320,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,000,000 | 2,320,000 | | 3,320,000 | 0 | 0 | | |
|
| | $2,000,000 | $4,640,000 | | $6,640,000 | $0 | $0 | | |
|
| 1397 | | PORT DEVELOPMENT (PHASE 1), CLEARING, DREDGING, DRAINAGE, UTILITIES AND ROADS, CONSTRUCTION ($3,900,000) (LOCAL MATCH) | | | | | | TERREBONE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,900,000 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 5 | | 0 | | 0 | 1,000,000 | 0 | | |
|
| | $0 | $0 | | $0 | $3,900,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $2,000,000 | $4,640,000 | | $6,640,000 | $3,900,000 | $0 | | |
|
| AGENCY: P26 PORT OF LAKE CHARLES | | | | | | | | | |
|
| 1365 | | PORT INFRASTRUCTURE IMPROVEMENTS AT CITY DOCKS- PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | | 2
|
| FEES AND SELF GENERATED REVENUES | 1,400,000 | 3,220,000 | | 4,620,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,400,000 | 3,220,000 | | 4,620,000 | 0 | 0 | | |
|
| | $2,800,000 | $6,440,000 | | $9,240,000 | $0 | $0 | | |
|
| 1398 | | PORT INDUSTRIAL PARK EAST, CONSTRUCTION ($4,900,000 LOCAL MATCH) | | | | | | CALCASIEU | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 2,800,000 | 0 | | |
|
| | $0 | $0 | | $0 | $2,800,000 | $0 | | |
|
| 1414 | | AUTOMATED BAG LOADING SYSTEM AT CITY DOCKS, PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | | 2
|
| STATE GENERAL FUND (DIRECT) | 3,000,000 | 3,000,000 | | 6,000,000 | 0 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 17,000,000 | 9,660,000 | | 26,660,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 5,000,000 | 0 | | 5,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 15,000,000 | 10,660,000 | | 25,660,000 | 0 | 0 | | |
|
| | $40,000,000 | $23,320,000 | | $63,320,000 | $0 | $0 | | |
|
| 1415 | | INTERMODAL FREIGHT STATION AT CITY DOCKS, PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | | 2
|
| FEES AND SELF GENERATED REVENUES | 2,000,000 | 3,003,400 | | 5,003,400 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 2,000,000 | 3,003,400 | | 5,003,400 | 0 | 0 | | |
|
| | $4,000,000 | $6,006,800 | | $10,006,800 | $0 | $0 | | |
|
| 1416 | | DREDGING AT CITY DOCKS, PLANNING AND CONSTRUCTION | | | | | | CALCASIEU | | 2
|
| STATE GENERAL FUND (DIRECT) | 480,000 | 0 | | 480,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 480,000 | 0 | | 480,000 | 0 | 0 | | |
|
| | $960,000 | $0 | | $960,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 5 | | | | | | | | |
|
| AGENCY TOTAL | $47,760,000 | $35,766,800 | | $83,526,800 | $2,800,000 | $0 | | |
|
| AGENCY: P34 WEST ST MARY PARISH PORT | | | | | | | | | |
|
| 1336 | | BULKHEAD, LAUNCH RAILS, AND SITE IMPROVEMENTS | | | | | | ST. MARY | | 2
|
| STATE GENERAL FUND (DIRECT) | 990,000 | 0 | | 990,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 315,000 | 0 | | 315,000 | 0 | 0 | | |
|
| | $1,305,000 | $0 | | $1,305,000 | $0 | $0 | | |
|
| 1337 | | LAND AQUISITION FOR EXPANSION OF PORT FACILITY | | | | | | ST. MARY | | 2
|
| STATE GENERAL FUND (DIRECT) | 600,000 | 0 | | 600,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | 120,000 | 0 | | 120,000 | 0 | 0 | | |
|
| | $720,000 | $0 | | $720,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $2,025,000 | $0 | | $2,025,000 | $0 | $0 | | |
|
| AGENCY: P38 NATCHITOCHES PARISH PORT | | | | | | | | | |
|
| 1655 | | RELOCATION OF LA. HIGHWAY 486 AT THE NATCHITOCHES PARISH PORT NEAR ITS INTERSECTION WITH LA. HIGHWAY 6 (0.8 MILES) | | | | | | NATCHITOCHES | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,800,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,800,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $1,800,000 | $0 | | |
|
| AGENCY: P39 PLAQUEMINES PARISH PORT | | | | | | | | | |
|
| 1055 | | LAND ACQUISITION AND INFRASTRUCTURE IMPROVEMENTS PLANNING AND CONSTRUCTION | | | | | | PLAQUEMINES | | 2
|
| GENERAL OBLIGATION BONDS | 125,000 | 4,875,000 | | 5,000,000 | 0 | 0 | | |
|
| | $125,000 | $4,875,000 | | $5,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $125,000 | $4,875,000 | | $5,000,000 | $0 | $0 | | |
|
| AGENCY: P40 GRAND ISLE PORT COMMISSION | | | | | | | | | |
|
| 1000 | | DREDGING OF BAYOU RIGAUD AND BARATARIA PASS. | | | | | | JEFFERSON | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,000,000 | 1,000,000 | | 2,000,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 3,000,000 | | 3,000,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | | 1,000,000 | | 1,000,000 | 0 | 0 | | |
|
| | $1,000,000 | $5,000,000 | | $6,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $1,000,000 | $5,000,000 | | $6,000,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR DEPARTMENT = 53 | | | | | | | | |
|
| DEPARTMENT TOTAL | $211,248,291 | $81,424,747 | | $292,673,038 | $13,500,000 | $0 | | |
|
| 50 MISCELLANEOUS NON-STATE | | | | | | | | | |
|
| AGENCY: J02 ALLEN PARISH | | | | | | | | | |
|
| 1656 | | CARPENTER'S BRIDGE RECREATION AREA, PLANNING, ACQUISITION AND CONSTRUCTION | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 250,000 | 0 | | |
|
| | $0 | $0 | | $0 | $250,000 | $0 | | |
|
| 1657 | | PARISH HEALTH UNITS, PLANNING, ACQUISITION AND CONSTRUCTION | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 1,200,000 | 0 | | |
|
| | $0 | $0 | | $0 | $1,200,000 | $0 | | |
|
| 1658 | | SIMMESPORT RIVER LANDING PHASE II, LAND ACQUISITION, PLANNING AND CONSTRUCTION | | | | | | ALLEN | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 265,000 | 0 | | |
|
| | $0 | $0 | | $0 | $265,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 3 | | | | | | | | |
|
| AGENCY TOTAL | $0 | $0 | | $0 | $1,715,000 | $0 | | |
|
| AGENCY: J04 ASSUMPTION PARISH | | | | | | | | | |
|
| 1417 | | ASSUMPTION PARISH COURTHOUSE RENOVATIONS, PLANNING AND CONSTRUCTION | | | | | | ASSUMPTION | | 2
|
| STATE GENERAL FUND (DIRECT) | 309,000 | 0 | | 309,000 | 0 | 0 | | |
|
| | $309,000 | $0 | | $309,000 | $0 | $0 | | |
|
| 1418 | | BRUIE LABADIEVILLE DRAINAGE PROJECT - CANAL CONSTRUCTION AND PROPERTY ACQUISITION | | | | | | ASSUMPTION | | 2
|
| STATE GENERAL FUND (DIRECT) | 150,061 | 0 | | 150,061 | 0 | 0 | | |
|
| | $150,061 | $0 | | $150,061 | $0 | $0 | | |
|
| 1419 | | BAYOU L'OURSE RECREATION PARK LAND ACQUISITION AND CONSTRUCTION LA HIGHWAY 662, BAYOU L'OURSE, LA | | | | | | ASSUMPTION | | 2
|
| STATE GENERAL FUND (DIRECT) | 232,050 | 0 | | 232,050 | 0 | 0 | | |
|
| | $232,050 | $0 | | $232,050 | $0 | $0 | | |
|
| 1421 | | DORSEYVILLE RECREATION CONSTRUCTION AND EQUIPMENT PURCHASE | | | | | | ASSUMPTION | | 2
|
| STATE GENERAL FUND (DIRECT) | 62,800 | 0 | | 62,800 | 0 | 0 | | |
|
| FEDERAL FUNDS | 22,800 | 0 | | 22,800 | 0 | 0 | | |
|
| | $85,600 | $0 | | $85,600 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $776,711 | $0 | | $776,711 | $0 | $0 | | |
|
| AGENCY: J05 AVOYELLES PARISH | | | | | | | | | |
|
| 1422 | | RECONSTRUCTION OF MOREAUVILLE/PLAUCHEVILLE ROAD - PHASE II | | | | | | AVOYELLES | | 2
|
| STATE GENERAL FUND (DIRECT) | 810,000 | 0 | | 810,000 | 0 | 0 | | |
|
| | $810,000 | $0 | | $810,000 | $0 | $0 | | |
|
| 1423 | | COMMERCIAL DOCKING FACILITY, PHASE II SIMMESPORT, LA | | | | | | AVOYELLES | | 2
|
| GENERAL OBLIGATION BONDS | 268,000 | 0 | | 268,000 | 0 | 0 | | |
|
| | $268,000 | $0 | | $268,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $1,078,000 | $0 | | $1,078,000 | $0 | $0 | | |
|
| AGENCY: J06 BEAUREGARD PARISH | | | | | | | | | |
|
| 1129 | | BEAUREGARD PARISH DERIDDER BY-PASS- FINAL PLANNING AND CONSTRUCTION, RIGHT OF WAY, AND UTILITIES | | | | | | BEAUREGARD | | 2
|
| GENERAL OBLIGATION BONDS | 522,000 | 18,454,720 | | 18,976,720 | 0 | 0 | | |
|
| | $522,000 | $18,454,720 | | $18,976,720 | $0 | $0 | | |
|
| 1659 | | CIVIC CENTER AND COVERED ARENA, PLANNING AND CONSTRUCTION | | | | | | BEAUREGARD | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 3,850,000 | 0 | | |
|
| | $0 | $0 | | $0 | $3,850,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $522,000 | $18,454,720 | | $18,976,720 | $3,850,000 | $0 | | |
|
| AGENCY: J08 BOSSIER PARISH | | | | | | | | | |
|
| 1236 | | BOSSIER PARISH PUBLIC HEALTH BUILDING PLANNING AND RENOVATION | | | | | | BOSSIER | | 2
|
| OTHER AND LOCAL FUNDS | 69,922 | 458,105 | | 528,027 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 161,000 | 1,071,000 | | 1,232,000 | 0 | 0 | | |
|
| | $230,922 | $1,529,105 | | $1,760,027 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $230,922 | $1,529,105 | | $1,760,027 | $0 | $0 | | |
|
| AGENCY: J09 CADDO PARISH | | | | | | | | | |
|
| 1292 | | CADDO PARISH JUVENILE DETENTION FACILITY EXPANSION | | | | | | CADDO | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,700,000 | 3,300,000 | | 5,000,000 | 0 | 0 | | |
|
| | $1,700,000 | $3,300,000 | | $5,000,000 | $0 | $0 | | |
|
| 1293 | | CADDO PARISH COURTHOUSE FIRE STAIRWELL CONSTRUCTION AND RENOVATIONS | | | | | | CADDO | | 2
|
| STATE GENERAL FUND (DIRECT) | 900,000 | 0 | | 900,000 | 0 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 1,900,000 | 0 | | 1,900,000 | 0 | 0 | | |
|
| | $2,800,000 | $0 | | $2,800,000 | $0 | $0 | | |
|
| 1294 | | CADDO CORRECTIONAL CENTER - FOUR NEW HOUSING PODS CONSTRUCTION | | | | | | CADDO | | 2
|
| STATE GENERAL FUND (DIRECT) | 170,000 | 16,830,000 | | 17,000,000 | 0 | 0 | | |
|
| | $170,000 | $16,830,000 | | $17,000,000 | $0 | $0 | | |
|
| 1400 | | COMMUNITY WOMEN'S HEALTH CENTER (NORTHWEST LOUISIANA BREAST CANCER DETECTION CENTER) LAND AND BUILDING ACQUISITION, PLANNING, CONSTRUCTION, RENOVATION, AND EQUIPMENT | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 600,000 | 0 | | |
|
| | $0 | $0 | | $0 | $600,000 | $0 | | |
|
| 1660 | | CADDO PINE ISLAND OIL AND HISTORICAL SOCIETY MUSEUM, CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 100,000 | 0 | | |
|
| | $0 | $0 | | $0 | $100,000 | $0 | | |
|
| 1661 | | DAVID BROWN PUMPS, PLANNING, ACQUISITION AND CONSTRUCTION | | | | | | CADDO | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 50,000 | 0 | | |
|
| | $0 | $0 | | $0 | $50,000 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $4,670,000 | $20,130,000 | | $24,800,000 | $750,000 | $0 | | |
|
| AGENCY: J10 CALCASIEU PARISH | | | | | | | | | |
|
| 1424 | | LINCOLN STREET DRAINAGE LATERAL | | | | | | CALCASIEU | | 2
|
| OTHER AND LOCAL FUNDS | 30,000 | 0 | | 30,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 270,000 | 0 | | 270,000 | 0 | 0 | | |
|
| | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $300,000 | $0 | | $300,000 | $0 | $0 | | |
|
| AGENCY: J11 CALDWELL PARISH | | | | | | | | | |
|
| 1248 | | BAYOU DECHENE RESERVOIR, PLANNING, LAND ACQUISITION AND CONSTRUCTION | | | | | | CALDWELL | |
|
| GENERAL OBLIGATION BONDS | 2,500,000 | 3,500,000 | | 6,000,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 7,000,000 | 0 | | |
|
| | $2,500,000 | $3,500,000 | | $6,000,000 | $7,000,000 | $0 | | |
|
| 1249 | | CALDWELL PARISH MULTI-PURPOSE RESOURCE CENTER | | | | | | CALDWELL | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,590,000 | 0 | | 1,590,000 | 0 | 0 | | |
|
| | $1,590,000 | $0 | | $1,590,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 2 | | | | | | | | |
|
| AGENCY TOTAL | $4,090,000 | $3,500,000 | | $7,590,000 | $7,000,000 | $0 | | |
|
| AGENCY: J12 CAMERON PARISH | | | | | | | | | |
|
| 1240 | | PHASE I - JETTY FISHING PIER PROJECT CONSTRUCTION OF A FISHING PIER OVER EXISTING JETTIES | | | | | | CAMERON | | 2
|
| STATE GENERAL FUND (DIRECT) | 570,008 | 0 | | 570,008 | 0 | 0 | | |
|
| | $570,008 | $0 | | $570,008 | $0 | $0 | | |
|
| 1241 | | PHASE 2 - JETTY FISHING PIER PROJECT PARKING & SITE PREPARATION | | | | | | CAMERON | | 2
|
| STATE GENERAL FUND (DIRECT) | 85,500 | 0 | | 85,500 | 0 | 0 | | |
|
| | $85,500 | $0 | | $85,500 | $0 | $0 | | |
|
| 1242 | | PHASE 3 - JETTY FISHING PIER PROJECT CONSTRUCTION OF JETTY FISHING PIER AMENITIES | | | | | | CAMERON | | 2
|
| STATE GENERAL FUND (DIRECT) | 300,300 | 0 | | 300,300 | 0 | 0 | | |
|
| | $300,300 | $0 | | $300,300 | $0 | $0 | | |
|
| 1243 | | HACKBERRY SANITATION SEWERAGE SYSTEM | | | | | | CAMERON | | 2
|
| STATE GENERAL FUND (DIRECT) | | 500,000 | | 500,000 | 0 | 0 | | |
|
| FEDERAL FUNDS | | 3,000,000 | | 3,000,000 | 0 | 0 | | |
|
| OTHER AND LOCAL FUNDS | | 568,000 | | 568,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | | 1,500,000 | | 1,500,000 | 0 | 0 | | |
|
| | $0 | $5,568,000 | | $5,568,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $955,808 | $5,568,000 | | $6,523,808 | $0 | $0 | | |
|
| AGENCY: J14 CLAIBORNE PARISH | | | | | | | | | |
|
| 1289 | | CLAIBORNE PARISH HEALTH UNIT RENOVATION AND CONSTRUCTION | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 500,000 | 0 | | 500,000 | 0 | 0 | | |
|
| FEES AND SELF GENERATED REVENUES | 400,000 | 0 | | 400,000 | 0 | 0 | | |
|
| | $900,000 | $0 | | $900,000 | $0 | $0 | | |
|
| 1425 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CROWS CREEK | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 167,000 | 0 | | 167,000 | 0 | 0 | | |
|
| | $167,000 | $0 | | $167,000 | $0 | $0 | | |
|
| 1426 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, NEW BRIDGE AT SPANDEES ROAD | | | | | | CALCASIEU | | 2
|
| STATE GENERAL FUND (DIRECT) | 142,000 | 0 | | 142,000 | 0 | 0 | | |
|
| | $142,000 | $0 | | $142,000 | $0 | $0 | | |
|
| 1427 | | CLAIBORNE PARISH BRIDGE IMRPOVEMENTS, CONSTRUCT NEW 76 FT. 4 SPAN BRIDGE | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 141,000 | 0 | | 141,000 | 0 | 0 | | |
|
| | $141,000 | $0 | | $141,000 | $0 | $0 | | |
|
| 1428 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 76' BRIDGE AT CYPRESS ROAD | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 150,000 | 0 | | 150,000 | 0 | 0 | | |
|
| | $150,000 | $0 | | $150,000 | $0 | $0 | | |
|
| 1429 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 114 FT. 6-SPAN BRIDGE AT FLAT LICK ROAD | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 227,000 | 0 | | 227,000 | 0 | 0 | | |
|
| | $227,000 | $0 | | $227,000 | $0 | $0 | | |
|
| 1430 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 38' 2-SPAN BRIDGE OVER DOLE BRANCH | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 99,000 | 0 | | 99,000 | 0 | 0 | | |
|
| | $99,000 | $0 | | $99,000 | $0 | $0 | | |
|
| 1431 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCTION NEW 38 FT. 2-SPAN BRIDGE AT WILL BECK DAVIS | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 99,000 | 0 | | 99,000 | 0 | 0 | | |
|
| | $99,000 | $0 | | $99,000 | $0 | $0 | | |
|
| 1432 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 38 FT. 2-SPAN BRIDGE OVER SUGAR CREEK | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 99,000 | 0 | | 99,000 | 0 | 0 | | |
|
| | $99,000 | $0 | | $99,000 | $0 | $0 | | |
|
| 1434 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 2-SPAN BRIDGE AT KEEN ROAD OVER COX CREEK | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 99,000 | 0 | | 99,000 | 0 | 0 | | |
|
| | $99,000 | $0 | | $99,000 | $0 | $0 | | |
|
| 1435 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 2-SPAN BRIDGE AT SHAW MARSALIS ROAD OVER WHITE CREEK | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 95,000 | 0 | | 95,000 | 0 | 0 | | |
|
| | $95,000 | $0 | | $95,000 | $0 | $0 | | |
|
| 1436 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW BRIDGE AT FELLOWSHIP ROAD | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 100,000 | 0 | | 100,000 | 0 | 0 | | |
|
| | $100,000 | $0 | | $100,000 | $0 | $0 | | |
|
| 1437 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 76 FT. 4-SPAN BRIDGE AT RED ADAMS ROAD OVER MIDDLE FORK BAYOU | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 165,000 | 0 | | 165,000 | 0 | 0 | | |
|
| | $165,000 | $0 | | $165,000 | $0 | $0 | | |
|
| 1438 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCTION NEW 57' 3-SPAN BRIDGE AT HB LEWIS ROAD OVER BOND CREEK | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 140,000 | 0 | | 140,000 | 0 | 0 | | |
|
| | $140,000 | $0 | | $140,000 | $0 | $0 | | |
|
| 1439 | | CLAIRBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 76' 4-SPAN BRIDGE AT MARITZKY DIBBY ROAD | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 173,000 | 0 | | 173,000 | 0 | 0 | | |
|
| | $173,000 | $0 | | $173,000 | $0 | $0 | | |
|
| 1440 | | CLAIBORNE PARISH BRIDGE IMPROVEMENTS, CONSTRUCT NEW 2-SPAN BRIDGE AT BEVERLY THOMPSON ROAD | | | | | | CLAIBORNE | | 2
|
| STATE GENERAL FUND (DIRECT) | 111,000 | 0 | | 111,000 | 0 | 0 | | |
|
| | $111,000 | $0 | | $111,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 16 | | | | | | | | |
|
| AGENCY TOTAL | $2,907,000 | $0 | | $2,907,000 | $0 | $0 | | |
|
| AGENCY: J16 DE SOTO PARISH | | | | | | | | | |
|
| 1278 | | DESOTO PARISH HEALTH UNIT | | | | | | DE SOTO | | 2
|
| OTHER AND LOCAL FUNDS | 100,000 | 0 | | 100,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,404,521 | 0 | | 1,404,521 | 0 | 0 | | |
|
| | $1,504,521 | $0 | | $1,504,521 | $0 | $0 | | |
|
| 1279 | | KEATCHIE - FOUR FORKS ROAD IMPROVEMENTS - PHASE 2 | | | | | | DE SOTO | |
|
| STATE GENERAL FUND (DIRECT) | 90,000 | 0 | | 90,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 160,000 | 0 | | |
|
| | $90,000 | $0 | | $90,000 | $160,000 | $0 | | |
|
| 1280 | | DESOTO PARISH INDUSTRIAL PARK ROAD IMPROVEMENTS | | | | | | DE SOTO | | 2
|
| STATE GENERAL FUND (DIRECT) | 240,000 | 0 | | 240,000 | 0 | 0 | | |
|
| | $240,000 | $0 | | $240,000 | $0 | $0 | | |
|
| 1442 | | PARISHWIDE WATER SYSTEM | | | | | | DE SOTO | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,500,000 | 900,000 | | 2,400,000 | 0 | 0 | | |
|
| | $1,500,000 | $900,000 | | $2,400,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 4 | | | | | | | | |
|
| AGENCY TOTAL | $3,334,521 | $900,000 | | $4,234,521 | $160,000 | $0 | | |
|
| AGENCY: J20 EVANGELINE PARISH | | | | | | | | | |
|
| 1401 | | RECONSTRUCTION OF PARISH ROAD 5-61 | | | | | | EVANGELINE | |
|
| GENERAL OBLIGATION BONDS PRIORITY 1 | | 0 | | 0 | 610,000 | 0 | | |
|
| | $0 | $0 | | $0 | $610,000 | $0 | | |
|
| 1443 | | LA 3187 (CROOKED CREEK ROAD) | | | | | | EVANGELINE | | 2
|
| GENERAL OBLIGATION BONDS | 180,000 | 0 | | 180,000 | 0 | 0 | | |
|
| | $180,000 | $0 | | $180,000 | $0 | $0 | | |
|
| 1444 | | CHANNEL IMPROVEMENTS - BAYOU DECANNES | | | | | | EVANGELINE | | 2
|
| OTHER AND LOCAL FUNDS | 1,176,000 | 0 | | 1,176,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 504,000 | 0 | | 504,000 | 0 | 0 | | |
|
| | $1,680,000 | $0 | | $1,680,000 | $0 | $0 | | |
|
| 1445 | | RECONSTRUCTION OF PARISH RD. 3-127 (TIGER LANE) | | | | | | EVANGELINE | | 2
|
| GENERAL OBLIGATION BONDS | 425,000 | 0 | | 425,000 | 0 | 0 | | |
|
| | $425,000 | $0 | | $425,000 | $0 | $0 | | |
|
| 1446 | | RECONSTRUCTION OF PARISH RD. 4-46 (NINTH ST.) | | | | | | EVANGELINE | | 2
|
| GENERAL OBLIGATION BONDS | 205,000 | 0 | | 205,000 | 0 | 0 | | |
|
| | $205,000 | $0 | | $205,000 | $0 | $0 | | |
|
| 1447 | | RECONSTRUCTION OF PARISH ROAD 10-14, (RIXBY MANUEL RD.) | | | | | | EVANGELINE | | 2
|
| GENERAL OBLIGATION BONDS | 375,000 | 0 | | 375,000 | 0 | 0 | | |
|
| | $375,000 | $0 | | $375,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 6 | | | | | | | | |
|
| AGENCY TOTAL | $2,865,000 | $0 | | $2,865,000 | $610,000 | $0 | | |
|
| AGENCY: J21 FRANKLIN PARISH | | | | | | | | | |
|
| 1108 | | FRANKLIN PARISH POLICE JURY, TURKEY CREEK LAKE IMPROVEMENTS PLANNING AND CONSTRUCTION | | | | | | FRANKLIN | | 2
|
| GENERAL OBLIGATION BONDS | 250,000 | 22,680,000 | | 22,930,000 | 0 | 0 | | |
|
| | $250,000 | $22,680,000 | | $22,930,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 1 | | | | | | | | |
|
| AGENCY TOTAL | $250,000 | $22,680,000 | | $22,930,000 | $0 | $0 | | |
|
| AGENCY: J23 IBERIA PARISH | | | | | | | | | |
|
| 1300 | | HUBERTVILLE ROAD, LA. HWY 85, WIDENING FROM LA. HWY 182 TO U.S. HWY 90. | | | | | | IBERIA | | 2
|
| STATE GENERAL FUND (DIRECT) | 381,700 | 4,265,483 | | 4,647,183 | 0 | 0 | | |
|
| | $381,700 | $4,265,483 | | $4,647,183 | $0 | $0 | | |
|
| 1301 | | IBERIA PARISH AGRICULTURAL ROADS IMPROVEMENT, PLANNING AND CONSTRUCTION. | | | | | | IBERIA | | 2
|
| STATE GENERAL FUND (DIRECT) | 1,808,484 | 0 | | 1,808,484 | 0 | 0 | | |
|
| | $1,808,484 | $0 | | $1,808,484 | $0 | $0 | | |
|
| 1302 | | IBERIA PARISH INDUSTRIAL ROADS IMPROVEMENT, PLANNING AND CONSTRUCTION. THE IMPROVEMENTS WILL INCLUDE CURTIS LANE, LEWIS STREET, PORT ROAD, TED MIGUES ROAD, DARRYL LANDRY ROAD, HOMER HE | | | | | | IBERIA | | 2
|
| STATE GENERAL FUND (DIRECT) | 2,343,916 | 0 | | 2,343,916 | 0 | 0 | | |
|
| | $2,343,916 | $0 | | $2,343,916 | $0 | $0 | | |
|
| 1303 | | TROTTER STREET EXTENSION FROM LEWIS STREET TO EMILE VERRET ROAD, PLANNING AND CONSTRUCTION. | | | | | | IBERIA | | 2
|
| STATE GENERAL FUND (DIRECT) | 70,833 | 779,167 | | 850,000 | 0 | 0 | | |
|
| | $70,833 | $779,167 | | $850,000 | $0 | $0 | | |
|
| 1304 | | BEDMINSTER BIOCONVERSION COMPREHENSIVE MUNICIPAL SOLID WASTE AND SEWERAGE SLUDGE CO-COMPOSTING FACILITY, PLANNING AND CONSTRUCTION. | | | | | | IBERIA | | 2
|
| OTHER AND LOCAL FUNDS | 17,000 | 4,575,000 | | 4,592,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 525,000 | 1,200,000 | | 1,725,000 | 0 | 0 | | |
|
| | $542,000 | $5,775,000 | | $6,317,000 | $0 | $0 | | |
|
| 1305 | | IBERIA PARISH INDUSTRIAL PARK, PLANNING AND CONSTRUCTION. | | | | | | IBERIA | | 2
|
| STATE GENERAL FUND (DIRECT) | 2,103,000 | 0 | | 2,103,000 | 0 | 0 | | |
|
| | $2,103,000 | $0 | | $2,103,000 | $0 | $0 | | |
|
| 1306 | | LEVEE ROAD - RECONSTRUCTION AND OVERLAY | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 1,667,520 | 0 | | 1,667,520 | 0 | 0 | | |
|
| | $1,667,520 | $0 | | $1,667,520 | $0 | $0 | | |
|
| 1307 | | SOUTH LEWIS STREET WIDENING - U. S. HWY 90 TO PORT OF IBERIA | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 239,400 | 3,743,400 | | 3,982,800 | 0 | 0 | | |
|
| | $239,400 | $3,743,400 | | $3,982,800 | $0 | $0 | | |
|
| 1308 | | SEWER PLANT ACCESS ROAD | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 195,840 | 0 | | 195,840 | 0 | 0 | | |
|
| | $195,840 | $0 | | $195,840 | $0 | $0 | | |
|
| 1309 | | EMILE VERRETT ROAD SEWER LIFT STATION | | | | | | IBERIA | | 2
|
| GENERAL OBLIGATION BONDS | 560,600 | 0 | | 560,600 | 0 | 0 | | |
|
| | $560,600 | $0 | | $560,600 | $0 | $0 | | |
|
| 1310 | | IBERIA PARISH BUSINESS AND TECHNOLOGY INCUBATOR | | | | | | IBERIA | | 2
|
| OTHER AND LOCAL FUNDS | 55,000 | 0 | | 55,000 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 477,000 | 0 | | 477,000 | 0 | 0 | | |
|
| | $532,000 | $0 | | $532,000 | $0 | $0 | | |
|
| NUMBER OF PROJECTS FOR AGENCY = 11 | | | | | | | | |
|
| AGENCY TOTAL | $10,445,293 | $14,563,050 | | $25,008,343 | $0 | $0 | | |
|
| AGENCY: J24 IBERVILLE PARISH | | | | | | | | | |
|
| 1171 | | IBERVILLE PARISH POLICE JURY, HEALTH UNIT/CORONER | | | | | | IBERVILLE | | 2
|
| OTHER AND LOCAL FUNDS | 595,136 | 0 | | 595,136 | 0 | 0 | | |
|
| GENERAL OBLIGATION BONDS | 1,368,451 | 0 | | |